R-03-09-25-14C4 - 9/25/2003RESOLUTION NO. R -03-09-25-14C4 WHEREAS, the City of Round Rock entered into a contract on August 14, 2003 with Chasco Contracting entitled "Agreement Between Owner and Construction Manager at Risk Where Construction Manager at Risk Is Also the Constructor," and such contract is for improvements to the Dell Diamond/United Heritage Facility, and WHEREAS, the terms of such contract require submission by Chasco Contracting of "Amendment No. 1 to Agreement Between Owner and Construction Manager at Risk," which Amendment No. 1 is to set forth the Guaranteed Maximum Price as defined in the contract, and WHEREAS, the City Council wishes to accept such Amendment No. 1 to the referenced Agreement, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Amendment No. 1 with Chasco Contracting for the Guaranteed Maximum Price as stated therein, and same is for construction improvements to the Dell Diamond/United Heritage Facility, a copy of said Amendment No. 1 being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the publicus required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. @PFDesktop\::ODMA/WORLDOX/0:/WDOX/RESOLUTI/R30925C4.WPD/jkg RESOLVED this 25th day of September, 2003. /14. / WELL, ayor ity of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secretary, @PFDesktop\::ODMA/WORLDOX/O•/WDOX/RESOLUT1/R30925C4.WPD/jkg AMENDMENT NO. 1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER AT RISK Pursuant to Article 2 of the Agreement, dated the day of the month of August, 2003, by and between the City of Round Rock, Texas (the Owner) and Chasco Contracting (the Construction Manager), for construction of improvements to the Dell Diamond/United Heritage Facility including construction of six (6) additional suites; an 850 -seat Home Run Porch with roof, elevated walkway, and signage; and a light field oast cid,ianA gate, inducting rc}rn,ativn of intCiaAivc play alma (the Project), the Owner and the Construction Manager hereby establish the scope of the Project, a Guaranteed Maximum Price, and Completion Date for the Work as set forth below. Article 1 THE WORK The scope of the Project included in this Amendment, and its Guaranteed Maximum Price, is for the work in its entirety for the construction of the above -referenced Project. Article 2 EXHIBITS The following exhibits supplement this Agreement: Exhibit "A" Construction Manager's Guaranteed Maximum Price Scope Narrative, including Clarifications, Qualifications and GMP Cost Breakdown Exhibit "B" Drawings, Specifications and Addenda Article 3 GUARANTEED MAXIMUM PRICE The Construction Manager's Guaranteed Maximum Price (the GMP) for the Work, including the estimated Cost of the Work as defined in Article 5 and the Construction Manager's Fee as defined in Article 4, is the sum of One Million Eight Hundred Seventy -Seven Thousand Four Hundred Forty -Four and no/100 Dollars ($1,877,440.00). This price is for the performance of the Work in accordance with the Contract Documents and any attached exhibits. Article 4 COMPLETION DATE The Substantial Completion Date for the Project is April 1, 2004. 1 1 a 2 EXHIBIT OWNER: CONSTRUCTION MANAGER: City of Round Rock, Texas Chasco Contracting By: By: Nyle Maxwell, Mayor Date: Date: ATTEST: Christine R. Martinez, City Secretary 2 Temple Aday, President i i I t 5 � j I � I t.fit i s I i i W-*E DELL DIAMOND i, ROUND ROCK TDCAS DATE: September 19, 2003 SUBJECT: City Council Meeting - September 25, 2003 ITEM: 14.C.4. Consider a resolution authorizing the Mayor to execute Amendment No. 1 to Agreement Between Owner and Construction Manager -at -Risk with Chasco Contracting for construction improvements to the Dell Diamond/United Heritage Center. Resource: Tom Word, Chief of Public Works Operations Larry Madsen, Construction Manager History: Chasco Contracting was approved as construction -manager -at -risk for Dell Diamond/United Heritage Center at the August 14th Council meeting. Article 3 of the agreement requires a Guaranteed Maximum Price for the work. This resolution will establish the GMP for the project. Funding: Cost: Guaranteed Maximum Price: Source of funds: Convention Center Expansion Funds -not to exceed $800,000 Round Rock Baseball Outside Resources: Chasco Contracting Impact/Benefit: Improvements to the stadium in preparation for a Triple A team. Public Comment: N/A Sponsor: N/A EXECUTED DOCUMENT FOLLOWS • AMENDMENT NO. 1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER AT RISK Pursuant to Article 2 of the Agreement, dated the i+ Clay of the month of August, 2003, by and between the City of Round Rock, Texas (the Owner) and Chasco Contracting (the Construction Manager), for construction of improvements to the Dell Diamond/United Heritage Facility including construction of six (6) additional suites; an 850 -seat Home Run Porch with roof, elevated walkway, and signage; aad-a ii ht ativn of i, ctiire plararea-(the Project), the Owner and the Construction Manager hereby establish the scope of the Project, a Guaranteed Maximum Price, and Completion Date for the Work as set forth below. • • Article 1 THE WORK The scope of the Project included in this Amendment, and its Guaranteed Maximum Price, is for the work in its entirety for the construction of the above -referenced Project. Article 2 EXHIBITS The following exhibits supplement this Agreement: Exhibit "A" Construction Manager's Guaranteed Maximum Price Scope Narrative, including Clarifications, Qualifications and GMP Cost Breakdown Exhibit "B" Drawings, Specifications and Addenda Article 3 GUARANTEED MAXIMUM PRICE The Construction Manager's Guaranteed Maximum Price (the GMP) for the Work, including the estimated Cost of the Work as defined in Article 5 and the Construction Manager's Fee as defined in Article 4, is the sum of One Million Eight Hundred Seventy -Seven Thousand Four Hundred Forty -Four and no/100 Dollars ($1,877,440.00). This price is for the performance of the Work in accordance with the Contract Documents and any attached exhibits. Article 4 COMPLETION DATE The Substantial Completion Date for the Project is April 1, 2004. R-o3-cq5 14e 1 OWNER: CONSTRUCTION MANAGER: City of Round Rock, Texas Chasco Contracting By: Date: 1, Mayor Q-- 03 ATTEST: By: Date: ie. "d--,qcutikk,„. Christine R. Martinez, City Secretary 2 Temp e Aday, ' e 'dent •��eesco Nraacr►eF Exhibit "A" Guaranteed Maximum Price Scope Narrative and GMP Cost Breakdown Improvements to The Dell Diamond / United Heritage Facility Prepared For The City of Round Rock TABLE OF CONTENTS September 24, 2003 Section 1 Description of Work Clarifications, Assumptions, and Qualifications Exclusions Section 2 Cost Summary Cost Breakdown 'Improvements to The Dell Diamond United Heritage Facility Guaranteed Maximum Price Clarifications, Assumptions, and Qualifications General Note: Unless otherwise noted below, all sections are per plans and specifications shown on the GMP document list. Qualifications or modifications from this list are noted below: DESIGN SERVICES • Architectural and engineering services are not included in this estimate • Construction Managers price does not include any cost for professional engineering. All professional engineering shall be by the Engineer of Record or is covered under a separate agreement between Round Rock Baseball and the structural steel and precast concrete suppliers. GENERAL REQUIREMENTS Supervision and Administration • Project supervision includes a Project Superintendent with Project Management, Safety Coordinator, Estimating and Administrative Assistant as necessary to complete the project as scheduled • Document Reproduction as required for shop drawings • Postage and delivery service of Construction Manager's