R-03-09-11-10F1 - 9/11/2003J
RESOLUTION NO. R -03-09-11-10F1
WHEREAS, the City of Round Rock desires to retain engineering
services for the 2002-2003 Wastewater Collection System Inspection of
Non -Edwards Aquifer Basins BC07 and LC12, and
WHEREAS, RJN Group, Inc. has submitted an Agreement for
Engineering Services to provide said services, and
WHEREAS, the City Council desires to enter into said agreement
with RJN Group, Inc., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City an Agreement for Engineering Services with RJN
Group, Inc. for the 2002-2003 Wastewater Collection System Inspection
of Non -Edwards Aquifer Basins BC07 and LC12, a copy of said agreement
being attached hereto as Exhibit "A" and incorporated herein for all
purposes.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this llth day of September, 2003
/ 410A
N
WEL , Mayor
City of Round Rock, Texas
LW )/
CHRISTINE R. MARTINEZ, City Secretary/
@PFDesktop\::0DMA/WORLDOX/0:/WDOX/RESOLUTZ/R30911F1.WPD/Sc
'ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY.
CITY OF ROUND ROCK AGREEMENT
FOR ENGINEERING SERVICES WITH
RJN GROUP, INC.
FOR
BASIN LC12 AND BC07: TV TAPE REVIEW
THE STATE OF TEXAS
COUNTY OF WILLIAMSON
THIS AGREEMENT FOR ENGINEERING SERVICES ("Agreement") is made and entered
into on this the day of the month of , 2003, by and between the CITY OF
ROUND ROCK, a Texas home -rule municipal corporation, whose offices are located at 221 East Main
Street, Round Rock, Texas 78664-5299, (hereinafter referred to as "City"), and RJN GROUP, INC.,
whose principal place of business is located at 12160 Abrams Road, Suite 206, Dallas, Texas 75243,
(hereinafter called "Engineer"), and such Agreement is for the purpose of contracting for professional
engineering services.
RECITALS:
WHEREAS, V.T.C.A., Government Code §2254.002(2)(A)(vii) under Subchapter A entitled
"Professional Services Procurement Act" provides for the procurement by municipalities of services of
professional engineers; and
WHEREAS, City and Engineer desire to contract for such professional engineering services; and
WHEREAS, City and Engineer wish to document their agreement concerning the requirements
and respective obligations of the parties;
NOW, THEREFORE, WITNESSETH:
That for and in consideration of the mutual promises contained herein and other good and
valuable considerations, and the covenants and agreements hereinafter contained to be kept and
performed by the respective parties hereto, it is agreed as follows:
CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement and any exhibits attached hereto (which
exhibits are hereby incorporated into and made a part of this Agreement) and all Supplemental
Agreements (as defined herein in Article 13) which are subsequently issued. These form the entire
contract, and all are as fully a part of this Agreement as if attached to this Agreement or repeated herein.
Engineering Sery Agreement -4-2003
File name: RJN-LC12 and BC07-TV Tape Review (00052688).doc
1
ARTICLE 1
SCOPE OF SERVICES TO BE PERFORMED BY CITY
City shall perform or provide services as identified in Exhibit A entitled "Services to be
Performed by City."
ARTICLE 2
SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER
Engineer shall perform engineering services as identified in Exhibit B entitled "Services to be
Performed by Engineer."
Engineer shall develop a mutually acceptable schedule of work as identified in Exhibit C entitled
"Work Schedule." Such Work Schedule shall contain a complete schedule so that the Engineer's Scope
of Services under this Agreement may be accomplished within the specified time and at the specified
cost. The Work Schedule shall provide specific work sequences and definite review times by City and
Engineer of all work performed. Should the review times take longer than shown on the Work Schedule,
through no fault of Engineer, additional time may be authorized by City through a written Supplemental
Agreement only if same is requested by a timely written request from Engineer which is approved by
City.
ARTICLE 3
CONTRACT TERM
(1) Term. This Agreement shall be from the date hereof and shall terminate at the close of
business on the 3 lsday of the month of May, 2004, unless extended by written Supplemental
Agreement executed by Engineer and City prior to the date of termination, or as otherwise terminated as
provided in Article 20 entitled "Termination." Any work performed or costs incurred after the date of
termination shall not be eligible for reimbursement.
Engineer shall notify City in writing as soon as possible if he/she/it determines, or reasonably
anticipates, that the work under this Agreement will not be completed before the termination date. In
that event City may, at its sole discretion, extend the contract term by timely written Supplemental
Agreement. Engineer shall allow adequate time for review and approval of his/her/its request for time
extension by City prior to expiration of this Agreement.
(2) Work Schedule. Engineer acknowledges that the Work Schedule is of critical importance,
and agrees to undertake all necessary efforts to expedite the performance of services required herein so
that construction of the project will be commenced and completed as scheduled. In this regard, Engineer
shall proceed with sufficient qualified personnel and consultants necessary to fully and timely
accomplish all services required under this Agreement in the highest professional manner.
(3) Notice to Proceed. After execution of this Agreement, Engineer shall not proceed with work
delineated in Article 2 entitled "Scope of Services to be Performed by Engineer" and in Exhibit B
Rev. 4/1/03
2
entitled "Services to be Performed by Engineer" until authorized in writing by City to proceed as
provided in Article 7 entitled "Notice to Proceed."
ARTICLE 4
COMPENSATION
City shall pay and Engineer agrees to accept the amount shown below as full compensation for
all engineering services performed and to be performed under this Agreement.
The amount payable under this Agreement, without modification of the Agreement as provided
herein, is the sum of thirty four thousand two hundred and ninety nine dollars ($ 34,299.00) as shown in
Exhibit D entitled "Fee Schedule." The lump sum amount payable may be revised only by written
Supplemental Agreement in the event of a change in scope, additional complexity from that originally
anticipated, or change in character of work as authorized by City.
Engineer shall prepare and submit to City monthly progress reports in sufficient detail to support
the progress of the work and to support invoices requesting monthly payment. Any preferred format of
City for such monthly progress reports shall be identified in Exhibit B entitled "Services to be
Performed by Engineer." Satisfactory progress of work shall be maintained as an absolute condition of
payment.
The fee herein referenced may be adjusted for additional work requested and performed only if
approved by written Supplemental Agreement.
ARTICLE 5
METHOD OF PAYMENT
Payments to Engineer for services rendered shall be made while work is in progress. Engineer
shall prepare and submit to City, not more frequently than once per month, a progress report as
referenced in Article 4 above. Such progress report shall state the percentage of completion of work
accomplished during that billing period and to date. Simultaneous with submission of such progress
report, Engineer shall prepare and submit one (1) original and one (1) copy of a certified invoice in a
form acceptable to City. This submittal shall also include a progress assessment report in a form
acceptable to City.
Progress payments shall be made in proportion to the percentage of completion of work tasks
identified in Exhibit D entitled "Fee Schedule." Progress payments shall be made by City based upon
work actually provided and performed. Upon timely receipt and approval of each statement, City shall
make a good faith effort to pay the amount which, notwithstanding anything herein to the contrary, is
due and payable within thirty (30) days. City reserves the right to withhold payment pending verification
of satisfactory work performed. Engineer has the responsibility to submit proof to City, adequate and
sufficient in its determination, that tasks were completed.
Rev. 4/1/03
3
The certified statements shall show the total amount earned to the date of submission and shall
show the amount due and payable as of the date of the current statement. Final payment does not relieve
Engineer of the responsibility of correcting any errors and/or omissions resulting from his/her/its
negligence.
ARTICLE 6
PROMPT PAYMENT POLICY
In accordance with Chapter 2251, V.T.C.A., Texas Government Code, payment to Engineer
will be made within thirty (30) days of the day on which City receives the supplies, materials,
equipment, or within thirty (30) days of the day on which the performance of services was complete, or
within thirty (30) days of the day on which City receives a correct invoice for the supplies, materials,
equipment, or services, whichever is later. Engineer may charge a late fee (fee shall not be greater than
that which is permitted by Texas law) for payments not made in accordance with this prompt payment
policy; however, this policy does not apply to payments made by City in the event:
A. There is a bona fide dispute between City and Engineer concerning the supplies,
materials, or equipment delivered or the services performed that causes the payment to be
late; or
B. The terms of a federal contract, grant, regulation, or statute prevent City from making a
timely payment with federal funds; or
C. There is a bona fide dispute between Engineer and a subcontractor or between a
subcontractor and its supplier concerning supplies, materials, or equipment delivered or
the services performed which causes the payment to be late; or
D. The invoice is not mailed to City in strict accordance with instructions, if any, on the
purchase order, or this Agreement or other such contractual agreement.
City shall document to Engineer the issues related to disputed invoices within ten (10) calendar
days of receipt of such invoice. Any non -disputed invoices shall be considered correct and payable per
the terms of Chapter 2251, V.T.C.A., Texas Government Code.
ARTICLE 7
NOTICE TO PROCEED
City shall issue a written authorization to proceed with work identified in the Scope of Services.
City shall not be responsible for actions by Engineer or any costs incurred by Engineer relating to
additional work not included in Exhibit B entitled "Services to be Performed by Engineer."
Rev. 4/1/03
4
ARTICLE 8
PROJECT TEAM
City's Designated Representative for purposes of this Agreement is as follows:
Mr. Don Rundell
Chief Utility Engineer
2008 Enterprise Drive
Round Rock, Texas 78664
Telephone Number: (512) 218-5554
Facsimile Number: (512) 218-5563
Email Address: drundell@round-rock.tx.us
City's Designated Representative shall be authorized to act on City's behalf with respect to this
project. City or City's Designated Representative shall render decisions in a timely manner pertaining
to documents submitted by Engineer in order to avoid unreasonable delay in the orderly and sequential
progress of Engineer's services.
Engineer's Designated Representative for purposes of this Agreement is as follows:
Hugh M. Kelso
Regional Vice President
12160 Abrams Road, Suit 206
Dallas, Texas 75243
Telephone Number: (972) 437-4300
Facsimile Number: (972) 437-2707
E-mail Address: hkelso@rjn.com
ARTICLE 9
PROGRESS EVALUATION
Engineer shall, from time to time during the progress of the work, confer with City at City's
election. Engineer shall prepare and present such information as may be pertinent and necessary, or as
may be requested by City, in order for City to evaluate features of the work. At the request of City or
Engineer, conferences shall be provided at Engineer's office, the offices of City, or at other locations
designated by City. When requested by City, such conferences shall also include evaluation of
Engineer's services and work.
