R-09-01-22-9F1 - 1/22/2009RESOLUTION NO. R -09-01-22-9F1
WHEREAS, the Round Rock Transportation System Development
Corporation ("RRTSDC") has previously adopted a Transportation
Capital Improvement Plan ("Plan"), and
WHEREAS, the RRTSDC wishes to amend said Plan, and
WHEREAS, the bylaws of the RRTSDC require that said amendments
to the Plan be approved by the City Council, and
WHEREAS, the City Council wishes to approve said amendments to
the Plan, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the amendment to the Transportation Capital Improvement
Plan approved by the Round Rock Transportation System Development
Corporation, which is attached hereto as Exhibit "A", is hereby
approved.
The City Council hereby finds and declares that written notice
of the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to
the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered
and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 22nd day of January, 2009.
ATTEST:
SARA L. WHITE, City Secretary
0:\WDOX\RESOLUTI\rrtsdc\R90122F1.DOC/rmc
ALAN MCGRAW, Mayor
City of Round Rock, Texas
2
O
H
Q
0
K O
O U
O.
U 2
zo
w_I
f w
>>
aCeuJ
2
- N
a- }
N
d Z
O
04
Z
0 i
Z
0
a.
Z ~
Q Y
I U
F O
0
z
0
K
3
T.
33
sr
Fm
U 0
21.1
oda
Qu m
From RM 620 to Sam Bess Rd
To
3
17,
3
83
5,4
%
From FM 1460 to CR 122
900' North of US79 to Old Settler's Blvd
FM 1460/AW Grime
3
8
8
3
Greenlawn Interchange
$4.042.766 a
13
from Westinghouse Road to FM 143
3
n
8
IH 35 @ Heater's Crossing
Construct railroad grade separation
3
0
gn and construct traffic signals
O
Various locations
3
3
U
From FM 1460 to CR 195
0
E
gg
Tg
5
8
$3,000.000 d
13
N
Construct half of a 4 -lane divided roadway
m
3
u
Wyoming Springs Drive
Design and construct MAD 4
13
U
5
8
E
k u
1000 feet in all directions of intersection
5
r.
13
2
3
0
University Boulevard to Chandler Crete
Arterial M (M-5)
a
E
0
8
0
O
U n
gv
U
Arterial M (M-4)
0
E
0
ess Boulevard to Arterial M
U
E.
100010010011 directions of intersection
South Mays at Gattis School Road
a
5
O
I1-1-35 frontage road
From Arterial M to the no
Q
Design MAD 4
Cypress Cove extension to Paloma
Arterial M (M-3)
Design MAD 4
Chisholm Trail to Creekbend Boulevard
A
4
a
a
8
0
From Louis Henna to the southern ETJ
AW Grimes Boulevard
g S
Z
L`
..521eqqin
Z
O
1-
Q
C
O
aCC
Co
OV
z
aW
I-0
zo
zO
W J
W
W >
0
K 2
wa
2 1-
_s J
Q }
z
az
Q O
Q
Z
Z
Oce
¢a
C Z
Og
N H
z
▪ U
z
Z
O
d'
a
Ja
6-9
E
V
From Geltis School Rd to MKT ROW
Cn a
E
U
From US 79 m Louis Henna Blvd
AW Grimes Blvd (Arterial B)
E
U
Construct 4 lane di
From Louis Henna Blvd lc IH 35 Frontage Road
Greenlawn Extension
E
U
Construct frontage road turnarounds
FM 1325/Louis Henna/Hester's Crossing
IH 35 Turnarounds
Z
Alternatives to alleviate congestion
IH -35 & RM 620 and IH 35 & US 79
Feasibility Stud
Construct 4 -lane divided roadwa
From Teravista to Chandler Road
ve (Arterial "S")
O
E
0
Construct 4 -lane d
From IH -35 to Oakmont D
Construct half of a 4 -lane divided roadway
Assist City in interagency coordination for SH 45 1Completed
E
Construct 2 -lane d
From Gattis School Road to CR 123
Red Bud Lane (CR 122, Phases
From CR 12310 US 79
Red Bud Lane (CR 122, Phase 3)
574
E
U
rc
1
mU
m ;
3 a
Street Improvements
8
E
E
U
Traffic Signal Coordination
E
8
8
CR195 to CR 110
Acquire ROW for SH 45
its to Round Rock West
DATE: January 15, 2009
SUBJECT: City Council Meeting — January 22, 2009
ITEM: 9F1. Consider a resolution approving the action of the Round Rock
Transportation System Development Corporation in amending the
Transportation Capital Improvement Program (TCIP).
Department:
Staff Person:
Justification:
Transportation Services
Tom Martin, P.E., Director of Transportation Services
1. Provide funding to reimburse Behren's Ranch for their portion of Wyoming Springs Drive in
the amount of $1,616,552.00.
2. Provide funding for Arterial A in the amount of $400,000; these funds are to be used for
contingency on this project.
3. Provide funding in the amount of $60,065.00 for AT&T fiber optic relocation completed
during the Forest Creek project.
4. Provide funding for North Mays Extension (Arterial "M") Section M-3 in the amount of
$1.289 million; these funds are required to fully fund design of this project. The project
limits are from the extension of Cypress Cove to Paloma Drive.
5. Provide funding for North Mays Extension (Arterial "M") Section M-4 in the amount of
$772,500; these funds are required to fully fund design of this project. The project limits
are from the Chandler Creek Tributary to Cypress Cove (Arterial "L").
6. Provide funding for North Mays Extension (Arterial "M") Section M-5 in the amount of
$711,000; these funds are required to fully fund design of this project. The project limits
are from University Drive to the Chandler Creek Tributary.
7. Provide funding for Cypress Cove (Arterial "1") in the amount of $235,000; these funds are
required to fully fund design of this project. The project limits are from the North Mays
Extension to Cypress Boulevard.
8. Provide funding for Arterial "L" in the amount of $776,000; these funds are required to fully
fund design of this project. The project limits are from the north IH -35 frontage road to the
North Mays Extension.
9. Provide funding for Red Bud Lane in the amount of $2.75 million. The funds are required to
fully fund design, right-of-way acquisition, utility relocation, and construction. The project
limits are from C.R. 123 to Woodland Loop.
10. Provide funding for the design of intersection improvements at the North Mays/US 79
intersection in the amount of $616,000.
- CONTINUED ON NEXT PAGE -
11. Provide funding for the design of intersection improvements at the South Mays/Gattis
School Road intersection in the amount of $535,000.
12. Provide funding for A.W. Grimes Boulevard in the amount of $350,000; these funds are
required to fully fund the design of this project. Project limits are from Louis Henna to the
southern ETJ.
13. Provide funding for FM 3406 in the amount of $910,000; these funds are required to fully
fund the design of this project. Project limits are from Chisholm Trail Road to Creek Bend.
14. Provide funding for professional consulting services in the amount of $250,000. These
funds are required to perform preliminary engineering work on various projects throughout
the City.
15. Reduction to actual expenses for the following projects:
a. Red Bud Lane Phase 3, ($484,731.00)
b. Oakmont, ($575,441.00)
c. Tera Vista, ($410.00)
d. Arterial T (Seton Parkway), ($808,608.00)
Funding:
Cost: $9,401,927.00
Source of funds: 4B -Round Rock Transportation System Development Corporation
Outside Resources: N/A
Background Information:
The TCIP is a multi-year spending plan for improvements to major roads and arterials in the
City. Funding for this plan is provided through the % cent sales tax established for the purpose
of transportation system improvements that support economic development.
Public Comment:
Public hearing held on January 22, 2009 by the Round Rock Transportation System
Development Corporation.