services only • Project Meetings and preconstruction meetings for construction activities will be held on an as needed basis as determined by the Construction Manager and will be coordinated with the Architect • Project schedules and reports will be submitted as needed or requested by the Owner and will be in the Construction Manager's standard format Submittal Procedures • Architect has 5 working days for review, and must be returned to Construction Manager no later than 7 working days from receipt of submittal as required to maintain progress of the project • Product data, shop drawings and samples will be submitted under the Construction Managers standard format and will be coordinated with A/E Substitutions • Substitutions shall be considered throughout the duration of the project if in the best interest of the Owner Temporary Facilities • Project field office • Project office supplies • Project office equipment as required • Project sign and safety signs • Temporary toilets • Barricades and guard rails • Construction fencing will be utilized on an as needed basis to be determined by Construction Manager 2 'Improvements to The Dell Diamond United Heritage Facility Guaranteed Maximum Price Project Services • Field engineering and layout • Price does not include a final property survey • General cleanup and trash haul off • Recycling and construction waste management programs except for normal jobsite dumpster and trash haul off procedures are excluded from this price • Final cleaning • Construction Photographs are not included Temporary Utilities • Field telephone service • GMP price assumes that temporary water and power will be available on site and that usage costs will be paid for by others Equipment • Project pickup truck • Expendable tools • Small equipment rental Permits, Bonds and Insurance • The cost of the building permit is not included • Mechanical, Electrical & Plumbing trade permits are not included • Price Excludes Plan review fees • Price Excludes Utility connection fees, Impact fees and Assessment fees • General Liability, Auto, Worker Compensation, and Builders Risk Insurance is included • Estimate does include the cost of performance and payment bonds Project Schedule, Weather and Work Hours Schedule • The substantial completion date is April 1, 2004 and is based on receiving a "Notice To Proceed" by no later than September 26, 2003 Weather • Days for inclement weather are not calculated into the schedule and extensions of time to complete the contract would be added to the duration of the project as per the contract agreement Work Hours • Normal working days are Monday through Friday, excluding holidays 3 'Improvements to The Dell Diamond United Heritage Facility Guaranteed Maximum Price Environmental • We have assumed that all environmental investigations and permits will be accomplished and paid for by the Owner • The handling or abatement of hazardous materials is not included in this estimate • Price does not include the cost for rodent and pest control Inspections and Testing Building Inspections • Inspections will be provided as required by local jurisdiction Materials Testing • All costs for laboratory testing of new construction materials will be borne by the Owner except for cost associated with re -testing • Geotechnical assessments and reports are assumed to have been completed and are not included in this estimate Jobsite Equipment • Scaffolding and hoisting for construction access • Equipment for excavation, structural steel and concrete construction • Small tools and equipment as required by trade Contract Modification Procedures • All Change Proposals will be submitted on Construction Managers standard format and as per the contract documents Applications for Payment • Applications for Payment shall be submitted on the AIA G702 / G703 • Price does not include using