Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R-03-08-28-10F2 - 8/28/2003
RESOLUTION NO. R -03-08-28-10F2 WHEREAS, the City of Round Rock has duly advertised for bids for the Citywide Sidewalk Improvements - Segment 1 Project, and WHEREAS, D. Schaffer Concrete Co. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of D. Schaffer Concrete Co., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with D. Schaffer Concrete Co. for the Citywide Sidewalk Improvements - Segment 1 Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of August, 2003. 41, A004.4 W • , Mayor - Ci •+hof Round Rock, Texas CHRISTINE R. MARTINEZ, City Secretar @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R30828F2.WPD/Sa Citywide Sidewalk Improvements - Segment 1 BID TABU: BIDDER TOTAL COST OF BID AS SHOWN ON CONTRACTORS BID FORM RANK Shaffer Concrete Co. $ 168,611.50 1 Cactus Concrete $ 198,427.70 2 Robert Jenisch Const. Inc. $ 254,212.10 3 Austin Bridge & Road, L.P. $ 265,672.00 4 Myers Construction Co. $ 327,431.10 5 Dayco Construction $ 373,315.90 6 Allstate Services Limited $ 391,916.00 7 8 9 10 BIDDER TOTAL COST OF BID AS MODIFIED FOR CORRECTNESS RANK Shaffer Concrete Co. $ 168,912.00 1 Cactus Concrete $ 198,427.70 2 Robert Jenisch Const. Inc. $ 254,212.10 3 Austin Bridge & Road, L.P. $ 265,672.00 4 Myers Construction Co. $ 327,431.10 5 Dayco Construction $ 372,730.90 6 Allstate Services Limited $ 391,862.00 7 8 9 10 Citywide Sidewalk Improvements - Segment 1 BID TABULATIC BIDDER Austin Bridge 8, Road, LP Robert Jentsch Const. Inc. Dayco Construction Allstate Services Limited BID DESCRIPTION BID UNIT UNIT COST AMOUNT BID UNIT COST AMOUNT BID UNIT COST AMOUNT BID UNIT COST AMOUNT BID U ITEM QTY. 1 4 -IN THICK CONCRETE SIDEWALK 3.5 -FT WIDE 2950 SF $ 5.00 $ 14,750.00 $ 3.70 $ 10,915.00 $ 4.60 $ 13,570.00 $ 3.50 $ 10,325.00 $ 2 PEDESTRIAN RAMPS 3 EA $ 1,000.00 $ 3,000.00 $ 700.00 $ 2,100.00 $ 603.00 $ 1,809.00 $ 800.00 $ 2,400.00 $ 3 RIGHT-OF-WAY PREPARATION 485 SY $ 4,00 $ 1,940.00 $ 5.00 $ 2,425.00 $ 11.30 $ 5,480.50 $ 13.00 $ 6,305.00 $ 4 RESTORATION & REVEGETATION 900 LF $ 0.25 $ 225.00 $ 1.50 $ 1,350.00 $ 4.65 $ 4,185.00 $ 15.00 $ 13,500.00 $ 5 TRAFFIC CONTROLS 1 EA $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 2,750.00 $ 2,750.00 $ 500.00 $ 500.00 $ 6 4 -IN THICK CONCRETE SIDEWALK 3.5 -FT WIDE 2619 SF $ 5.00 $ 13,095.00 $ 6.00 $ 15,714.00 $ 5.50 $ 14,404.50 $ 3.50 $ 9,166.50 $ 7 PARTIAL DRIVEWAY RECONSTRUCTION 2 EA $ 2,000.00 $ 4,000.00 $ 800.00 $ 1,600.00 $ 2,065.00 $ 4,130.00 $ 1,500.00 $ 3,000.00 $ 8 PEDESTRIAN RAMPS 2 EA $ 1,000.00 $ 2,000.00 $ 800.00 $ 1,600.00 $ 572.00 $ 1,144.00 $ 800.00 $ 1,600.00 $ 9 RIGHT-OF-WAY PREPARATION 850 SY $ 6.00 $ 5,100.00 $ 5.00 $ 4,250.00 $ 8.60 $ 7,310.00 $ 15.00 $ 12,750.00 $ 10 RESTORATION & REVEGETATION 1060 LF $ 0.25 $ 265.00 $ 1.30 $ 1,378.00 $ 4.60 $ 4,876.00 $ 15.00 $ 15,900.00 $ 11 TRAFFIC CONTROLS 1 EA $ 600.00 $ 600.00 $ 500.00 $ 500.00 $ 1,065.00 $ 1,065.00 $ 500.00 $ 500.00 $ 12 4 -IN THICK CONCRETE SIDEWALK 3.5 -FT WIDE 6177 SF $ 5.00 $ 30,885.00 $ 6.00 $ 37,062.00 $ 5.00 $ 30,885.00 $ 3.50 $ 21,619.50 $ 13 PARTIAL DRIVEWAY RECONSTRUCTION 2 EA $ 2,000.00 $ 4,000.00 $ 700.00 $ 1,400.00 $ 2,065.00 $ 4,130.00 $ 1,500.00 $ 3,000.00 $ 14 PEDESTRIAN RAMPS 11 EA $ 1,000.00 $ 11,000.00 $ 800.00 $ 8,800.00 $ 582.00 $ 6,402.00 $ 800.00 $ 8,800.00 $ 15 RIGHT-OF-WAY PREPARATION 1512 SY $ 5.00 $ 7,560.00 $ 5.00 $ 7,560.00 $ 8.00 $ 12,096.00 $ 13.00 $ 19.656.00 $ 16 RESTORATION & REVEGETATION 2080 LF $ 0.25 $ 520.00 $ 1.30 $ 2,704.00 $ 4.60 $ 9,568.00 $ 15.00 $ 31,200.00 $ 17 TRAFFIC CONTROLS 1 EA $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 2,750.00 $ 2,750.00 $ 500.00 $ 500.00 $ 18 PEDESTRIAN CROSSING TRAFFIC SIGNS AND STRIPING 1 LS $ 300.00 $ 300.00 $ 1,000.00 $ 1,000.00 $ 4,500.00 $ 4,500.00 $ 3,000.00 $ 3,000.00 $ 19 4 -IN THICK CONCRETE SIDEWALK 4.5 -FT WIDE 970 SF $ 5.00 $ 4,850.00 $ 6.00 $ 5,820.00 $ 5.60 $ 5,432.00 $ 3.50 $ 3,395.00 $ 20 4 -IN THICK CONCRETE SIDEWALK 4.0 -FT WIDE 2474 SF $ 5.00 $ 12,370.00 $ 6.00 $ 14,844.00 $ 4.60 $ 11,380.40 $ 3.50 $ 8,659.00 $ 21 PARTIAL DRIVEWAY RECONSTRUCTION 1 EA $ 2,000.00 $ 2,000.00 $ 800.00 $ 800.00 $ 2,065.00 $ 2,065.00 $ 1,500.00 $ 1,500.00 $ 22 PEDESTRIAN RAMPS 8 EA $ 1,000.00 $ 8,000.00 $ 700.00 $ 5,600.00 $ 706.00 $ 5,648.00 $ 800.00 $ 6,403.00 $ 23 RIGHT-OF-WAY PREPARATION 623 SY $ 5.00 $ 3,115.00 $ 5.00 $ 3,115.00 $ 10.00 $ 6,230.00 $ 10.00 $ 6,230.00 $ 24 RESTORATION & REVEGETATION 960 LF $ 0.25 $ 240.00 $ 1.40 $ 1,344.00 $ 4.60 $ 4,416.00 $ 15.00 $ 14,400.00 $ 25 TRAFFIC CONTROLS 1 EA $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 1,650.00 $ 1,650.00 $ 500.00 $ 500.00 $ 26 4 -IN THICK CONCRETE SIDEWALK 4.0 -FT WIDE 3145 SF $ 4.00 $ 12,580.00 $ 4.00 $ 12,580.00 $ 5.50 $ 17,297.50 $ 3.50 $ 11,007.50 $ 27 PARTIAL