Should City determine that the progress in production of work does not satisfy the Work
Schedule, then City shall review the Work Schedule with Engineer to determine corrective action
required.
Engineer shall promptly advise City in writing of events which have or may have a significant
impact upon the progress of the work, including but not limited to the following:
Rev. 4/1/03
5
(1) Problems, delays, adverse conditions which may materially affect the ability to attain
program objectives, prevent the meeting of time schedules and goals, or preclude the
attainment of project work units by established time periods; and such disclosure shall be
accompanied by statement of actions taken or contemplated, and City assistance needed to
resolve the situation, if any; and
(2) Favorable developments or events which enable meeting the work schedule goals sooner
than anticipated.
ARTICLE 10
SUSPENSION
Should City desire to suspend the work, but not to terminate this Agreement, then such
suspension may be effected by City giving Engineer thirty (30) calendar days' verbal notification
followed by written confirmation to that effect. Such thirty -day notice may be waived in writing by
agreement and signature of both parties. The work may be reinstated and resumed in full force and
effect within sixty (60) days of receipt of written notice from City to resume the work. Such sixty-day
notice may be waived in writing by agreement and signature of both parties.
If City suspends the work, the contract period as determined in Article 3 is not affected and this
Agreement will terminate on the date specified unless this Agreement is amended indicating otherwise.
City assumes no liability for work performed or costs incurred prior to the date authorized by
City for Engineer to begin work, and/or during periods when work is suspended, and/or subsequent to
the contract completion date.
ARTICLE 11
ADDITIONAL WORK
If Engineer forms a reasonable opinion that any work he/she/it has been directed to perform is
beyond the scope of this Agreement and as such constitutes extra work, he/she/it shall promptly notify
City in writing. In the event City finds that such work does constitute extra work and exceeds the
maximum amount payable, City shall so advise Engineer and a written Supplemental Agreement will
be executed between the parties as provided in Article 13 entitled "Supplemental Agreements."
Engineer shall not perform any proposed additional work nor incur any additional costs prior to the
execution, by both parties, of a written Supplemental Agreement. City shall not be responsible for
actions by Engineer nor for any costs incurred by Engineer relating to additional work not directly
associated with the performance of the work authorized in this Agreement or any amendments thereto.
ARTICLE 12
CHANGES IN WORK
If City deems it necessary to request changes to previously satisfactorily completed work or
parts thereof which involve changes to the original scope of services or character of work under this
Agreement, then Engineer shall make such revisions as requested and as directed by City. Such
Rev. 4/1/03
6
revisions shall be considered as additional work and paid for as specified under Article 11 entitled
"Additional Work."
Engineer shall make revisions to work authorized hereunder as are necessary to correct errors
appearing therein, when required to do so by City. No additional compensation shall be due for such
work.
ARTICLE 13
SUPPLEMENTAL AGREEMENTS
The terms of this Agreement may be modified by written Supplemental Agreement if City
determines that there has been a significant change in (1) the scope, complexity or character of the
service to be performed, or (2) the duration of the work. Any such Supplemental Agreement must be
duly authorized by City Council Resolution. Where such City Council authorization is required,
Engineer shall not proceed until the appropriate Resolution has been adopted. Additional
compensation, if appropriate, shall be identified as provided in Article 4 entitled "Compensation."
Both parties must execute any written Supplemental Agreement within the contract period
specified in Article 3 entitled "Contract Term."
It is understood and agreed by and between both parties that Engineer shall make no claim for
extra work done or materials furnished until City grants full execution of the written Supplemental
Agreement and authorization to proceed. City reserves the right to withhold payment pending
verification of satisfactory work performed.
ARTICLE 14
OWNERSHIP OF DOCUMENTS
All data, basic sketches, charts, calculations, plans, specifications, and other documents created
or collected under the terms of this Agreement are the exclusive property of City and shall be furnished
to City upon request. All documents prepared by Engineer and all documents furnished to Engineer by
City shall be delivered to City upon completion or termination of this Agreement. Engineer, at
his/her/its own expense, may retain copies of such documents or any other data which he/she/it has
furnished City under this Agreement. Any release of information shall be in conformance with
requirements of the Texas Open Records Act.
ARTICLE 15
PERSONNEL, EQUIPMENT AND MATERIAL
Engineer shall furnish and maintain, at his/her/its own expense, quarters for the performance of
all services, and adequate and sufficient personnel and equipment to perform the services as required.
All employees of Engineer shall have such knowledge and experience as will enable them to perform
the duties assigned to them. Any employee of Engineer who, in the opinion of City, is incompetent or
whose conduct becomes detrimental to the work shall immediately be removed from association with
Rev. 4/1/03
7
the project when so instructed by City. Engineer certifies that he/she/it presently has adequate qualified
personnel in his/her/its employment for performance of the services required under this Agreement, or
will obtain such personnel from sources other than City. Engineer may not change the Project Manager
without prior written consent of City.
ARTICLE 16
SUBCONTRACTING
Engineer shall not assign, subcontract or transfer any portion of the work under this Agreement
without prior written approval from City. All subcontracts shall include the provisions required in this
Agreement and shall be approved as to form, in writing, by City prior to work being performed under
the subcontract. No subcontract shall relieve Engineer of any responsibilities under this Agreement.
ARTICLE 17
EVALUATION OF WORK
City, or any authorized representatives of it, shall have the right at all reasonable times to review
or otherwise evaluate the work performed or being performed hereunder and the premises on which it is
being performed. If any review or evaluation is made on the premises of Engineer or a subcontractor,
then Engineer shall provide and require its subcontractors to provide all reasonable facilities and
assistance for the safety and convenience of City or other representatives in the performance of their
duties.
ARTICLE 18
SUBMISSION OF REPORTS
All applicable study reports shall be submitted in preliminary form for approval by City before
any final report is issued. City's comments on Engineer's preliminary reports shall be addressed in any
final report.
ARTICLE 19
VIOLATION OF CONTRACT TERMS/BREACH OF CONTRACT
Violation of contract terms or breach of contract by Engineer shall be grounds for termination of
this Agreement, and any increased costs arising from Engineer's default, breach of contract, or violation
of contract terms shall be paid by Engineer.
ARTICLE 20
TERMINATION
This Agreement may be terminated before the stated termination date by any of the following
conditions.
(1) By mutual agreement and consent, in writing, of both parties.
Rev. 4/1/03
8
(2) By City, by notice in writing to Engineer, as a consequence of failure by Engineer to
perform the services set forth herein in a satisfactory manner.
(3) By either party, upon the failure of the other party to fulfill its obligations as set forth
herein.
(4) By City, for reasons of its own and not subject to the mutual consent of Engineer, upon
not less than thirty (30) days' written notice to Engineer.
(5) By satisfactory completion of all services and obligations described herein.
Should City terminate this Agreement as herein provided, no fees other than fees due and
payable at the time of termination shall thereafter be paid to Engineer. In determining the value of the
work performed by Engineer prior to termination, City shall be the sole judge. Compensation for work
at termination will be based on a percentage of the work completed at that time. Should City terminate
this Agreement under Subsection (4) immediately above, then the amount charged during the thirty -day
notice period shall not exceed the amount charged during the preceding thirty (30) days.
If Engineer defaults in the performance of this Agreement or if City terminates this Agreement
for fault on the part of Engineer, then City shall give consideration to the actual costs incurred by
Engineer in performing the work to the date of default, the amount of work required which was
satisfactorily completed to date of default, the value of the work which is usable to City, the cost to City
of employing another firm to complete the work required and the time required to do so, and other
factors which affect the value to City of the work performed at the time of default.
The termination of this Agreement and payment of an amount in settlement as prescribed above
shall extinguish all rights, duties, and obligations of City and Engineer under this Agreement, except
the obligations set forth herein in Article 21 entitled "Compliance with Laws." If the termination of this
Agreement is due to the failure of Engineer to fulfill his/her/its contractual obligations, then City may
take over the project and prosecute the work to completion. In such case, Engineer shall be liable to
City for any additional costs incurred by City.
Engineer shall be responsible for the settlement of all contractual and administrative issues
arising out of any procurements made by Engineer in support of the scope of services under this
Agreement.
ARTICLE 21
COMPLIANCE WITH LAWS
(1) Compliance. Engineer shall comply with all applicable federal, state and local laws,
statutes, codes, ordinances, rules and regulations, and the orders and decrees of any court, or
administrative bodies or tribunals in any manner affecting the performance of this Agreement,
including without limitation, minimum/maximum salary and wage statutes and regulations, and
licensing laws and regulations. Engineer shall furnish City with satisfactory proof of his/her/its
compliance.
Rev. 4/1/03
9
Engineer shall further obtain all permits and licenses required in the performance of the
professional services contracted for herein.
(2) Taxes. Engineer will pay all taxes, if any, required by law arising by virtue of the services
performed hereunder. City is qualified for exemption pursuant to the provisions of Section 151.309 of
the Texas Limited Sales, Excise, and Use Tax Act.
ARTICLE 22
INDEMNIFICATION
Engineer shall save and hold harmless City and its officers and employees from all claims and
liabilities due to activities of his/her/itself and his/her/its agents or employees, performed under this
Agreement, which are caused by or which result from error, omission, or negligent act of Engineer or of
any person employed by Engineer or under Engineer's direction or control.
Engineer shall also save and hold City harmless from any and all expenses, including but not
limited to attorneys fees which may be incurred by City in litigation or otherwise defending claims or
liabilities which may be imposed on City as a result of such activities by Engineer, its agents, or
employees.
ARTICLE 23
ENGINEER'S RESPONSIBILITIES
Engineer shall be responsible for the accuracy of his/her/its work and shall promptly make
necessary revisions or corrections resulting from errors, omissions, or negligent acts, and same shall be
done without compensation. City shall determine Engineer's responsibilities for all questions arising
from design errors and/or omissions. Engineer shall not be relieved of responsibility for subsequent
correction of any such errors or omissions or for clarification of any ambiguities until after the
construction phase of the project has been completed.
ARTICLE 24
ENGINEER'S SEAL
The responsible engineer shall sign, seal and date all appropriate engineering submissions to
City in accordance with the Texas Engineering Practice Act and the rules of the State Board of
Registration for Professional Engineers.