Architect's itemized Cost Data Report Form 757A and 757B and is excluded Closeout • All closeout documents and procedures will be conveyed to the Owner and will be carried out in accordance with the Construction Managers standard procedures • Prior to substantial completion, Owner and Construction Manager will walk thru the project to identify items to be completed prior to substantial completion • Upon substantial completion of the work, the Owner and Construction Manager shall walk the project and prepare a punch list which will describe all of the items to be performed by the Construction Manager to bring the project to full completion. When the Construction Manager performs these to the Owner's satisfaction, the project shall be deemed to be one hundred percent (100%) completed 4 `Improvements to The Dell Diamond United Heritage Facility Guaranteed Maximum Price Demolition • Demolition of existing concrete work covered under separate agreement • No exceptions taken for demolition by trades • Price does not include the cost to engage professional engineering for surveys prior to demolition activities Site Excavation ■ Site excavation is covered under a separate agreement Temporary Erosion Control • Silt fence and upkeep Utility Services • No utilities are included Landscaping and Irrigation • Allow $5,000 for re -landscaping at Homerun Porch Cast -in -Place Concrete • Intermediate steps at HR Porch are cast -in-place in lieu of pre -cast • All concrete at the Right Field Entry is excluded Pre -cast Concrete Bleachers ■ Price is based on utilizing forms that are already made • Excludes pre -cast intermediate steps (see cast -in-place) ■ Price excludes independent testing laboratory services ■ Material purchased by Owner under separate agreement Masonry • Re: 4214 2.3B Limestone to match existing in lieu of specified • Re: 04220 2.9 Insulation excluded (not shown on drawings) • Re: 04220 3.5A Cell insulation excluded (not shown on drawings) Structural Steel • Material purchased by Owner under separate agreement Miscellaneous Steel • Stainless steel drink rail shall be 16 gauge stainless steel, 72" x 10", attached to supports with 3M VHB double sided tape. Mock up to be provided for approval 5 Improvements to The Dell Diamond United Heritage Facility Guaranteed Maximum Price Rough Carpentry • An allowance of $2,500 is included for misc. rough carpentry • Price excludes any plywood for signage Finish Carpentry & Cabinetry • Casework boxes to be white lined, substrate, with '/4" white hardwood backs • Hinges to 110 degrees fully concealed and self closing Weatherproofing • 07110 Asphalt emulsion to be used in lieu of Tyvek commercial wrap or other poly wrap at suites and walkway columns Roofing and Sheet Metal ■ No exceptions Doors, Frames & Finish Hardware ■ Doors to be field finished to match existing in lieu of pre -finished Glass, Glazing & Storefront • Vista wall series 3000 flush glaze painted "Dark Grey" to match existing • Doors are medium stile on offset pivots to match existing • Rockwood push and pulls to match existing • Glass shall be 1" OA laminated heat strengthened sungard over clear to match existing • Specification section 08920 is excluded and all storefront, glass & glazing will match existing Drywall, Acoustical Ceilings & Door Installation • No exceptions taken. All materials to match existing. Carpet & Base • No exceptions taken. All materials to match existing. 