DRIVEWAY RECONSTRUCTION 4 EA $ 2,000.00 $ 8,000.00 $ 700.00 $ 2,800.00 $ 2,065.00 $ 8,260.00 $ 1,500.00 $ 6,000.00 $ 28 PEDESTRIAN RAMPS 6 EA $ 1,000.00 $ 6,000.00 $ 800.00 $ 4,800.00 $ 655.00 $ 3,930.00 $ 800.00 $ 4,800.00 $ 29 RIGHT-OF-WAY PREPARATION 649 SY $ 3.00 $ 1,947.00 $ 5.00 $ 3,245.00 $ 9.60 $ 6,230.40 $ 10.00 $ 6,490.00 $ 30 RESTORATION & REVEGETATION 1020 LF $ 0.25 $ 255.00 $ 2.50 $ 2,550.00 $ 4.60 $ 4,692.00 $ 15.00 $ 15,300.00 $ 31 TRAFFIC CONTROLS 1 EA $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 1,650.00 $ 1,650.00 $ 500.00 $ 500.00 $ 32 4 -IN THICK CONCRETE SIDEWALK 4.0 -FT WIDE 1123 SF $ 5.00 $ 5,615.00 $ 4.00 $ 4,492.00 $ 6.50 $ 7,299.50 $ 3.50 $ 3,930.50 $ 33 PARTIAL DRIVEWAY RECONSTRUCTION 1 EA $ 2,000.00 $ 2,000.00 $ 700.00 $ 700.00 $ 2,065.00 $ 2,065.00 $ 1,500.00 $ 1,500.00 $ 34 PEDESTRIAN RAMPS 1 EA $ 1,000.00 $ 1,000.00 $ 800.00 $ 800.00 $ 705.00 $ 705.00 $ 800.00 $ 800.00 $ 35 RIGHT-OF-WAY PREPARATION 300 SY $ 10.00 $ 3,000.00 $ 5.00 $ 1,500.00 $ 9.00 $ 2,700.00 $ 10.00 $ 3,000.00 $ 36 RESTORATION & REVEGETATION 410 LF $ 0.25 $ 102.50 $ 2.50 $ 1,025.00 $ 4.60 $ 1,886.00 $ 15.00 $ 6,150.00 $ 37 TRAFFIC CONTROLS 1 EA $ 300.00 $ 300.00 $ 300.00 $ 300.00 $ 1,100.00 $ 1,100.00 $ 500.00 $ 500.00 $ 38 4 -IN THICK CONCRETE SIDEWALK 4.0 -FT WIDE 3309 SF $ 5.00 $ 16,545.00 $ 5.00 $ 16,545.00 $ 6.60 $ 21,839.40 $ 3.50 $ 11,581.50 $ 39 4 -IN THICK CONCRETE SIDEWALK 3.5 -FT WIDE 1351 SF $ 5.00 $ 6,755.00 $ 3.90 $ 5,268.90 $ 4.60 $ 6,214.60 $ 3.50 $ 4,728.50 $ 40 PARTIAL DRIVEWAY RECONSTRUCTION 9 EA $ 2,000.00 $ 18,000.00 $ 800.00 $ 7,200.00 $ 2,295.00 $ 20,655.00 $ 1,500.00 $ 13,500.00 $ 41 PEDESTRIAN RAMPS 10 EA $ 1,000.00 $ 10,000.00 $ 700.00 $ 7,000.00 $ 650.00 $ 6,500.00 $ 800.00 $ 8,000.00 $ 42 RIGHT-OF-WAY PREPARATION 1170 SY $ 2.00 $ 2,340.00 $ 5.00 $ 5,850.00 $ 8.60 $ 10,062.00 $ 13.00 $ 15,210.00 $ 43 RESTORATION & REVEGETATION 1430 LF $ 0.25 $ 357.50 $ 2.00 $ 2,860.00 $ 4.10 $ 5,863.00 $ 15.00 $ 21,450.00 $ 44 CULVERT PIPE RAILING TYPE B 70 LF $ 25.00 $ 1,750.00 $ 60.00 $ 4,200.00 $ 86.70 $ 6,069.00 $ 50.00 $ 3,500.00 $ 45 CULVERT MODIFICATIONS 18 LF $ 300.00 $ 5,400.00 $ 200.00 $ 3,600.00 $ 505.00 $ 9,090.00 $ 100.00 $ 1,800.00 $ 46 TRAFFIC CONTROLS 1 EA $ 800.00 $ 800.00 $ 1,000.00 $ 1,000.00 $ 4,120.00 $ 4,120.00 $ 500.00 $ 500.00 $ 47 4 -IN THICK CONCRETE SIDEWALK 3.5 -FT WIDE 1393 SF $ 5.00 $ 6,965.00 $ 3.90 $ 5,432.70 $ 