ARTICLE 25
NON -COLLUSION, FINANCIAL INTEREST PROHIBITED
(1) Non -collusion. Engineer warrants that he/she/it has not employed or retained any company
or persons, other than a bona fide employee working solely for Engineer, to solicit or secure this
Agreement, and that he/she/it has not paid or agreed to pay any company or engineer any fee,
commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting
Rev. 4/1/03
10
from the award or making of this Agreement. For breach or violation of this warranty, City reserves and
shall have the right to annul this Agreement without liability or, in its discretion and at its sole election,
to deduct from the contract price or compensation, or to otherwise recover, the full amount of such fee,
commission, percentage, brokerage fee, gift or contingent fee.
(2) Financial Interest Prohibited. Engineer covenants and represents that Engineer,
his/her/its officers, employees, agents, consultants and subcontractors will have no financial interest,
direct or indirect, in the purchase or sale of any product, materials or equipment that will be
recommended or required for the construction of the project.
ARTICLE 26
INSURANCE
(1) Insurance. Engineer, at Engineer's sole cost, shall purchase and maintain during the entire
term while this Agreement is in effect professional liability insurance coverage in the minimum amount
of One Million Dollars from a company authorized to do insurance business in Texas and otherwise
acceptable to City.
(2) Subconsultant Insurance. Without limiting any of the other obligations or liabilities of
Engineer, Engineer shall require each subconsultant performing work under this Agreement to maintain
during the term of this Agreement, at the subconsultant's own expense, the same stipulated minimum
insurance required in Article 26, Section (1) above, including the required provisions and additional
policy conditions as shown below in Article 26, Section (3).
Engineer shall obtain and monitor the certificates of insurance from each subconsultant in order
to assure compliance with the insurance requirements. Engineer must retain the certificates of insurance
for the duration of this Agreement, and shall have the responsibility of enforcing these insurance
requirements among its subconsultants. City shall be entitled, upon request and without expense, to
receive copies of these certificates of insurance.
(3) Insurance Policy Endorsements. Each insurance policy shall include the following
conditions by endorsement to the policy:
1. Each policy shall require that thirty (30) days prior to the expiration, cancellation, non-
renewal or any change in the limit or scope of coverage, a notice thereof shall be given to
City by certified mail to:
City Manager, City of Round Rock
221 East Main Street
Round Rock, Texas 78664
Engineer shall also notify City, within 24 hours of receipt, of any notices of expiration,
cancellation, non -renewal, or material change in coverage it receives from its insurer.
2. Companies issuing the insurance policies shall have no recourse against City for payment
of any premiums or assessments for any deductibles which are the sole responsibility of
and at the sole risk of Engineer.
Rev. 4/1/03
11
3. The term "City" or "City of Round Rock" shall include all authorities, boards,
commissions, departments, and officers of City and the individual members and
employees thereof in their official capacities, and/or while acting on behalf of the City of
Round Rock.
4. The policy clause "Other Insurance" shall not apply to any insurance coverage currently
held by City, to any such future coverage, or to City's Self -Insured Retentions of
whatever nature.
(4) Cost of Insurance. The cost of all insurance required herein to be secured and maintained by
Engineer shall be borne solely by Engineer, with certificates of insurance evidencing such minimum
coverage in force to be filed with City. Such Certificates of Insurance are evidenced as Exhibit F herein
entitled "Certificates of Insurance."
ARTICLE 27
COPYRIGHTS
City shall have the royalty -free, nonexclusive and irrevocable right to reproduce, publish or
otherwise use, and to authorize others to use, any reports developed by Engineer for governmental
purposes.
ARTICLE 28
SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon and inure to the benefit of the parties hereto, their
successors, lawful assigns, and legal representatives. Engineer may not assign, sublet or transfer any
interest in this Agreement, in whole or in part, by operation of law or otherwise, without obtaining the
prior written consent of City.
ARTICLE 29
SEVERABILITY
In the event any one or more of the provisions contained in this Agreement shall for any reason
be held to be invalid, illegal or unenforceable in any respect, then such invalidity, illegality or
unenforceability shall not affect any other provision thereof and this Agreement shall be construed as if
such invalid, illegal or unenforceable provision had never been contained herein.
ARTICLE 30
PRIOR AGREEMENTS SUPERSEDED
This Agreement constitutes the sole agreement of the parties hereto, and supersedes any prior
understandings or written or oral contracts between the parties respecting the subject matter defined
herein. This Agreement may only be amended or supplemented by mutual agreement of the parties
hereto in writing.
Rev. 4/1/03
12
ARTICLE 31
ENGINEER'S ACCOUNTING RECORDS
Records pertaining to the project, and records of accounts between City and Engineer, shall be
kept on a generally recognized accounting basis and shall be available to City or its authorized
representatives at mutually convenient times. The City reserves the right to review all records it deems
relevant which are related to this Agreement.
ARTICLE 32
NOTICES
All notices to either party by the other required under this Agreement shall be personally
delivered or mailed to such party at the following respective addresses:
City:
City of Round Rock
Attention: City Manager
221 East Main Street
Round Rock, TX 78664
and to:
Stephan L. Sheets
City Attorney
309 East Main Street
Round Rock, TX 78664
Engineer:
Hugh M. Kelso
RJN Group, Inc.
12160 Abrams Road, Suite 206
Dallas, TX 75243
ARTICLE 33
GENERAL PROVISIONS
(1) Time is of the Essence. Engineer understands and agrees that time is of the essence and that
any failure of Engineer to complete the services for each phase of this Agreement within the agreed
Work Schedule may constitute a material breach of this Agreement. Engineer shall be fully responsible
for his/her/its delays or for failures to use his/her/its best efforts in accordance with the terms of this
Agreement. Where damage is caused to City due to Engineer's failure to perform in these
circumstances, City may withhold, to the extent of such damage, Engineer's payments hereunder
without waiver of any of City's additional legal rights or remedies.
Rev. 4/1/03
13
(2) Force Majeure. Neither City nor Engineer shall be deemed in violation of this Agreement
if prevented from performing any of their obligations hereunder by reasons for which they are not
responsible or circumstances beyond their control. However, notice of such impediment or delay in
performance must be timely given, and all reasonable efforts undertaken to mitigate its effects.
(3) Enforcement and Venue. This Agreement shall be enforceable in Round Rock,
Williamson County, Texas, and if legal action is necessary by either party with respect to the
enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in
Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the
laws and court decisions of the State of Texas.
ARTICLE 34
SIGNATORY WARRANTY
The undersigned signatory for Engineer hereby represents and warrants that the signatory is an
officer of the organization for which he/she has executed this Agreement and that he/she has full and
complete authority to enter into this Agreement on behalf of the firm. The above -stated representations
and warranties are made for the purpose of inducing City to enter into this Agreement.
IN WITNESS WHEREOF, the City of Round Rock has caused this Agreement to be signed in
its corporate name by its Mayor, duly authorized to execute the same on its behalf by Resolution No.
, approved by the City Council on the day of the month of
, 2003, and Engineer, RJN GROUP, INC., signing by and through his/her/its
duly authorized representative(s), thereby binding the parties hereto, their successors, assigns and
representatives for the faithful and full performance of the terms and provisions hereof.
CITY OF ROUND ROCK, TEXAS:
By:
Nyle Maxwell, Mayor
ATTEST:
By:
Christine Martinez, City Secretary
RJN GROUP, INC.:
By:1i4L Ai
444 -
Hugh M. Kelso, its Regional Vice President
14
Rev. 4/1/03
LIST OF EXHIBITS ATTACHED
(1) Exhibit A "Services to be Performed by City"
(2) Exhibit B "Services to be Performed by Engineer"
(3) Exhibit C "Work Schedule"
(4) Exhibit D "Fee Schedule"
(5) Exhibit E "Work Authorizations"
(6) Exhibit F "Certificates of Insurance"
Rev. 4/1/03
15
Exhibit A
SERVICES TO BE PROVIDED BY THE CITY OF ROUND ROCK
City of Round Rock
Basin LC12 and BC07: TV Tape Review
1. Designate a person to act as the Owner's representative with respect to services to be
rendered under this contract. Such person shall have complete authority to transmit
instructions, receive information, and interpret and define Owner/s policies and decisions.
2. Provide all criteria and full information as to the Owner's requirements for the project,
including design objectives and constraints, space, capacity and performance
requirements, and any budgetary limitations; and furnish copies of all, which Owner will
require to be included in the project.
3. Place at the Engineer's disposal all available information including previous reports and
any other data relative to the project.
4. Arrange for access to and make provisions for Engineer and their Subconsultants to enter
upon public and private property as required for Engineer to perform the services under
this contract.
5. Examine all studies, reports, sketches, drawings specifications, proposals and other
documents presented by the Engineer, and render in writing decisions pertaining thereto
within a reasonable time so as not to delay the services of the Engineer.
6. Furnish approvals and permits for all governmental authorities having jurisdiction over
the Project and such approvals and consent from others as may be necessary for
completion of the project. Pay all fees associated with approvals and permits.
7. Give prompt notice to the Engineer whenever Owner observes or otherwise becomes
aware of any development that affects the scope or timing of Engineer's services.
8. Provide water to the Engineer and Engineer's Subcontractors at no cost, for use during
the project.
A(1)
Exhibit B — Services to be Performed by Engineer
Basin LC12 and BC07: TV Tape Review and Recommendations
I. Project Administration and Management:
A. Project Administration:
Meet with CITY staff on a periodic basis, to update previous work, to coordinate
upcoming work, and to receive any input from staff. Meetings will be held at
significant project milestones with written documentation of the meeting provided. A
total of two (2) meetings are anticipated.
Perform general consultation with appointed CITY representative on an as -needed
basis.
Perform ENGINEER's internal project control procedures on a monthly basis including
schedule and budget control, quality control review, and monthly progress reports.
B. Data Management:
1. All forms used will be scanned and the scanned information will be verified
through quality control measures.
2. Provide all information collected in electronic format (ACCESS Database
formatted for ArcView) and hard copy format. Quality control will be performed
on all data.
II. Analysis and Report:
This part of the project includes performing an engineering analysis of TV Inspection data
and developing recommendations and associated costs for collection system repairs.
A. Cleaning and Internal Television (TV) Inspection Tape Review:
1. Review CCTV Inspection tapes provided by the CITY for TV inspection
performed in Basins BC07 and LC12. Input the TV Inspection data into CASS for
quantification of defects. (85,000 linear feet is anticipated.)