6 "Improvements to The Dell Diamond United Heritage Facility Guaranteed Maximum Price Painting & Finishing • Excludes painting of any signage or ad panels • Level 5 finishes are excluded • The following specifications do not apply to this project and are excluded or revised: • 09265- 1.2.E Skim coat (level 5 finish) • 09265- 1.2.G Decorative texture • 09265- 1.2.H.1 Texturing • 09910- 1.1.C.1.A Pre -finished doors (Wood doors to be field finished to match existing) • 09910- 3.3.0 Paint MEP items exposed to view (Sprinkler piping only to match existing) • 09910- 3.7 Exterior Paint Schedule (This section either does not apply or is covered in another section) • 09910- 3.8 A & B Interior Paint Schedule (Does not apply to this project) ■ 09910- 3.8.C.3, 4 & 5 (Does not apply to this project) • 09910- 3.8.D (Does not apply to this project) • 09910- 3.8.E.3 (Does not apply to this project) • 09970- 1.2.D (Applicators to be qualified in lieu of licensed) ■ 09970- 1.3.D (Applicators to be qualified in lieu of licensed) • 09970- 3.2.D (Deck does not paint. Matches existing) • 09970- 3.4.C.1 Primer shall be clean and dry prior to application of top coat • 09970- 3.4.C.2 (1 year recoat window in lieu of 30 day) • 09970- 3.4.C.3 (Decking does not paint. Matches existing) • 09970- 3.4.C.4 Sherwin Williams Zinc Clad 5 organic zinc rich primer to be used for touch up of field welds. Specialties • Turnstiles are excluded from this project • Fire extinguishers are 10# ABC per fire department Equipment • Icemakers are not shown on plans and are excluded fro this project Signage • All signage is to be by others Seating • No exceptions Re -locate Light Pole • No exceptions 7 'Improvements to The Dell Diamond United Heritage Facility Guaranteed Maximum Price Fire Protection • Excludes any fire protection at the Homerun Porch or Walkway Bridge • Fire sprinklers at suites to be designed to meet City of Round Rock requirements and NFPA #13 standards ■ Fire pump excluded • Price is based on adequate water supply. Flow test by Fire Dept. is required. • CAD drawings to be provided by Architect for shop drawings • Chrome semi -recessed heads in suites Plumbing ■ All underground storm sewer is excluded from this project HVAC • Starters are not found and are not included in this project • Coatings are not found and are not included in this project Electrical ■ Samples of fixtures are excluded. Standard product data submittals are included • Power and hook-up of lighting for signs is by others • The FK fixture (sconce light at exterior of suites) is no longer available. An allowance of $250 per each fixture is included Sound System / PA System • Contract documents only show audio. No video is included Contingency • A $20,000 contingency is included in this pricing and is to be utilized for unforeseen cost to the Construction Manager in accordance with the contract documents 8 • Improvements to The Dell Diamond United Heritage Facility Guaranteed Maximum Price Exclusions The following items are not included in our Cost Estimate: • Impact Fees of any kind • Permits or other fee costs • Utility connection fees of any kind • Geotechnical investigations or reports • Hazardous material assessment, removal or abatement • Conduits or wiring for security systems, data systems or phone systems • RFNideo system • Power or upgrading of existing electrical service • Signage costs • Right Field Entry Entirely • Recycling • Professional engineering fees • Testing • Rodent and pest control • Additional cost's due to local jurisdiction's plan review or plan changes in field • Furnishings, fixtures and equipment not specifically shown in estimate and/or by Exhibit • Reproduction cost's for drawings and specifications required for bid packages 9 •Improvements to The Dell Diamond United Heritage Facility Guaranteed Maximum Price Guaranteed Maximum Price Our Guaranteed Maximum Price for this project is: Base Estimate: $1,877,440.00 The above GMP includes items pre -furnished by Round Rock Baseball as follows: Less Contract with Round Rock Baseball, Inc. for Demolition, Site Excavation and Concrete Work -$155,597 Less Contract between Alamo Steel and Round Rock Baseball, Inc. to purchase Structural Steel -$413,703 Less Contract between Heldenfels Ent. and Round Rock