6.00 $ 8,358.00 $ 3.50 $ 4,875.50 $ 48 NEW DRIVEWAY RESIDENTIAL 1 EA $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 8,800.00 $ 8,800.00 $ 2,000.00 $ 2,000.00 $ 49 PEDESTRIAN RAMPS 1 EA $ 1,000.00 $ 1,000.00 $ 800.00 $ 800.00 $ 750.00 $ 750.00 $ 800.00 $ 800.00 $ 50 RIGHT-OF-WAY PREPARATION 289 SY $ 4.00 $ 1,156.00 $ 5.00 $ 1,445.00 $ 9.30 $ 2,687.70 $ 10.00 $ 2,890.00 $ 51 RESTORATION & REVEGETATION 400 LF $ 0.25 $ 100.00 $ 2.00 $ 800.00 $ 4.60 $ 1,840.00 $ 15.00 $ 6,000.00 $ 52 TRAFFIC CONTROLS 1 EA $ 200.00 $ 200.00 $ 500.00 $ 500.00 $ 1,100.00 $ 1,100.00 $ 500.00 $ 500.00 $ 53 4 -IN THICK CONCRETE SIDEWALK 3.5 -FT WIDE 2675 SF $ 4.50 $ 12,037.50 $ 3.90 $ 10,432.50 $ 5.50 $ 14,712.50 $ 3.50 $ 9,362.50 $ 54 NEW DRIVEWAY RESIDENTIAL 1 EA $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 8,315.00 $ 8,315.00 $ 2,000.00 $ 2,000.00 $ 55 PEDESTRIAN RAMPS 1 EA $ 1,000.00 $ 1,000.00 $ 800.00 $ 800.00 $ 740.00 $ 740.00 $ 800.00 $ 800.00 $ 56 RIGHT-OF-WAY PREPARATION 553 SY $ 3.00 $ 1,659.00 $ 5.00 $ 2,765.00 $ 9.30 $ 5,142.90 $ 10.00 $ 5,530.00 $ 57 RESTORATION & REVEGETATION 770 LF $ 0.25 $ 192.50 $ 2.00 $ 1,540.00 $ 4.00 $ 3,080.00 $ 15.00 $ 11,550.00 $ 58 TRAFFIC CONTROLS 1 EA $ 300.00 $ 300.00 $ 500.00 $ 500.00 $ 1,100.00 $ 1,100.00 $ 500.00 $ 500.00 $ TOTAL COST OF BID AS MODIFIED FOR CORRECTNESS $ 265,672.00 $ 254,212.10 $ 372,730.90 $ 391,862.00 TOTAL COST OF BID AS SHOWN ON CONTRACTORS BID FORM $ 265 672.00 $ 254 12.10 $ 15.90 $ 391 ' 6.00 TIONS Cactus Concrete Shaffer Concrete Co. Myers Construction Co. UNIT COST AMOUNT BID UNIT COST AMOUNT BID UNIT COST AMOUNT BID $ 4.10 $ 12,095.00 $ 3.50 $ 10,325.00 $ 4.20 $ 12,390.00 $ 750.00 $ 2,250.00 $ 650.00 $ 1,950.00 $ 450.00 $ 1,350.00 $ 0.10 $ 48.50 $ 1.00 $ 485.00 $ 4.60 $ 2231.00 $ 2.40 $ 2,160.00 $ 1.00 $ 900.00 $ 8.35 $ 7,515.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 2,000.00 $ 2,000.00 $ 4.10 $ 10,737.90 $ 3.50 $ 9,166.50 $ 4.20 $ 10,999.80 $ 500.00 $ 1,000.00 $ 750.00 $ 1,500.00 S 1,600.00 $ 3,200.00 $ 750.00 $ 1,500.00 $ 650.00 $ 1,300.00 $ 450.00 $ 900.00 $ 0.10 $ 85.00 $ 1.00 $ 850.00 $ 4.60 $ 3,910.00 $ 2.40 $ 2,544.00 $ 1.00 $ 1,060.00 $ 8.35 $ 8,851.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 2,200.00 $ 2,200.00 S 4.10 $ 25,325.70 $ 3.50 $ 21,619.50 $ 4.20 $ 25,943.40 S 500.00 $ 1,000.00 $ 750.00 $ 1,500.00 $ 1,600.00 $ 3,200.00 $ 750.00 $ 8,250.00 $ 650.00 $ 7,150.00 $ 450.00 $ 4,950.00 $ 0.10 $ 151.20 $ 1.00 $ 1,512.00 $ 4.60 $ 6,955.20 $ 2.40 $ 4,992.00 $ 1.00 $ 2,080.00 $ 8.35 $ 17,368.