B. Data Analysis:
1. Perform analysis for a rehabilitation plan based on data collected during TV
Inspection. The rehabilitation plan will include a list of defects, preliminary
repair method, and estimated rehabilitation cost. Final engineering design is not
included.
8r7/2003-2:07 PM
B(1)
2. Prepare and submit three (3) copies of a brief draft report, which includes results
of the tape review, cost estimates, and recommended plan to repair sewer lines.
The draft report will be presented and discussed with CITY staff. After
comments are received, a final report will be prepared and submitted to the
CITY. ENGINEER will provide five (5) copies of the final report.
III. Project Deliverables:
The ENGINEER shall compile all findings, reports and field cataloging into a hard copy
form and computer form. The ENGINEER shall deliver to the CITY, as outlined in the
Scope of Work, all information pertaining to the analysis of the project. Computer data
shall be formatted to be compatible with MS Windows software products coordinated with
the CITY prior to delivery.
All documentation and reports shall be delivered as outlined above and herein to be
accessed with MS Windows, Word, Excel, and Access (Specific versions will be
coordinated with CITY prior to delivery
8/7/2003-2:07 PM
B(2)
EXHIBIT C
SCHEDULE
City of Round Rock, Texas
TV Tape Review & Recommendations
(Basins BC07 and LC 12)
Task
Project Administration/Meetings
Data Management
TV Tape Analysis
Rehab Analysis
Report (Draft)
Final Report Submittal
Dates
8/7/2003 C (1)
October 15, 2003 to March 30, 2004
October 30, 2003 to March 30, 2004
November 1, 2003 to January 31, 2004
January 31, 2004 to March 15, 2004
March 15, 2004 to March 30, 2004
April 30, 2004
Exhibit D - Fee Schedule
Compensation to the ENGINEER for "Basic Engineering Services" shall be made as
follows:
Compensation for Basic Services provided under Exhibit B: "Services to be Performed
by Engineer" shall be in accordance with the methods in this attachment and the specific
amounts as set forth herein.
Compensation for the Basic Engineering Services shall be on the basis of a combination
of unit costs and lump sum costs.
A. Budgetary Amount
A budgetary amount for the Basic Services set forth in Exhibit B: "Services to be
Performed by Engineer" is hereby estimated below. It is also understood that the cost
budgets are based upon ENGINEER's best estimate of work and level of effort required
for the proposed scope of services. As the project progresses, it is possible that the level
of effort and/or scope may differ up or down from that assumed. If there are no scope
changes, the ENGINEER shall receive the full amount shown below. If at any time
during the project it appears that the cost may be exceeded, the ENGINEER will notify
the CITY as soon as possible in writing.
B. Cost Break Down
TASK DESCRIPTION UNIT
UNIT ESTIMATED TOTAL
COST QUANTITIES COST
Mobilization and Project Administration
Data Management Program
TV Inspection Tape Review
Rehabilitation Analysis
Draft/Final Reports
TOTAL
8/7/2003-2:06 PM
LS
LS
LF
LS
LS
D(1)
($)
2,730
1,309
0.263
3,695
4,210
($)
1 2,730
1 1,309
85,000 22,355
1 3,695
1 4,210
34,299
HUIa—��—�1�t 13 kI : 57
to CPC 1 fl-M:A I t: OF LIABILITY INSURANCE
It
PROFESSIONAL SERVICES
PRODUCER
Mack and Parker, Inc.
55 Fast Jackson Boulevard
Chicago, IL 60604
BIWuktD
RJN Group, Inc.
200 West Front Street
Wheaton, IL 60187
Date: August 21, 2003
COMPANIES AFFOR.)ING COVERAGE
A4 Greenwich Insurance CanpanY
C.
D
'TT3IS
IS TO CERTIFY THAT the Insured named above is '
the business o insured by the Companies listed above with re
operations hereinafter described, for the types of ins Spit t
the standard policies used by the companies, and farther c'bed.. Exceptions �' ce with thel policies
areious a
below. to the policies note
CO TYPE of INSURANCE
1<.T&
POLICY
NUMBER
EPnCTIVE
DATE
pltoFEssIoNAr. ra aat[r'n PEQ000009841-02 8/01/03
)ESCRIPT ION OP SPECIAL ITEMS/FXCEPT1oNS Project :
EXPIRATION
DATE
LIMITS
8/01/04 • $1,000,000 Each Claim
$2,000,000 Aggregate
$ 50 000 Retention
Basin LC12 and BC07
Mould any of the above described policies be cancelled ax
40) days written notice to the d beforo theon date tberwi; the issuing company ,a111 thirt
c�acs holder named below.
EaTIHCATE HOLDEN:
City of Round Rook
221 E. Main Street
Round Rook, Texas 78664
atm: Cluistine MerTinez, City Se reuly
d 2/1 CUM Profusignai rj bnity cerwscaa.00c
SIGNATURE QF AUTHORIZED RE?RESENTATXV
Title: Service Associate
TOTAL P.02
08/25/2003 MON 12:31 ITX/RX NO 5334] 0002
•
_••`•••T •"'"'
RJNGROUP
INSURANCE
DATEIM0YDD/TYYT)
08107/03
ACORDTM CERTIFICATE OF LIABILITY
OF INSURANCE LISTED BELOW HAW BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN 18 SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONPnTON8 OF SUCH
AGGREGATE LIMITS SHOWN MAY HAW BEEN REDUCED BY PAID CLAIMS,
PRODUCER
Mack and Parker, Inc.
55 E. Jackson Blvd.
Chicago, II. 60604
(Barbara Fritz 312-279-4618)
THIS CERTIFICATE is 1sSuED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND,
ALTER THE COVERAGE AFFORDED BY THE POLICIES
EXTEND OR
BELOW.
INSURERS AFFORDING COVERAGE
NAIC 9
INauRED
R J N Group, Inc.
200 W. Front Street
Wheaton.II. 601MUMa
Attn: Genore
INSURFRA: Transcontinental Insurance Company
20486
INSURER B: Valley Forge
OENIYLILLtABILITY
MUMWheaton, Continental Casual y Company
20443
INBum% D: Transportation insurance Co.
20494
INSURER E: Greenwich Insurance Company
22327
COVERAGES
X
City of Round Rock
Attn: Michael Thane
221 East Main Street
Round Rock, TX 78864
ACORD 23 (2001108) 1 of 2 #S88624/M88244
BHOULp ANY or THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE 188WNG INSURER WILL ENDEAVOR TO MAIL . DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED To THE LEFT, Bur FNLURETo Do Bo SHALL
IMPOSE NO OBLIGATION OR WBILITY OF ANY XING UPON THE INSURER, ITS ASENYII ort
REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
BAF
O ACORD CORPORATION 1988
08/25/2003 MON 12:31 [TX/RX NO 5334] 0 003
THE
ANY
MAY
POLICIES.
NURLTR
POLICIES
REQUIREMENT,
PERTAIN,
APDL
OF INSURANCE LISTED BELOW HAW BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN 18 SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONPnTON8 OF SUCH
AGGREGATE LIMITS SHOWN MAY HAW BEEN REDUCED BY PAID CLAIMS,
LJELINIiRq
A
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE
DATE eSN�DD1YYl
POLICY
�
LINTS
OENIYLILLtABILITY
TCP1077883675
08/01/03
DATE
08/01/04
EACHOCCURRENCE
$1.000.000
S100000
X
[ oMNERCIAL GENERAL LIABILITYREZEJTWagarar4
@cal
I CLAIMS MADE X OCCUR
MED EXP (My one person)
310,000
PERSONAL & ADV INJURY
31,000,000
52.000.000
$1000,000
'
—10EML AGGREGATE UNIT APPPLEES PER
GENERAL AGGREGATE
PDtoDUCTB - COMP/OP AAoo
POLYI lJyrei IAC ILOC
B
C
AUTOMOBILE
IJABILITY
"mum)
ALL OWNED AUTOS
AUTOS
HIRED AUTOS
NON -O 4Eb gm=
BUA1077863644
BUA1077863658
08/01/03
08/01/03
08/01/04
08/01/04
SINGLE LSAT
(Ea �IsuNIC W
$1.000,000
X
SOCIII.YSCHEDULED RY
(P(' person)
$
X
X
INJU
BODILY a m
Ter
s•
PROPER/1f DAMAG
(Par @add E
$
GARAGE
LIABILITY
ANY AUTO
Not Applicable
AUTO ONLY- EA ACCIDENT
f
OTHER THAN M ACC
5
AUTO ONLY: AGG
s
D
EXCEssrumeRtu.AUAanrrY
CUP1077863689
08/01/03
08/01/04
EACH OCCURRENCE
j3,000.000
OCCUR CLAIMS"ADE
AGGREGATE
63.000,000
f
DEDUCTIBLEf
RETENTION $
D
WORIOER/I COMPENSATION ARP
EMPLOYERS' tummyTORY
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXOWaPD7
BPECW PROVISIONS blow
WC1077863661
•
08/01/03
08/01/04
X wO3TATLL ma-
UMRS ER
_
ElEAOH ACCIDENT
$SOO,OOO
EL. DISEASE - EA EMPLOYEE
0(10,000
E.L. DISEASE. POLICY uM1T
E
OTHER Professional
& Pollution IJab.
PEC000984102
08/01/03
08/01/04
s500,000
61,000,000 Each Claim
$2,000,000 Aggregate
$50,000 Retention
DESCRIPTION of OPEMTIONa / LOCATIONS I VEHICLES I EXCLUSIONS ADDDESY ENDOWMENT / SPECIAL PROVI81ON8
City of Round Rock is named as Additional insured on the general liability
for all work performed and/or supervised by the Named Insured but solely
as respects the City of Round Rock, TX - Basin LC12 and BC07: Smoke Testing
and TV Tape Review.
CERTIFICATE HOLDER _-_.___ - _–
City of Round Rock
Attn: Michael Thane
221 East Main Street
Round Rock, TX 78864
ACORD 23 (2001108) 1 of 2 #S88624/M88244
BHOULp ANY or THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE 188WNG INSURER WILL ENDEAVOR TO MAIL . DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED To THE LEFT, Bur FNLURETo Do Bo SHALL
IMPOSE NO OBLIGATION OR WBILITY OF ANY XING UPON THE INSURER, ITS ASENYII ort
REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
BAF
O ACORD CORPORATION 1988
08/25/2003 MON 12:31 [TX/RX NO 5334] 0 003
r
r t
SIGRAPHICS/COUNCIL AGENDA ITEM/ENGINEERING/2003)WASTEWATER UTtLITYNVW REHABILITATION/INSPECTI
DATE: September 5, 2003
SUBJECT: City Council Meeting - September 11, 2003
ITEM: 10.F.1. Consider a resolution authorizing the Mayor to execute an
Agreement for Engineering Services with RJN Group, Inc. for the
2002-2003 Wastewater Collection System Inspection of Non -
Edwards Aquifer Basins BC07 and LC12.
