Loading...
R-09-02-12-10F1 - 2/12/2009RESOLUTION NO. R -09-02-12-10F1 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Page Southerland Page, L.L.P. for the Southwest Downtown District Utility and Street Improvements Phase II Project, and WHEREAS, Page Southerland Page, L.L.P. has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 1 with Page Southerland Page, L.L.P., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 1 to the Contract with Page Southerland Page, L.L.P., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of February, 2009. 0:\WDOX\RESOLUTI\R90212F1.DOC/rmc ATTEST: SARA L. WHITE, City Secretary 2 MCGRAW, Mayor City of Round Rock, Texas STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PAGE SOUTHERLAND PAGE, L.L.P. ("Engineer") ADDRESS: 400 W. Cesar Chavez. Suite 500, Austin. TX 78701 PROJECT: Southwest Downtown District Utility and Street Improvements Phase II This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Page Southerland Page, LLP, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 23rd day of September, 2004 for the Southwest Downtown District Utility and Street Improvements Phase II Project in the amount of $226,743.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $79,780.00 to a total of $306,523.00; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $79,780.00 the lump sum amount payable under the Contract for a total of $306,523.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract #1 149883; 0199.0038 ST -01 -AREA EXHIBIT 2 Rev.12/01 /08 84275 PAGE SOUTHERLAND PAGE, L.L.P. By: Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Alan McGraw, Mayor Stephan L. Sheets, City Attorney D ate Supplemental Contract #1 Rev.12/01/08 149883; 0199.0038 84275 ST -0I -AREA 2 ADDENDUM TO EXHIBIT B Engineering Services The work effort and management of the project included in this contract will be subject to review and approval by the City of Round Rock. The Engineer shall provide the following services: Bid and Award • make final changes to bid documents • assist in advertising • conduct pre-bid meeting(s) • prepare addendums as required • evaluate bids • prepare bid tabulation • write letter of recommendation regarding award of bid • attend City Council meeting for bid award • conduct pre -construction meeting(s) Construction Services • conduct Environmental site pre -construction meeting(s) • attend weekly on site construction review meeting(s) • review shop drawings • respond to RFI's • address design clarifications and issue ASI's • review monthly construction draw(s) • provide administrative services associated with the above mentioned work Project Close Out • review of contractor's final punch list • project walk through to confirm contractor's punch list items completed and develop punch list of additional items • final project walk through to confirm all punch list items complete • review of final pay estimate • write letter of recommendation regarding acceptance of project • attend one-year warranty project walk through ADDENDUM TO EXHIBIT C Work Schedule The changes to the Work Schedule for this project are as follows: None EXHIBIT D Fee Schedule The fee schedule for this project is as follows: Project Lump Sum Fee Summary Bid and Award $9,700.00 Construction Phase Services $55,200.00 (Based on 12 months @ 4,600 per month) Project Final Close out $6,880.00 Reimbursable Expenses (not to exceed) $8,000.00 Estimates included (but not limited to) Travel Expenses Couriered Deliveries Out of town deliveries Postage Photography/color copies/other reproductions Printing for Owner/Architect/Contractor's use TOTAL LUMP SUM FEE $79,780.00 DATE: February 4, 2009 SUBJECT: City Council Meeting — February 12, 2009 ITEM: 10F1. Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 1 with Page Southerland Page, LLP for the Southwest Downtown District Utility and Street Improvements Phase II project. Department: Staff Person: Justification: Transportation Services Thomas Martin, P.E., Director of Transportation Services This contract includes the bid phase and construction phase services which was not included in the original contract (R04 -09-23-13B1) that was approved by Council September 23, 2004 in the amount of $226,743, with an additional contingency amount of $20,000 for reimbursable expenses. Funding: Cost: $79,780.00 Source of funds: GO Bonds 2001 Outside Resources: N/A Background Information: The original contract (R04-09-23-1361) was approved by Council September 23, 2004 in the amount of $226,743, with an additional contingency amount of $20,000 for reimbursable expenses. Of the original contract, $33,000 was earmarked for construction administration; the portion was charged against additional services in the amount of $38,246.25. Those billings constituted separation of the project documents into two separate biddable phases of Phase 1A and Phase 1B; coordination with others at the request of the City regarding proposed work to affected areas of downtown pertaining to this project; negotiations in support of the City with utility entities; support and provision of requests and documents of new City Project Managers; additional reviews and revisions beyond one year after the initial proposed bid date for Phase 1B and updating of documents regarding Phase 1B bid and completion of Phase 1A. This Supplemental Agreement will remove the original construction administration cost of $33,000 and add it to this portion of the contract agreement. This contract includes the bid phase and construction phase for street, sidewalk, drainage, sewer and water utilities for the area around the Southwest Downtown. Improvements will include sections of Brown, West Main, Bagdad, Florence, Harris and San Saba Streets. Public Comment: N/A STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PAGE SOUTHERLAND PAGE, L.L.P. ("Engineer") ADDRESS: 400 W. Cesar Chavez, Suite 500, Austin, TX 78701 PROJECT: Southwest Downtown District Utility and Street Improvements Phase II This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Page Southerland Page, LLP, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 23rd day of September, 2004 for the Southwest Downtown District Utility and Street Improvements Phase II Project in the amount of $226,743.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $79,780.00 to a total of $306,523.00; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $79,780.00 the lump sum amount payable under the Contract for a total of $306,523.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract #1 Rev.12/01/08 149883; 0199.0038 84275 ST -01 -AREA R - Oc) - 02.- IZ- for l 1 PAGE SOUTHERLAND PAGE, L.L.P. By: Date CITY OF RQUND ROCK By: ► •� Alan McGraw, Mayor 2. .v9 Date Supplemental Contract #1 149883; 0199.0038 ST -01 -AREA 2 Page Southerland Page, L.L.P. By: PSP Architect — Engineers, Inc., Its: Man .. • Ing Partner Matthew F. Kreisle, 111 Its: Principal AP ' R r VED AS O FORM: Steph n L. Sheets, City Attorney Rev.12/01/08 84275 ADDENDUM TO EXHIBIT B Engineering Services The work effort and management of the project included in this contract will be subject to review and approval by the City of Round Rock. The Engineer shall provide the following services: Bid and Award • make final changes to bid documents • assist in advertising • conduct pre-bid meeting(s) • prepare addendums as required • evaluate bids • prepare bid tabulation • write letter of recommendation regarding award of bid • attend City Council meeting for bid award • conduct pre -construction meeting(s) Construction Services • conduct Environmental site pre -construction meeting(s) • attend weekly on site construction review meeting(s) • review shop drawings • respond to RFI's • address design clarifications and issue ASI's • review monthly construction draw(s) • provide administrative services associated with the above mentioned work Project Close Out • review of contractor's final punch list • project walk through to confirm contractor's punch list items completed and develop punch list of additional items • final project walk through to confirm all punch list items complete • review of final pay estimate • write letter of recommendation regarding acceptance of project • attend one-year warranty project walk through ADDENDUM TO EXHIBIT C Work Schedule The changes to the Work Schedule for this project are as follows: None EXHIBIT D Fee Schedule The fee schedule for this project is as follows: Bid and Award Project Lump Sum Fee Summary $9,700.00 Construction Phase Services $55,200.00 (Based on 12 months @ 4,600 per month) Project Final Close out $6,880.00 Reimbursable Expenses (not to exceed) $8,000.00 Estimates included (but not limited to) Travel Expenses Couriered Deliveries Out of town deliveries Postage Photography/color copies/other reproductions Printing for Owner/Architect/Contractor's use TOTAL LUMP SUM FEE $79,780.00