Baseball, Inc. to purchase Pre -cast Concrete -$129,000 Total -$698,300 A breakdown of our Conceptual Cost Estimate is attached 10 t hesco Contracting 9/24/2003 Breakdown of Cost for Dell Diamond Expansion - GMP Estimate H R Porch -GMP Pricing - 9-16-03.xls Home Run Suite Home Run East Total Porch Expansion Walkway Entry General Conditions 56,893 32,351 8,924 13,387 111,555 Demolition 11,274 6,490 2,346 0 20,110 Sitework and Excavation 11,690 2,670 3,600 0 17,960 Chain Link Fence 4,500 0 0 0 4,500 Landscaping (Allowance) 5,000 0 0 0 5,000 Concrete Work 78,701 22,940 15,886 0 117,527 Pre -Cast Concrete Bleachers 129,000 0 0 0 129,000 Masonry 14,650 18,400 41,960 0 75,010 Structural Steel and Rails 243,841 120,893 43,738 5,231 413,703 Steel and Precast Erection 127,500 48,000 37,300 0 212,800 Addendum 1 Steel Additions 12,542 0 0 0 12,542 Miscellaneous Steel 9,640 525 0 0 10,165 Rough Carpentry 0 2,500 0 0 2,500 Finish Carpentry & Cabinets 0 23,275 0 0 23,275 Caulking and Flashing 3,750 2,520 3,010 0 9,280 Roofing 24,600 58,288 0 0 82,888 Hollow Metal 0 9,884 0 0 9,884 Glass & Glazing & Storefronts 0 28,890 0 0 28,890 Drywall 0 50,680 9,253 0 59,933 Carpet, VCT & Base 0 6,699 0 0 6,699 Painting and Finishing 66,560 23,560 10,305 0 100,425 Identification Devices & Graphics 0 0 0 0 0 Fire Extinguishers & Cabinets 0 750 0 0 750 Turnstiles 0 0 0 0 0 Seating 53,223 5,652 0 0 58,875 Relocate Light Tower 29,800 0 0 0 29,800 Stormwater Piping 25,500 3,000 1,400 0 29,900 Fire Protection 0 12,520 0 0 12,520 Plumbing 0 16,295 0 0 16,295 HVAC 0 29,878 0 0 29,878 Electrical 56,504 52,745 4,145 0 113,394 Sound Reinforcing & Video Systems 23,410 6,485 8,535 0 38,430 Subtotal $988,578 $585,890 $190,402 $18,618 $1,783,488 Contingency 0 0 0 0 20,000 Insurance 0 0 0 0 9,879 Bond 0 0 0 0 22,274 Fee 0 0 0 0 41,798 Total GMP $988,578 $585,890 $190,402 $18,618 $1,877,440 The above GMP includes items pre -furnished by Round Rock Baseball as follows: Less Contract with Round Rock Baseball, Inc. for Demolition, Site Excavation and Concrete Work -$155,597 Less Contract between Alamo Steel and Round Rock Baseball, Inc. to purchase Structural Steel -$413,703 Less Contract between Heldenfels Ent. and Round Rock Baseball, Inc. to purchase Pre -cast Concrete -$129,000 Total -$698,300 Rev. No. Sheet Title Cover Add 1 A0.00 A0.01 A0.02 A0.04 Add 1 A0.04 A2.01 A2.10 "Exhibit B" Contract Document List ARCHITECTURAL Dell Diamond Expansion - Permit/Bid Set Sheet Index General Information & Door Details Partition Notes Stair plans, Sections & Details Stair plans, Sections & Details Overall Concourse Level Plan - - ___ _ e __ _ -- - _ --- Add 1 A2.10 Concourse Level Sector 0 - Home Run Porch & Bridge A2.11 Add 1 A2.11 A2.16 Add 1 A2.16 Concourse Level Sector 6 - Right Field Entry A2.20 - -' - - Add 1 A2.20 /2.21 Add 1 A2.21 A3.16 Add 1 A3.16 A3,20 Add 1 A3.20 A3.21 Add 1 A3.21 A4.O1 Add 1 A4.01 M.03 Add 1 A4.03 A4-04 Add 1 A4.04 A5.01 Add 1 A5.01 A6.01 Add 1 A6.01 A6.02 Add 1 A6.02 A6.03 Add 1 A6.03 A7.10 Add 1 A7.10 A7.11 Add 1 A7.11 /7.16 Add 1 A7.16 Concourse Level Sector 6 - Right Field Entry RCP A7.20 Suite Level Sector 0 - HRP & RCP A7.21 Suite Level Sector 1 - Suite RCP STRUCTURAL S1.01 General -Notes 07/17/03 HKS Add 1 S1.01 General Notes 08/08/03 HKS S1.02 07/17/03 HKS Add 1 S1.02 Typical Details 08/08/03 HKS Concourse Level Sector 1 - Bridge & Suites Suite Level Sector 0 - Home Run Porch & Bridge ee- Suite Level Sector 1 - Bridge & Suites Roof Plan Sector 6 Roof Plan Sector 6 Roof Plan Sector 0 - Home Run Porch Roof Plan Sector 1 Suites Roof Plan Sector 1 - Suites Home Run Porch Elevations Suite-&-Bridge-Elevations Suite & Bridge Elevations Right Field Entry Details, Sections & Elevations Building -Sections Building Sections Home Run Porch Details Bridge -Details Bridge Details Suite Plan & Section Details Concourse Level Sector 0 HRP RCP Concourse Level Sector 0 - HRP RCP Concourse Level Sector 1 - Bridge & Suites RCP Issue or Rev. Date By 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 07/17/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 08/08/03 HKS 07/17/03 HKS 07/17/03 HKS Rev. No. Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Sheet S1.03 S1.03 S1.04 S1.04 S2.10 S2.10 S2.11 S2.11 S2.16 S2.16 S2.20 S2.20 S2.21 S2.21 S2.30 S2.30 S2.31 S2.31 S3.01 S3.01 S4.01 S4.01 S11.02 S4.02 S1.03 S4.03 54.04 S4.04 S4.05 "Exhibit B" Contract Document List Con't Title Typical Details Typical Details Typical Detail& Typical Details Foundation Plan Area 0 Foundation Plan - Area 0 Foundation Plan Area 1 Foundation Plan - Area 1 Foundation & Roof Framing Plans - Area 6 Level 2 Framing Plan Area 0 Level 2 Framing Plan - Area 0 Level 2 Framing Plan Area 1 Level 2 Framing Plan - Area 1 Roof Framing Plan Area 0 Home Run Porch Roof Framing Plan - Area 0 - Home Run Porch Roof Plan Ar a 1 Now Suitc& Roof Plan Area 1 - New Suites Sections & Details Sections & Details Sections & Details Sections & Details Sections & Details Sections & Details MECHANICAL M1.01 Notes, Symbols & Legend M2.11 Concourse Level Sector 1 M2.16 Concourse Level Sector 6 M2.21 Suite Level Sector 1 M2.31 Roof Plan Sector 1 M3.00 Mechanical Schedules M4.01 Details M4.02 Details M4.03 Details P1.00 P2.10 P2.10 P2.11 P246 P2.16 P240 P2.20 P2.21 P2.30 P2.31 P2.36 P2.36 PLUMBING & F.P. Symbols & Schedule Concourse Level Sector 0 HRP & Bridge Concourse Level Sector 0 - HRP & Bridge Concourse Level Sector 1 - Bridge & Suites Concourse Level Sector 6 - Round Rock Entry Suite Level Sector 0 - Home Run Porch & Bridge Suite Level Sector 1 - Bridge & Suites Roof Plan Sector 0 - Home Run Porch Roof Plan Sector 1 - Suites Roof Plan Sector 6 - Round Rock Entry Issue or Rev. Date 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 08/08/03 07/17/03 07/17/03 07/17/03 07/17/03 07/17/03 07/17/03 07/17/03 07/17/03 07/17/03 07/17/03 07/17/03 08/08/03 07/17/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 07/17/03 07/17/03 07/17/03 08/08/03 By HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS HKS Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consu lti ag E gr Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engr& Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs "Exhibit B" Contract Document List Con't Rev. No. Sheet Title ELECTRICAL E1.01 Electrical One -Line Diagrams E2.10 Concourse Level Sector 0 E2.11 Concourse Level Sector 1 E2.16 Add 1 E2.16 Concourse Level Sector 6 E2.20 Suite Level Sector 0 E2.21 Suite Level Sector 1 E2.30 Add 1 E2.30 Roof Plan Sector 0 E3.10 Add 1 E3.10 Concourse Level Sector 0 E3.11 Concourse Level Sector 1 Add 1 E3.11 Concourse Level Sector 1 E3.16 Concourse Level Sector 6 Add 1 E3.16 Concourse Level Sector 6 E3.20 Suite Level Sector 0 E3.21 Suite Level Sector 1 E3.31 Roof Plan Sector 1 E1.01 E4.01 Electrical One -Line Diagrams SOUND SYSTEM Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 Add 1 SS0.01 SS2.10 SS2.11 SS2.16 SS2.21 SS4.03 SS7.20 SS7.21 Details Concourse Level Sector 0 — Home Run Porch & Bridge Concourse Level Sector 1 — Bridge & Suites Concourse Level Sector 6 — Round Rock Entry Suite Level Sector 1 — Bridge & Suites Suite & Bridge Elevations Suite Level Sector 0 — HRP RCP Suite Level Sector 1 — Suite RCP Project Manual dated July 17, 2003 Issue or Rev. Date By 07/17/03 07/17/03 07/17/03 07/17/03 08/08/03 07/17/03 07/17/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 08/08/03 07/17/03 07/17/03 07/17/03 07/17/03 08/08/03 08/08/03 08/08/03 08/08/03 08/08/03 08/08/03 08/08/03 08/08/03 08/08/03 Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrc Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs Blum Consulting Engrs BAI Austin BAI Austin BAI Austin BAI Austin BAI Austin BAI Austin BAI Austin BAI Austin