R-09-01-22-9E3 - 1/22/2009RESOLUTION NO. R -09 -O1 -22-9E3 WHEREAS, the City of Round Rock has duly advertised for bids for the Unit 2 of the 2006-2007 Wastewater Collection System Rehabilitation Project, and WHEREAS, Patin Construction, LLC has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Patin Construction, LLC, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Patin Construction, LLC for the Unit 2 of the 2006-2007 Wastewater Collection System Rehabilitation Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of January, 2009. Yi4 ALAN MCGRAW, Mayor City of Round Rock, Texas SARA L. WHITE, City Secretary 0:\WDOX\RESOLUTI\R90122E3.DOC/rmc DATE: January 15, 2009 SUBJECT: City Council Meeting — January 22, 2009 ITEM: 9E3. Consider a resolution authorizing the Mayor to execute a construction contract with Patin Construction, LLC for Unit 2 of the 2006-2007 Wastewater Collection System Rehabilitation Project. Department: Staff Person: Justification: Water and Wastewater Utilities Michael Thane, P.E., Director of Utilities The City is required by the Texas Commission on Environmental Quality (TCEQ) to inspect and repair its wastewater collection system located over the Edwards Aquifer Recharge Zone, according to Chapter 213 of the Texas Administrative Code. This rehabilitation project was divided into two separately bid units in order to expedite the repair work to maintain the required schedule with the TCEQ. This Unit 2 contract for rehabilitating the wastewater collection system which represents a potential for public health and/or safety issues, includes point repairs, in-place lining, and conventional line replacement. There were seven bidders on Unit 2. Funding: Cost: $747,980.00 Source of funds: WW Utility Fund (F260) Outside Resources: RJN Group, Inc. (Engineering Consultant) Background Information: This project rehabilitates defective sewers as determined from the 2005-2006 Wastewater Collection System Inspection Project in three Edwards Aquifer Basins (BC20-Z, LC09-Z, and LC17-Z). The elimination of defects not only helps protect the aquifer, but also reduces inflow and infiltration entering the sewer system. These repair activities reduce the City's treatment cost from the LCRA and BRA, who respectively own and operate the Brushy Creek Regional Wastewater Treatment Plant. Public Comment: N/A