Loading...
R-09-01-22-9E2 - 1/22/2009RESOLUTION NO. R -09 -O1 -22-9E2 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Excel Construction Services, LLC for the 7.5 MG High Service Pump Improvements Project at the Water Treatment Plant, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Contract Change Order No. 1 to the Contract with Excel Construction Services, LLC for the 7.5 MG High Service Pump Improvements Project at the Water Treatment Plant, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of January, 2009. 0:\WDOX\RESOLUTI\R90122E2.DOC/rmc ATTEST: SARA L. WHITE, City Secretary 2 ALAN MCGRAW, Mayor City of Round Rock, Texas Change Order No.1 EXHIBIT nAn Project Name: Water Treatment Plant High Service Pump Station Improvements Consultants Project No.: 8077-61993 Project Owner: City of Round Rock 212 Commerce Cove, Round Rock, TX 78664 Date of Issuance: December 12, 2008 Project Contractor: Excel Construction Services, LLC Date of Contract: March 4, 2008 Date of Notice to Proceed: July 7, 2008 Original Completion Date: May 18, 2009 Contract Period: 287 Calendar Days to Substantial and 315 Calendar Days to Final Completion It is agreed to modify the Contract referred to above as follows: CPR # ITEM AND DESCRIPTION OF CHANGES CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME 1 Owner request to relocate proposed location of new High Service Pump Station to accommodate future ground storage tanks, and add new 54 -inch isolation valve on finished water pipe to facilitate future construction of ground storage tanks without pump station shut down. $106,842.00 None Difference Net $106,842.00 None Summary: It is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order Contract Time prior to this Change Order $ 940.200.00 Net Increase (decrease) of this Change Order $ 106.842.00 Revised Contract Price with all approved Change Orders $1.047,042.00 315 Calendar Days — May 18, 2009 Net Increase (decrease) of this Change Order NA Revised Contract Time with all approved Change Orders 315 Calendar Days — May 18, 2009 The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the original Contract as though included therein. Accep ed f ntractor by: •'�� t comme -dforA ,py. Approved for Owner .y/ P I by (Camp Dresser & McKee Inc.): 5 2c Date: t I C(44 Date: 12/17108 Attest: Date: Approved: (Other - when required) Date: Distribution: 0 Owner 0 Contractor 0 Office 0 Field 0 Other DATE: January 15, 2009 SUBJECT: City Council Meeting — January 22, 2009 ITEM: 9E2. Consider a resolution authorizing the Mayor to execute Change Order No. 1 to the construction contract with Excel Construction Services, LLC for the 7.5 MG High Services Pump Improvements Project at the Water Treatment Plant. Department: Staff Person: Justification: Water and Wastewater Utilities Michael Thane, P.E., Director of Utilities Change Order No. 1 includes the relocation of the new 7.5 MG High Service Pump to the east of the existing high service pumps location, and not to the north as shown on the original construction plans. This relocation was determined after the completion of the original construction plans, but before the completion of the City's Water Distribution System Master Plan Update. The water master plan called for additional storage at the Water Treatment Plant (WTP). In order to accommodate this storage without having to acquire property from Texas Crush Stone, the projects' original site had to be relocated east of the existing high service pumps. This relocation will incur additional cost associated with electrical work as well as the addition of a 54 -inch Butterfly Valve to allow this new 7.5 MG High Service Pump to remain in operation during the construction of future storage at the WTP. Funding: Cost: $106,842.00 Source of funds: Capital Project Funds (Self -Financed Utility) Amount % Change Original Contract $940,200.00 N/A Change Order No. 1 $106,842.00 11.36 % Revised Contract $1,047,042.00 11.36 % Outside Resources: Excel Construction Services, LLC Camp, Dresser and McKee, Inc. - CONTINUED ON NEXT PAGE - Background Information: The initial contract was approved by Council on June 26, 2008. This project is necessary to deliver the full treatment capacity of 52 million gallons per day (mgd) into our water distribution system. Furthermore, the City of Round Rock entered into an Interlocal Agreement for Emergency Water Supply with Cedar Park on May 24, 2007. The agreement requires the City to provide Cedar Park with 4.0 mgd of potable water by the summer of 2009. In addition to this project, two other projects are required to meet our obligations under the Interlocal Agreement. These projects are the RM 1431 36" Water Line project, which is complete, and the RM 1431 2.0 MG Elevated Water Storage Tank project, which is currently under construction. Cedar Park is contributing $1,000,000 toward these projects per the agreement. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS Change Order No.1 Project Name: Water Treatment Plant High Service Pump Station Improvements Consultants Project No.: 8077-61993 Project Owner: City of Round Rock 212 Commerce Cove, Round Rock, TX 78664 Date of Issuance: December 12, 2008 Project Contractor: Excel Construction Services, LLC Date of Contract: March 4, 2008 Date of Notice to Proceed: July 7, 2008 Original Completion Date: May 18, 2009 Contract Period: 287 Calendar Days to Substantial and 315 Calendar Days to Final Completion It is agreed to modify the Contract referred to above as follows: CPR # ITEM AND DESCRIPTION OF CHANGES CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME 1 Owner request to relocate proposed location of new High Service Pump Station to accommodate future ground storage tanks, and add new 54 -inch isolation valve on finished water pipe to facilitate future construction of ground storage tanks without pump station shut down. $106,842.00 None Difference Net $106,842.00 None Summary: It is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order Contract Time prior to this Change Order $ 940,200.00 Net Increase (decrease) of this Change Order $ 106,842.00 Revised Contract Price with all approved Change Orders $ 1,047,042.00 315 Calendar Days — May 18, 2009 Net Increase (decrease) of this Change Order NA Revised Contract Time with all approved Change Orders 315 Calendar Days — May 18, 2009 The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the original Contract as though included therein. Accep ed f ntractor by: comme d for A p I by (Camp Dresser & McKee Inc.): Approved for Owner 5,19C ft Attest: Approved: (Other - when required) Distribution: 0 Owner ❑ Contractor 0 Office 2- Q - v- "Z-2-- 9t2_ Date: t Q, jt � f r3 Date: /x/17/06 Date: Date: ❑ Field 0 Other