Loading...
R-09-01-22-9F1 - 1/22/2009RESOLUTION NO. R -09-01-22-9F1 WHEREAS, the Round Rock Transportation System Development Corporation ("RRTSDC") has previously adopted a Transportation Capital Improvement Plan ("Plan"), and WHEREAS, the RRTSDC wishes to amend said Plan, and WHEREAS, the bylaws of the RRTSDC require that said amendments to the Plan be approved by the City Council, and WHEREAS, the City Council wishes to approve said amendments to the Plan, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the amendment to the Transportation Capital Improvement Plan approved by the Round Rock Transportation System Development Corporation, which is attached hereto as Exhibit "A", is hereby approved. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of January, 2009. ATTEST: SARA L. WHITE, City Secretary 0:\WDOX\RESOLUTI\rrtsdc\R90122F1.DOC/rmc ALAN MCGRAW, Mayor City of Round Rock, Texas 2 O H Q 0 K O O U O. U 2 zo w_I f w >> aCeuJ 2 - N a- } N d Z O 04 Z 0 i Z 0 a. Z ~ Q Y I U F O 0 z 0 K 3 T. 33 sr Fm U 0 21.1 oda Qu m From RM 620 to Sam Bess Rd To 3 17, 3 83 5,4 % From FM 1460 to CR 122 900' North of US79 to Old Settler's Blvd FM 1460/AW Grime 3 8 8 3 Greenlawn Interchange $4.042.766 a 13 from Westinghouse Road to FM 143 3 n 8 IH 35 @ Heater's Crossing Construct railroad grade separation 3 0 gn and construct traffic signals O Various locations 3 3 U From FM 1460 to CR 195 0 E gg Tg 5 8 $3,000.000 d 13 N Construct half of a 4 -lane divided roadway m 3 u Wyoming Springs Drive Design and construct MAD 4 13 U 5 8 E k u 1000 feet in all directions of intersection 5 r. 13 2 3 0 University Boulevard to Chandler Crete Arterial M (M-5) a E 0 8 0 O U n gv U Arterial M (M-4) 0 E 0 ess Boulevard to Arterial M U E. 100010010011 directions of intersection South Mays at Gattis School Road a 5 O I1-1-35 frontage road From Arterial M to the no Q Design MAD 4 Cypress Cove extension to Paloma Arterial M (M-3) Design MAD 4 Chisholm Trail to Creekbend Boulevard A 4 a a 8 0 From Louis Henna to the southern ETJ AW Grimes Boulevard g S Z L` ..521eqqin Z O 1- Q C O aCC Co OV z aW I-0 zo zO W J W W > 0 K 2 wa 2 1- _s J Q } z az Q O Q Z Z Oce ¢a C Z Og N H z ▪ U z Z O d' a Ja 6-9 E V From Geltis School Rd to MKT ROW Cn a E U From US 79 m Louis Henna Blvd AW Grimes Blvd (Arterial B) E U Construct 4 lane di From Louis Henna Blvd lc IH 35 Frontage Road Greenlawn Extension E U Construct frontage road turnarounds FM 1325/Louis Henna/Hester's Crossing IH 35 Turnarounds Z Alternatives to alleviate congestion IH -35 & RM 620 and IH 35 & US 79 Feasibility Stud Construct 4 -lane divided roadwa From Teravista to Chandler Road ve (Arterial "S") O E 0 Construct 4 -lane d From IH -35 to Oakmont D Construct half of a 4 -lane divided roadway Assist City in interagency coordination for SH 45 1Completed E Construct 2 -lane d From Gattis School Road to CR 123 Red Bud Lane (CR 122, Phases From CR 12310 US 79 Red Bud Lane (CR 122, Phase 3) 574 E U rc 1 mU m ; 3 a Street Improvements 8 E E U Traffic Signal Coordination E 8 8 CR195 to CR 110 Acquire ROW for SH 45 its to Round Rock West DATE: January 15, 2009 SUBJECT: City Council Meeting — January 22, 2009 ITEM: 9F1. Consider a resolution approving the action of the Round Rock Transportation System Development Corporation in amending the Transportation Capital Improvement Program (TCIP). Department: Staff Person: Justification: Transportation Services Tom Martin, P.E., Director of Transportation Services 1. Provide funding to reimburse Behren's Ranch for their portion of Wyoming Springs Drive in the amount of $1,616,552.00. 2. Provide funding for Arterial A in the amount of $400,000; these funds are to be used for contingency on this project. 3. Provide funding in the amount of $60,065.00 for AT&T fiber optic relocation completed during the Forest Creek project. 4. Provide funding for North Mays Extension (Arterial "M") Section M-3 in the amount of $1.289 million; these funds are required to fully fund design of this project. The project limits are from the extension of Cypress Cove to Paloma Drive. 5. Provide funding for North Mays Extension (Arterial "M") Section M-4 in the amount of $772,500; these funds are required to fully fund design of this project. The project limits are from the Chandler Creek Tributary to Cypress Cove (Arterial "L"). 6. Provide funding for North Mays Extension (Arterial "M") Section M-5 in the amount of $711,000; these funds are required to fully fund design of this project. The project limits are from University Drive to the Chandler Creek Tributary. 7. Provide funding for Cypress Cove (Arterial "1") in the amount of $235,000; these funds are required to fully fund design of this project. The project limits are from the North Mays Extension to Cypress Boulevard. 8. Provide funding for Arterial "L" in the amount of $776,000; these funds are required to fully fund design of this project. The project limits are from the north IH -35 frontage road to the North Mays Extension. 9. Provide funding for Red Bud Lane in the amount of $2.75 million. The funds are required to fully fund design, right-of-way acquisition, utility relocation, and construction. The project limits are from C.R. 123 to Woodland Loop. 10. Provide funding for the design of intersection improvements at the North Mays/US 79 intersection in the amount of $616,000. - CONTINUED ON NEXT PAGE - 11. Provide funding for the design of intersection improvements at the South Mays/Gattis School Road intersection in the amount of $535,000. 12. Provide funding for A.W. Grimes Boulevard in the amount of $350,000; these funds are required to fully fund the design of this project. Project limits are from Louis Henna to the southern ETJ. 13. Provide funding for FM 3406 in the amount of $910,000; these funds are required to fully fund the design of this project. Project limits are from Chisholm Trail Road to Creek Bend. 14. Provide funding for professional consulting services in the amount of $250,000. These funds are required to perform preliminary engineering work on various projects throughout the City. 15. Reduction to actual expenses for the following projects: a. Red Bud Lane Phase 3, ($484,731.00) b. Oakmont, ($575,441.00) c. Tera Vista, ($410.00) d. Arterial T (Seton Parkway), ($808,608.00) Funding: Cost: $9,401,927.00 Source of funds: 4B -Round Rock Transportation System Development Corporation Outside Resources: N/A Background Information: The TCIP is a multi-year spending plan for improvements to major roads and arterials in the City. Funding for this plan is provided through the % cent sales tax established for the purpose of transportation system improvements that support economic development. Public Comment: Public hearing held on January 22, 2009 by the Round Rock Transportation System Development Corporation.