Resource: Tom Word, Chief of Public Works Operations
Tom Clark, Director of Utilities
Michael Thane, Public Works Engineer
History: This agreement is to provide television inspection analysis and reports on
the City of Round Rock wastewater collection system in two basins (BC07
and LC12). These basins are located within the Non -Edwards Aquifer
Recharge Zone portion of the City. The wastewater collection system within
these two basins were televised by the City of Round Rock I&I Department.
RJN will review the televised tapes and then provide recommendations for
future repairs of the collection system in these basins. Repairs will be
recommended for areas with structural damage and defects such as offsets,
open joints, or cracked or crushed lines that would allow infiltration to
occur. Lines with damages or defects will be repaired within one year of
inspection. The engineer has agreed to perform these services for $34,299.
Funding:
Cost:
Source of funds:
$34,299
Capital Project Funds (Wastewater Utility)
Outside Resources: RJN Group, Inc.
Impact/Benefit: Elimination of defects will reduce inflow & infiltration entering the
system, thereby reducing the City's treatment cost to the Lower
Colorado River Authority (LCRA) and the Brazos River Authority
(BRA), who own and operate the Brushy Creek Regional
Wastewater Treatment Plant. Inspecting all wastewater collection
systems within the City of Round Rock will help keep our
wastewater treatment cost down.
Public Comment: N/A
Sponsor: N/A
EXECUTED
DOCUMENT
FOLLOWS
A
'ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPEREEY.
CITY OF ROUND ROCK AGREEMENT
FOR ENGINEERING SERVICES WITH
RJN GROUP, INC.
FOR
BASIN LC12 AND BC07: TV TAPE REVIEW
THE STATE OF TEXAS
COUNTY OF WILLIAMSON
THIS AGRE ENT FOR ENGINEEIN SERVICES ("Agreement") is made and entered
into on this the 1) - day of the month of .4 �,,,illi//j 11, 2003, by and between the CITY OF
ROUND ROCK, a Texas home -rule municipal orporation, whose offices are located at 221 East Main
Street, Round Rock, Texas 78664-5299, (hereinafter referred to as "City"), and RJN GROUP, INC.,
whose principal place of business is located at 12160 Abrams Road, Suite 206, Dallas, Texas 75243,
(hereinafter called "Engineer"), and such Agreement is for the purpose of contracting for professional
engineering services.
RECITALS:
WHEREAS, V.T.C.A., Government Code §2254.002(2)(A)(vii) under Subchapter A entitled
"Professional Services Procurement Act" provides for the procurement by municipalities of services of
professional engineers; and
WHEREAS, City and Engineer desire to contract for such professional engineering services; and
WHEREAS, City and Engineer wish to document their agreement concerning the requirements
and respective obligations of the parties;
NOW, THEREFORE, WITNESSETH:
That for and in consideration of the mutual promises contained herein and other good and
valuable considerations, and the covenants and agreements hereinafter contained to be kept and
performed by the respective parties hereto, it is agreed as follows:
CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement and any exhibits attached hereto (which
exhibits are hereby incorporated into and made a part of this Agreement) and all Supplemental
Agreements (as defined herein in Article 13) which are subsequently issued. These form the entire
contract, and all are as fully a part of this Agreement as if attached to this Agreement or repeated herein.
12-03-09 -1 - 10F7
Engineering Sery Agreement -4-2003
File name: RJN-LC12 and BC07-TV Tape Review (00052688).doc
1
ARTICLE 1
SCOPE OF SERVICES TO BE PERFORMED BY CITY
City shall perform or provide services as identified in Exhibit A entitled "Services to be
Performed by City."
ARTICLE 2
SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER
Engineer shall perform engineering services as identified in Exhibit B entitled "Services to be
Performed by Engineer."
Engineer shall develop a mutually acceptable schedule of work as identified in Exhibit C entitled
"Work Schedule." Such Work Schedule shall contain a complete schedule so that the Engineer's Scope
of Services under this Agreement may be accomplished within the specified time and at the specified
cost. The Work Schedule shall provide specific work sequences and definite review times by City and
Engineer of all work performed. Should the review times take longer than shown on the Work Schedule,
through no fault of Engineer, additional time may be authorized by City through a written Supplemental
Agreement only if same is requested by a timely written request from Engineer which is approved by
City.
ARTICLE 3
CONTRACT TERM
(1) Term. This Agreement shall be from the date hereof and shall terminate at the close of
business on the 31st day of the month of May, 2004, unless extended by written Supplemental
Agreement executed by Engineer and City prior to the date of termination, or as otherwise terminated as
provided in Article 20 entitled "Termination." Any work performed or costs incurred after the date of
termination shall not be eligible for reimbursement.
Engineer shall notify City in writing as soon as possible if he/she/it determines, or reasonably
anticipates, that the work under this Agreement will not be completed before the termination date. In
that event City may, at its sole discretion, extend the contract term by timely written Supplemental
Agreement. Engineer shall allow adequate time for review and approval of his/her/its request for time
extension by City prior to expiration of this Agreement.
(2) Work Schedule. Engineer acknowledges that the Work Schedule is of critical importance,
and agrees to undertake all necessary efforts to expedite the performance of services required herein so
that construction of the project will be commenced and completed as scheduled. In this regard, Engineer
shall proceed with sufficient qualified personnel and consultants necessary to fully and timely
accomplish all services required under this Agreement in the highest professional manner.
(3) Notice to Proceed. After execution of this Agreement, Engineer shall not proceed with work
delineated in Article 2 entitled "Scope of Services to be Performed by Engineer" and in Exhibit B
Rev. 4/1 /03
2
entitled "Services to be Performed by Engineer" until authorized in writing by City to proceed as
provided in Article 7 entitled "Notice to Proceed."
ARTICLE 4
COMPENSATION
City shall pay and Engineer agrees to accept the amount shown below as full compensation for
all engineering services performed and to be performed under this Agreement.
The amount payable under this Agreement, without modification of the Agreement as provided
herein, is the sum of thirty four thousand two hundred and ninety nine dollars ($ 34,299.00) as shown in
Exhibit D entitled "Fee Schedule." The lump sum amount payable may be revised only by written
Supplemental Agreement in the event of a change in scope, additional complexity from that originally
anticipated, or change in character of work as authorized by City.
Engineer shall prepare and submit to City monthly progress reports in sufficient detail to support
the progress of the work and to support invoices requesting monthly payment. Any preferred format of
City for such monthly progress reports shall be identified in Exhibit B entitled "Services to be
Performed by Engineer." Satisfactory progress of work shall be maintained as an absolute condition of
payment.
The fee herein referenced may be adjusted for additional work requested and performed only if
approved by written Supplemental Agreement.
ARTICLE 5
METHOD OF PAYMENT
Payments to Engineer for services rendered shall be made while work is in progress. Engineer
shall prepare and submit to City, not more frequently than once per month, a progress report as
referenced in Article 4 above. Such progress report shall state the percentage of completion of work
accomplished during that billing period and to date. Simultaneous with submission of such progress
report, Engineer shall prepare and submit one (1) original and one (1) copy of a certified invoice in a
form acceptable to City. This submittal shall also include a progress assessment report in a form
acceptable to City.
Progress payments shall be made in proportion to the percentage of completion of work tasks
identified in Exhibit D entitled "Fee Schedule." Progress payments shall be made by City based upon
work actually provided and performed. Upon timely receipt and approval of each statement, City shall
make a good faith effort to pay the amount which, notwithstanding anything herein to the contrary, is
due and payable within thirty (30) days. City reserves the right to withhold payment pending verification
of satisfactory work performed. Engineer has the responsibility to submit proof to City, adequate and
sufficient in its determination, that tasks were completed.
Rev. 4/1/03
3
The certified statements shall show the total amount earned to the date of submission and shall
show the amount due and payable as of the date of the current statement. Final payment does not relieve
Engineer of the responsibility of correcting any errors and/or omissions resulting from his/her/its
negligence.
ARTICLE 6
PROMPT PAYMENT POLICY
In accordance with Chapter 2251, V.T.C.A., Texas Government Code, payment to Engineer
will be made within thirty (30) days of the day on which City receives the supplies, materials,
equipment, or within thirty (30) days of the day on which the performance of services was complete, or
within thirty (30) days of the day on which City receives a correct invoice for the supplies, materials,
equipment, or services, whichever is later. Engineer may charge a late fee (fee shall not be greater than
that which is permitted by Texas law) for payments not made in accordance with this prompt payment
policy; however, this policy does not apply to payments made by City in the event:
A. There is a bona fide dispute between City and Engineer concerning the supplies,
materials, or equipment delivered or the services performed that causes the payment to be
late; or
B. The terms of a federal contract, grant, regulation, or statute prevent City from making a
timely payment with federal funds; or
C. There is a bona fide dispute between Engineer and a subcontractor or between a
subcontractor and its supplier concerning supplies, materials, or equipment delivered or
the services performed which causes the payment to be late; or
D. The invoice is not mailed to City in strict accordance with instructions, if any, on the
purchase order, or this Agreement or other such contractual agreement.
City shall document to Engineer the issues related to disputed invoices within ten (10) calendar
days of receipt of such invoice. Any non -disputed invoices shall be considered correct and payable per
the terms of Chapter 2251, V.T.C.A., Texas Government Code.
ARTICLE 7
NOTICE TO PROCEED
City shall issue a written authorization to proceed with work identified in the Scope of Services.
City shall not be responsible for actions by Engineer or any costs incurred by Engineer relating to
additional work not included in Exhibit B entitled "Services to be Performed by Engineer."
Rev. 4/1/03
4
ARTICLE 8
PROJECT TEAM
City's Designated Representative for purposes of this Agreement is as follows:
Mr. Don Rundell
Chief Utility Engineer
2008 Enterprise Drive
Round Rock, Texas 78664
Telephone Number: (512) 218-5554
Facsimile Number: (512) 218-5563
Email Address: drundell@round-rock.tx.us
City's Designated Representative shall be authorized to act on City's behalf with respect to this
project. City or City's Designated Representative shall render decisions in a timely manner pertaining
to documents submitted by Engineer in order to avoid unreasonable delay in the orderly and sequential
progress of Engineer's services.
Engineer's Designated Representative for purposes of this Agreement is as follows:
Hugh M. Kelso
Regional Vice President
12160 Abrams Road, Suit 206
Dallas, Texas 75243
Telephone Number: (972) 437-4300
Facsimile Number: (972) 437-2707
E-mail Address: hkelso@rjn.com
ARTICLE 9
PROGRESS EVALUATION
Engineer shall, from time to time during the progress of the work, confer with City at City's
election. Engineer shall prepare and present such information as may be pertinent and necessary, or as
may be requested by City, in order for City to evaluate features of the work. At the request of City or
Engineer, conferences shall be provided at Engineer's office, the offices of City, or at other locations
designated by City. When requested by City, such conferences shall also include evaluation of
Engineer's services and work.
Should City determine that the progress in production of work does not satisfy the Work
Schedule, then City shall review the Work Schedule with Engineer to determine corrective action
required.
Engineer shall promptly advise City in writing of events which have or may have a significant
impact upon the progress of the work, including but not limited to the following:
Rev. 4/1/03
5
(1) Problems, delays, adverse conditions which may materially affect the ability to attain
program objectives, prevent the meeting of time schedules and goals, or preclude the
attainment of project work units by established time periods; and such disclosure shall be
accompanied by statement of actions taken or contemplated, and City assistance needed to
resolve the situation, if any; and
(2) Favorable developments or events which enable meeting the work schedule goals sooner
than anticipated.
ARTICLE 10
SUSPENSION
Should City desire to suspend the work, but not to terminate this Agreement, then such
suspension may be effected by City giving Engineer thirty (30) calendar days' verbal notification
followed by written confirmation to that effect. Such thirty -day notice may be waived in writing by
agreement and signature of both parties. The work may be reinstated and resumed in full force and
effect within sixty (60) days of receipt of written notice from City to resume the work. Such sixty-day
notice may be waived in writing by agreement and signature of both parties.
If City suspends the work, the contract period as determined in Article 3 is not affected and this
Agreement will terminate on the date specified unless this Agreement is amended indicating otherwise.
City assumes no liability for work performed or costs incurred prior to the date authorized by
City for Engineer to begin work, and/or during periods when work is suspended, and/or subsequent to
the contract completion date.
ARTICLE 11
ADDITIONAL WORK
If Engineer forms a reasonable opinion that any work he/she/it has been directed to perform is
beyond the scope of this Agreement and as such constitutes extra work, he/she/it shall promptly notify
City in writing. In the event City finds that such work does constitute extra work and exceeds the
maximum amount payable, City shall so advise Engineer and a written Supplemental Agreement will
be executed between the parties as provided in Article 13 entitled "Supplemental Agreements."
Engineer shall not perform any proposed additional work nor incur any additional costs prior to the
execution, by both parties, of a written Supplemental Agreement. City shall not be responsible for
actions by Engineer nor for any costs incurred by Engineer relating to additional work not directly
associated with the performance of the work authorized in this Agreement or any amendments thereto.
ARTICLE 12
CHANGES IN WORK
If City deems it necessary to request changes to previously satisfactorily completed work or
parts thereof which involve changes to the original scope of services or character of work under this
Agreement, then Engineer shall make such revisions as requested and as directed by City. Such
Rev. 4/1/03
6
revisions shall be considered as additional work and paid for as specified under Article 11 entitled
"Additional Work."
Engineer shall make revisions to work authorized hereunder as are necessary to correct errors
appearing therein, when required to do so by City. No additional compensation shall be due for such
work.
ARTICLE 13
SUPPLEMENTAL AGREEMENTS
The terms of this Agreement may be modified by written Supplemental Agreement if City
determines that there has been a significant change in (1) the scope, complexity or character of the
service to be performed, or (2) the duration of the work. Any such Supplemental Agreement must be
duly authorized by City Council Resolution. Where such City Council authorization is required,
Engineer shall not proceed until the appropriate Resolution has been adopted. Additional
compensation, if appropriate, shall be identified as provided in Article 4 entitled "Compensation."
Both parties must execute any written Supplemental Agreement within the contract period
specified in Article 3 entitled "Contract Term."
It is understood and agreed by and between both parties that Engineer shall make no claim for
extra work done or materials furnished until City grants full execution of the written Supplemental
Agreement and authorization to proceed. City reserves the right to withhold payment pending
verification of satisfactory work performed.
ARTICLE 14
OWNERSHIP OF DOCUMENTS
All data, basic sketches, charts, calculations, plans, specifications, and other documents created
or collected under the terms of this Agreement are the exclusive property of City and shall be furnished
to City upon request. All documents prepared by Engineer and all documents furnished to Engineer by
City shall be delivered to City upon completion or termination of this Agreement. Engineer, at
his/her/its own expense, may retain copies of such documents or any other data which he/she/it has
furnished City under this Agreement. Any release of information shall be in conformance with
requirements of the Texas Open Records Act.
ARTICLE 15
PERSONNEL, EQUIPMENT AND MATERIAL
Engineer shall furnish and maintain, at his/her/its own expense, quarters for the performance of
all services, and adequate and sufficient personnel and equipment to perform the services as required.
All employees of Engineer shall have such knowledge and experience as will enable them to perform
the duties assigned to them. Any employee of Engineer who, in the opinion of City, is incompetent or
whose conduct becomes detrimental to the work shall immediately be removed from association with
Rev. 4/1/03
7
the project when so instructed by City. Engineer certifies that he/she/it presently has adequate qualified
personnel in his/her/its employment for performance of the services required under this Agreement, or
will obtain such personnel from sources other than City. Engineer may not change the Project Manager
without prior written consent of City.
ARTICLE 16
SUBCONTRACTING
Engineer shall not assign, subcontract or transfer any portion of the work under this Agreement
without prior written approval from City. All subcontracts shall include the provisions required in this
Agreement and shall be approved as to form, in writing, by City prior to work being performed under
the subcontract. No subcontract shall relieve Engineer of any responsibilities under this Agreement.
ARTICLE 17
EVALUATION OF WORK
City, or any authorized representatives of it, shall have the right at all reasonable times to review
or otherwise evaluate the work performed or being performed hereunder and the premises on which it is
being performed. If any review or evaluation is made on the premises of Engineer or a subcontractor,
then Engineer shall provide and require its subcontractors to provide all reasonable facilities and
assistance for the safety and convenience of City or other representatives in the performance of their
duties.
ARTICLE 18
SUBMISSION OF REPORTS
All applicable study reports shall be submitted in preliminary form for approval by City before
any final report is issued. City's comments on Engineer's preliminary reports shall be addressed in any
final report.
ARTICLE 19
VIOLATION OF CONTRACT TERMS/BREACH OF CONTRACT
Violation of contract terms or breach of contract by Engineer shall be grounds for termination of
this Agreement, and any increased costs arising from Engineer's default, breach of contract, or violation
of contract terms shall be paid by Engineer.
ARTICLE 20
TERMINATION
This Agreement may be terminated before the stated termination date by any of the following
conditions.
(1) By mutual agreement and consent, in writing, of both parties.
Rev. 4/1/03
8
(2) By City, by notice in writing to Engineer, as a consequence of failure by Engineer to
perform the services set forth herein in a satisfactory manner.
(3) By either party, upon the failure of the other party to fulfill its obligations as set forth
herein.
(4) By City, for reasons of its own and not subject to the mutual consent of Engineer, upon
not less than thirty (30) days' written notice to Engineer.
(5) By satisfactory completion of all services and obligations described herein.
Should City terminate this Agreement as herein provided, no fees other than fees due and
payable at the time of termination shall thereafter be paid to Engineer. In determining the value of the
work performed by Engineer prior to termination, City shall be the sole judge. Compensation for work
at termination will be based on a percentage of the work completed at that time. Should City terminate
this Agreement under Subsection (4) immediately above, then the amount charged during the thirty -day
notice period shall not exceed the amount charged during the preceding thirty (30) days.
If Engineer defaults in the performance of this Agreement or if City terminates this Agreement
for fault on the part of Engineer, then City shall give consideration to the actual costs incurred by
Engineer in performing the work to the date of default, the amount of work required which was
satisfactorily completed to date of default, the value of the work which is usable to City, the cost to City
of employing another firm to complete the work required and the time required to do so, and other
factors which affect the value to City of the work performed at the time of default.
The termination of this Agreement and payment of an amount in settlement as prescribed above
shall extinguish all rights, duties, and obligations of City and Engineer under this Agreement, except
the obligations set forth herein in Article 21 entitled "Compliance with Laws." If the termination of this
Agreement is due to the failure of Engineer to fulfill his/her/its contractual obligations, then City may
take over the project and prosecute the work to completion. In such case, Engineer shall be liable to
City for any additional costs incurred by City.
Engineer shall be responsible for the settlement of all contractual and administrative issues
arising out of any procurements made by Engineer in support of the scope of services under this
Agreement.
ARTICLE 21
COMPLIANCE WITH LAWS
(1) Compliance. Engineer shall comply with all applicable federal, state and local laws,
statutes, codes, ordinances, rules and regulations, and the orders and decrees of any court, or
administrative bodies or tribunals in any manner affecting the performance of this Agreement,
including without limitation, minimum/maximum salary and wage statutes and regulations, and
licensing laws and regulations. Engineer shall furnish City with satisfactory proof of his/her/its
compliance.
Rev. 4/1/03
9
Engineer shall further obtain all permits and licenses required in the performance of the
professional services contracted for herein.
(2) Taxes. Engineer will pay all taxes, if any, required by law arising by virtue of the services
performed hereunder. City is qualified for exemption pursuant to the provisions of Section 151.309 of
the Texas Limited Sales, Excise, and Use Tax Act.
ARTICLE 22
INDEMNIFICATION
Engineer shall save and hold harmless City and its officers and employees from all claims and
liabilities due to activities of his/her/itself and his/her/its agents or employees, performed under this
Agreement, which are caused by or which result from error, omission, or negligent act of Engineer or of
any person employed by Engineer or under Engineer's direction or control.
Engineer shall also save and hold City harmless from any and all expenses, including but not
limited to attorneys fees which may be incurred by City in litigation or otherwise defending claims or
liabilities which may be imposed on City as a result of such activities by Engineer, its agents, or
employees.
ARTICLE 23
ENGINEER'S RESPONSIBILITIES
Engineer shall be responsible for the accuracy of his/her/its work and shall promptly make
necessary revisions or corrections resulting from errors, omissions, or negligent acts, and same shall be
done without compensation. City shall determine Engineer's responsibilities for all questions arising
from design errors and/or omissions. Engineer shall not be relieved of responsibility for subsequent
correction of any such errors or omissions or for clarification of any ambiguities until after the
construction phase of the project has been completed.
ARTICLE 24
ENGINEER'S SEAL
The responsible engineer shall sign, seal and date all appropriate engineering submissions to
City in accordance with the Texas Engineering Practice Act and the rules of the State Board of
Registration for Professional Engineers.
ARTICLE 25
NON -COLLUSION, FINANCIAL INTEREST PROHIBITED
(1) Non -collusion. Engineer warrants that he/she/it has not employed or retained any company
or persons, other than a bona fide employee working solely for Engineer, to solicit or secure this
Agreement, and that he/she/it has not paid or agreed to pay any company or engineer any fee,
commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting
Rev. 4/1/03
10
from the award or making of this Agreement. For breach or violation of this warranty, City reserves and
shall have the right to annul this Agreement without liability or, in its discretion and at its sole election,
to deduct from the contract price or compensation, or to otherwise recover, the full amount of such fee,
commission, percentage, brokerage fee, gift or contingent fee.
(2) Financial Interest Prohibited. Engineer covenants and represents that Engineer,
his/her/its officers, employees, agents, consultants and subcontractors will have no financial interest,
direct or indirect, in the purchase or sale of any product, materials or equipment that will be
recommended or required for the construction of the project.
ARTICLE 26
INSURANCE
(1) Insurance. Engineer, at Engineer's sole cost, shall purchase and maintain during the entire
term while this Agreement is in effect professional liability insurance coverage in the minimum amount
of One Million Dollars from a company authorized to do insurance business in Texas and otherwise
acceptable to City.
(2) Subconsultant Insurance. Without limiting any of the other obligations or liabilities of
Engineer, Engineer shall require each subconsultant performing work under this Agreement to maintain
during the term of this Agreement, at the subconsultant's own expense, the same stipulated minimum
insurance required in Article 26, Section (1) above, including the required provisions and additional
policy conditions as shown below in Article 26, Section (3).
Engineer shall obtain and monitor the certificates of insurance from each subconsultant in order
to assure compliance with the insurance requirements. Engineer must retain the certificates of insurance
for the duration of this Agreement, and shall have the responsibility of enforcing these insurance
requirements among its subconsultants. City shall be entitled, upon request and without expense, to
receive copies of these certificates of insurance.
(3) Insurance Policy Endorsements. Each insurance policy shall include the following
conditions by endorsement to the policy:
1. Each policy shall require that thirty (30) days prior to the expiration, cancellation, non-
renewal or any change in the limit or scope of coverage, a notice thereof shall be given to
City by certified mail to:
City Manager, City of Round Rock
221 East Main Street
Round Rock, Texas 78664
Engineer shall also notify City, within 24 hours of receipt, of any notices of expiration,
cancellation, non -renewal, or material change in coverage it receives from its insurer.
2. Companies issuing the insurance policies shall have no recourse against City for payment
of any premiums or assessments for any deductibles which are the sole responsibility of
and at the sole risk of Engineer.
Rev. 4/1/03
11
3. The term "City" or "City of Round Rock" shall include all authorities, boards,
commissions, departments, and officers of City and the individual members and
employees thereof in their official capacities, and/or while acting on behalf of the City of
Round Rock.
4. The policy clause "Other Insurance" shall not apply to any insurance coverage currently
held by City, to any such future coverage, or to City's Self -Insured Retentions of
whatever nature.
(4) Cost of Insurance. The cost of all insurance required herein to be secured and maintained by
Engineer shall be borne solely by Engineer, with certificates of insurance evidencing such minimum
coverage in force to be filed with City. Such Certificates of Insurance are evidenced as Exhibit F herein
entitled "Certificates of Insurance."
ARTICLE 27
COPYRIGHTS
City shall have the royalty -free, nonexclusive and irrevocable right to reproduce, publish or
otherwise use, and to authorize others to use, any reports developed by Engineer for governmental
purposes.
ARTICLE 28
SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon and inure to the benefit of the parties hereto, their
successors, lawful assigns, and legal representatives. Engineer may not assign, sublet or transfer any
interest in this Agreement, in whole or in part, by operation of law or otherwise, without obtaining the
prior written consent of City.
ARTICLE 29
SEVERABILITY
In the event any one or more of the provisions contained in this Agreement shall for any reason
be held to be invalid, illegal or unenforceable in any respect, then such invalidity, illegality or
unenforceability shall not affect any other provision thereof and this Agreement shall be construed as if
such invalid, illegal or unenforceable provision had never been contained herein.
ARTICLE 30
PRIOR AGREEMENTS SUPERSEDED
This Agreement constitutes the sole agreement of the parties hereto, and supersedes any prior
understandings or written or oral contracts between the parties respecting the subject matter defined
herein. This Agreement may only be amended or supplemented by mutual agreement of the parties
hereto in writing.
Rev. 4/1 /03
12
ARTICLE 31
ENGINEER'S ACCOUNTING RECORDS
Records pertaining to the project, and records of accounts between City and Engineer, shall be
kept on a generally recognized accounting basis and shall be available to City or its authorized
representatives at mutually convenient times. The City reserves the right to review all records it deems
relevant which are related to this Agreement.
ARTICLE 32
NOTICES
All notices to either party by the other required under this Agreement shall be personally
delivered or mailed to such party at the following respective addresses:
City:
City of Round Rock
Attention: City Manager
221 East Main Street
Round Rock, TX 78664
and to:
Stephan L. Sheets
City Attorney
309 East Main Street
Round Rock, TX 78664
Engineer:
Hugh M. Kelso
RJN Group, Inc.
12160 Abrams Road, Suite 206
Dallas, TX 75243
ARTICLE 33
GENERAL PROVISIONS
(1) Time is of the Essence. Engineer understands and agrees that time is of the essence and that
any failure of Engineer to complete the services for each phase of this Agreement within the agreed
Work Schedule may constitute a material breach of this Agreement. Engineer shall be fully responsible
for his/her/its delays or for failures to use his/her/its best efforts in accordance with the terms of this
Agreement. Where damage is caused to City due to Engineer's failure to perform in these
circumstances, City may withhold, to the extent of such damage, Engineer's payments hereunder
without waiver of any of City's additional legal rights or remedies.
Rev. 4/1/03
13
(2) Force Majeure. Neither City nor Engineer shall be deemed in violation of this Agreement
if prevented from performing any of their obligations hereunder by reasons for which they are not
responsible or circumstances beyond their control. However, notice of such impediment or delay in
performance must be timely given, and all reasonable efforts undertaken to mitigate its effects.
(3) Enforcement and Venue. This Agreement shall be enforceable in Round Rock,
Williamson County, Texas, and if legal action is necessary by either party with respect to the
enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in
Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the
laws and court decisions of the State of Texas.
ARTICLE 34
SIGNATORY WARRANTY
The undersigned signatory for Engineer hereby represents and warrants that the signatory is an
officer of the organization for which he/she has executed this Agreement and that he/she has full and
complete authority to enter into this Agreement on behalf of the firm. The above -stated representations
and warranties are made for the purpose of inducing City to enter into this Agreement.
IN WITNESS WHEREOF, the City of Round Rock has caused this Agreement to be signed in
its co orate ame by its Mayor, duly authorized to execute the same on its�.J,ehalf by Resolution No.
Q3 /OF/ , approved by the City Council on the / r" --f " day of the month of
duly
, 2003, and Engineer, RJN GROUP, INC., signing by and through his/her/its
duly authorized representative(s), thereby binding the parties hereto, their successors, assigns and
representatives for the faithful and full performance of the terms and provisions hereof.
CITY OF ROUND ROCK, T
By: /.:t11
�y?w • ayor
ATTEST:
By:
Christine Martinez, City Secretary
RJN GROUP, INC.:
By: jee jzA Zda
Hugh M. Kelso, its Regional Vice President
14
Rev. 4/1/03
LIST OF EXHIBITS ATTACHED
(1) Exhibit A "Services to be Performed by City"
(2) Exhibit B "Services to be Performed by Engineer"
(3) Exhibit C "Work Schedule"
(4) Exhibit D "Fee Schedule"
(5) Exhibit E "Work Authorizations"
(6) Exhibit F "Certificates of Insurance"
Rev. 4/1/03
15
Exhibit A
SERVICES TO BE PROVIDED BY THE CITY OF ROUND ROCK
City of Round Rock
Basin LC12 and BC07: TV Tape Review
1. Designate a person to act as the Owner's representative with respect to services to be
rendered under this contract. Such person shall have complete authority to transmit
instructions, receive information, and interpret and define Owner/s policies and decisions.
2. Provide all criteria and full information as to the Owner's requirements for the project,
including design objectives and constraints, space, capacity and performance
requirements, and any budgetary limitations; and furnish copies of all, which Owner will
require to be included in the project.
3. Place at the Engineer's disposal all available information including previous reports and
any other data relative to the project.
4. Arrange for access to and make provisions for Engineer and their Subconsultants to enter
upon public and private property as required for Engineer to perform the services under
this contract.
5. Examine all studies, reports, sketches, drawings specifications, proposals and other
documents presented by the Engineer, and render in writing decisions pertaining thereto
within a reasonable time so as not to delay the services of the Engineer.
6. Furnish approvals and permits for all governmental authorities having jurisdiction over
the Project and such approvals and consent from others as may be necessary for
completion of the project. Pay all fees associated with approvals and permits.
7. Give prompt notice to the Engineer whenever Owner observes or otherwise becomes
aware of any development that affects the scope or timing of Engineer's services.
8. Provide water to the Engineer and Engineer's Subcontractors at no cost, for use during
the project.
A(1)
Exhibit B — Services to be Performed by Engineer
Basin LC12 and BC07: TV Tape Review and Recommendations
I. Project Administration and Management:
A. Project Administration:
Meet with CITY staff on a periodic basis, to update previous work, to coordinate
upcoming work, and to receive any input from staff. Meetings will be held at
significant project milestones with written documentation of the meeting provided. A
total of two (2) meetings are anticipated.
Perform general consultation with appointed CITY representative on an as -needed
basis.
Perform ENGINEER's internal project control procedures on a monthly basis including
schedule and budget control, quality control review, and monthly progress reports.
B. Data Management:
1. All forms used will be scanned and the scanned information will be verified
through quality control measures.
2. Provide all information collected in electronic format (ACCESS Database
formatted for ArcView) and hard copy format. Quality control will be performed
on all data.
II. Analysis and Report:
This part of the project includes performing an engineering analysis of TV Inspection data
and developing recommendations and associated costs for collection system repairs.
A. Cleaning and Internal Television (TV) Inspection Tape Review:
1. Review CCTV Inspection tapes provided by the CITY for TV inspection
performed in Basins BC07 and LC12. Input the TV Inspection data into CASS for
quantification of defects. (85,000 linear feet is anticipated.)
B. Data Analysis:
1. Perform analysis for a rehabilitation plan based on data collected during TV
Inspection. The rehabilitation plan will include a list of defects, preliminary
repair method, and estimated rehabilitation cost. Final engineering design is not
included.
8x7/2003-2:07 PM
B(1)
2. Prepare and submit three (3) copies of a brief draft report, which includes results
of the tape review, cost estimates, and recommended plan to repair sewer lines.
The draft report will be presented and discussed with CITY staff. After
comments are received, a final report will be prepared and submitted to the
CITY. ENGINEER will provide five (5) copies of the final report.
III. Project Deliverables:
The ENGINEER shall compile all findings, reports and field cataloging into a hard copy
form and computer form. The ENGINEER shall deliver to the CITY, as outlined in the
Scope of Work, all information pertaining to the analysis of the project. Computer data
shall be formatted to be compatible with MS Windows software products coordinated with
the CITY prior to delivery.
All documentation and reports shall be delivered as outlined above and herein to be
accessed with MS Windows, Word, Excel, and Access (Specific versions will be
coordinated with CITY prior to delivery
8/7/2003-2:07 PM
B(2)
EXHIBIT C
SCHEDULE
City of Round Rock, Texas
TV Tape Review & Recommendations
(Basins BC07 and LC 12)
Task
Project Administration/Meetings
Data Management
TV Tape Analysis
Rehab Analysis
Report (Draft)
Final Report Submittal
Dates
8/7/2003 C (1)
October 15, 2003 to March 30, 2004
October 30, 2003 to March 30, 2004
November 1, 2003 to January 31, 2004
January 31, 2004 to March 15, 2004
March 15, 2004 to March 30, 2004
April 30, 2004
Exhibit D - Fee Schedule
Compensation to the ENGINEER for "Basic Engineering Services" shall be made as
follows:
Compensation for Basic Services provided under Exhibit B: "Services to be Performed
by Engineer" shall be in accordance with the methods in this attachment and the specific
amounts as set forth herein.
Compensation for the Basic Engineering Services shall be on the basis of a combination
of unit costs and lump sum costs.
A. Budgetary Amount
A budgetary amount for the Basic Services set forth in Exhibit B: "Services to be
Performed by Engineer" is hereby estimated below. It is also understood that the cost
budgets are based upon ENGINEER's best estimate of work and level of effort required
for the proposed scope of services. As the project progresses, it is possible that the level
of effort and/or scope may differ up or down from that assumed. If there are no scope
changes, the ENGINEER shall receive the full amount shown below. If at any time
during the project it appears that the cost may be exceeded, the ENGINEER will notify
the CITY as soon as possible in writing.
B. Cost Break Down
TASK DESCRIPTION UNIT UNIT ESTIMATED TOTAL
COST QUANTITIES COST
($) ($)
Mobilization and Project Administration LS 2,730 1 2,730
Data Management Program LS 1,309 1 1,309
TV Inspection Tape Review LF 0.263 85,000 22,355
Rehabilitation Analysis LS 3,695 1 3,695
Draft/Final Reports LS 4,210 1 4,210
TOTAL 34,299
8/7/2003-2:06 PM
D(1)
not GZ/ LYJtJ. 1 J: Jti 'JI L4J I'L I tl f
AUG -22-2003 09:57
lrcif!" l nrIL A I t OF LIABILITY INSURANCE
PROFESSIONAL SERVICES
PRODUCLR
Mack and Parker, inc.
55 East Jackson Boulevard
Chicago, IL 60604
INSURi..]D
RJN Group, Inc.
200 West Front Street
Wheaton, IL 60187
IJN GROUP, INC
PAGE 02
P.U2/02
Date: August 21, 2003
COMPANIES AFFORbING COVERAGE
A Greenwich Insurance Company
B
C
A
TI -11S LS TO CERTIFY THAT the Insured named above is insured bythe Coni
the business operations hereitiai$�r described, for the es of ins patties listed above with respect t
the standard policies used by the companies,� u»a and in a,ccordal�ce with the provisions o
below. and further hereinafter described Exceptions to the policies are note
CO TYPE OF INSURANCE POLICY
LTR NUMBER
RTECTTVE
DATE
PROF1~ssioNAL. uasttrry PE0000009841-02 8/01/03
'EXPIRATION
DATE
LIMITS
8/01/04 $1,000,000 Each Claim
$2,000,000 Aggregate
$ 50 000 Retention
)ESCRipTTONOPSPECIAL ITEMS/EXCEPTIONS Project: Basin LC12 and BC07
l ould any of the above described policies be cancelled or changed before the c*pfration date thereof the zssuin ca
f 0) day written notice to the cert] cats holder named below. S mPartY tfiirt
ERTIFICATE HOLDER;
City of Round Rook
221 E. Main Street
Round Rock Texas 78654
attn: Christina Martinez, City Secretary
d 2110/03 . P*ofurAmmO t6►bitley Cer , 1 Ooe
SIGNATURE QF AUTHORIZED REPRESENTATXV
Titis: Service Associate
TOTAL P.02
08/25/2003 MON 12:31 [TX/RX NO 5334] gi002
08/25/2003 13:38 9724372707
Client#- 13177
RJN GROUP, INC
PAGE 03
ACORD. CERTIFICATE
MO roprivur
OF LIABILITY INSURANCE
DAA(0°D",,
08/07//03
LTRINSRD
PRODUCER
Mack and Parker, Inc.
55 E. Jackson Blvd.HOLDER.
Chicago, IL. 60604
(Barbara Fritz 312-279-4618)
TYPE OF INSURANCE
THIS CERTIFICATh IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
INSURERS AFFORDING COVERAGE
NAIC #
INSURED
R J N Group, Inc.
200 W. Front Street
Wheaton. it 60187
Attn: Katrina Genore
NAVCO A,ae:e
A
WINSURERA: Transcontinental Insurance Company
20486
INaURER 8: Valley Forge
TCP1077883675
Noumea* Continental Casualty Company
20443
iNew r, o; Transportation Insurance Co.
20494
INSURER E; Greenwich insurance Company
22327
THE
ANY
MAY
POLICIES.
MR
POLICIES
REQUIREMENT,
PF,RTAIN,
OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POUCY PERIOD INDICATED. NOTWITHSTANDING
TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS ANP CONDMONS OF SUCH
AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS,
LTRINSRD
APD1
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE
DATE IMM,00IYYI
POLICY SpX(PpI�M(�TIQpN
DATE (MMIDDJYY1
LIMITS
A
GENERAL
LIABILITY
COMMERC4AL GENERAL LIABILITY
TCP1077883675
08/01/03
08/01/04
EACH OCCURRENCE
81,000,000
X
PEMS lt1 ai Leet
$100.000
CLAIMS MADE In OCCUR
MED EXP (My one person)
$10,000
PERSONAL BADV INJURY
31.000,000
32.000,000
GENERAL AGGREGATE
f EWLAGGREGATE LIMIT APPUEB PER:PRODUCTS
- COMP/OP AO0
51,000,000
7 POLICY M Ter IX 1 LOC
B
C
AUTOMOBILE
LIAMUTY
ANYAUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
HIRED AUTOS
NON -OWNED AUTD9
BUA1077863644
BUA1077863658
08/01/03
08/01/03
08/01/04
08/01/04
(Ea COMBINED
Eentt) SINGLE LIMIT
$1.000.000
X
_
BODILY INJURY
Mor ap,)s
5
X
BODILY INJURY
(Per accident)
3•
X
PROPERTY OAMAOE
(Por accident)
$
GARAGE LIABILITY
Not Applicable
ANY AUTO
AUTO ONLY - EA ACCIDENT
$
H
EA ACC
AUTO ON N AOG
$
D
EXCESSNNIHRELLALIABILITY
OCCUR n CLAMS MADE
CUP1077863689
08/01/03
08/01/04
EACH OCCURRENCE
83,900.000
53,000,000
1
AGGREGATE
HDEDUCTIBLE
RETENTION 3
5
3
D
WORKERS COMPENSATION AND
EMPLOYERS, UARIUTY
ANY PROPRIETO JPARTNERIIXECUTIVE
OyFeFIICERIMEMBER !XCI.UPED7•E.L.
urd,ALL P OVIsIONS beiow
WC1077863661
08/01/03
08/01/04
i�
X (TDImrs i"NRs rat
E.L. EAOH ACCIDENT
$500,000
DISEASE - EA EMPLOYEE
5500,000
EL DISEASE- POLICY LIMIT
$500,000
E
0TMER Professional
& Pollution limb.
PEC000984102
08/01/03
08/01/04
$1,000,000 Each Claim
$2,000,000 Aggregate
$50,000 Retention
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES 1 EXCLUSIONS ADDED BY ENDORSEMENT/ SPECIAL. PROVISIONS
City of Round Rock is named as Additional Insured on the general liability
for all work performed and/or supervised by the Named Insured but solely
as respects the City of Round Rock, TX - Basin LC12 and BC07: Smoke Testing
and TV Tape Review.
CFRTIFu ATC unt non
TION
City of Round Rock
Attn: Michael Thane
221 East Main Street
Round Rock, TX 78884
ACORD 25 (2001/08) 1 of 2 #S88624/M88244
BHOULP ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE 188UIN0 INSURER WILL ENDEAVOR TO MAIL , 90 DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BLIT !'M -URE TO DO BO SHALL
IMPOSE NO OBUOATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AOIO1Y3 OR
REPR!SLNTATN!$.
AUTHORIZED REPRBSENTATNE
Yn ? l,L-4..,..,,
D ACORD CORPORATION 1988
SAF
08/25/2003 MON 12:31 [TX/RX NO 5334] IJ003