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 4,400.00 $ 4,400.00 $ 2,500.00 $ 2.500.00 $ 1,000.00 $ 1,000.00 $ 2,700.00 $ 2,700.00 S 4.10 $ 3,977.00 $ 3.50 $ 3,395.00 $ 4.40 $ 4,268.00 $ 4.10 S 10,143.40 $ 3.50 $ 8,659.00 $ 4.30 $ 10,638.20 $ 500.00 $ 500.00 $ 750.00 $ 750.00 $ 1,600.00 $ 1,600.00 $ 750.00 $ 6,000.00 $ 650.00 $ 5,200.00 $ 450.00 $ 3,600.00 S 0.10 $ 62.30 $ 1.00 $ 623.00 $ 4.60 $ 2,865.80 $ 2.40 $ 2,304.00 $ 1.00 $ 960.00 $ 8.35 $ 8,016.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 2,200.00 $ 2,200.00 S 4.10 $ 12,894.50 $ 3.50 $ 11,007.50 $ 4.30 $ 13,523.50 S 500.00 $ 2,000.00 $ 750.00 $ 3,000.00 $ 1,600.00 $ 6,400.00 3 750.00 $ 4,500.00 $ 650.00 $ 3,900.00 $ 450.00 $ 2,700.00 $ 0.10 $ 64.90 $ 1.00 $ 649.00 $ 4.60 $ 2,985.40 $ 2.40 $ 2,448.00 $ 1.00 $ 1,020.00 $ 8.35 $ 8,517.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 2,200.00 $ 2,200.00 $ 4.10 $ 4,604.30 $ 3.50 $ 3,930.50 $ 4.20 $ 4,716.60 $ 500.00 $ 500.00 $ 750.00 $ 750.00 $ 1,600.00 $ 1,600.00 $ 750.00 $ 750.00 $ 650.00 $ 650.00 $ 450.00 $ 450.00 $ 0.10 $ 30.00 $ 1.00 $ 300.00 $ 4.60 $ 1,380.00 $ 2.40 $ 984.00 $ 1.00 $ 410.00 $ 8.35 $ 3,423.50 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 4.10 $ 13,566.90 $ 3.50 $ 11,581.50 $ 4.30 $ 14,228.70 $ 4.10 $ 5,539.10 $ 3.50 $ 4,728.50 $ 4.20 $ 5,674.20 $ 500.00 $ 4,500.00 $ 750.00 $ 6,750.00 $ 1,600.00 $ 14,400.00 $ 750.00 $ 7,500.00 $ 650.00 $ 6,500.00 $ 450.00 $ 4,500.00 $ 0.10 $ 117.00 $ 1.00 $ 1,170.00 $ 4.60 $ 5,382.00 $ 2.40 $ 3,432.00 $ 1.00 $ 1,430.00 $ 8.35 $ 11,940.50 $ 50.00 $ 3,500.00 $ 40.00 $ 2,800.00 $ 280.00 $ 19,600.00 S 100.00 $ 1,800.00 $ 100.00 $ 1,800.00 $ 420.00 $ 7,560.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 3,470.00 $ 3,470.00 $ 4.10 $ 5,711.30 $ 3.50 $ 4,875.50 $ 4.20 $ 5,850.60 $ 1,000.00 $ 1,000.00 $ 1,250.00 $ 1,250.00 $ 1,600.00 $ 1,600.00 $ 750.00 $ 750.00 $ 650.00 $ 650.00 $ 450.00 $ 450.00 S 0.10 $ 28.90 $ 1.00 $ 289.00 $ 4.60 $ 1,329.40 $ 2.40 $ 960.00 $ 1.00 $ 400.00 $ 8.35 $ 3,340.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 4.10 $ 10,967.50 $ 3.50 $ 9,362.50 $ 4.20 $ 11,235.00 $ 1,000.00 $ 1,000.00 $ 1,250.00 $ 1.250.00 $ 1,600.00 $ 1,600.00 $ 750.00 $ 750.00 $ 650.00 $ 650.00 $ 450.00 $ 450.00 $ 0.10 $ 55.30 $ 1.00 $ 553.00 $ 4.60 $ 2,543.80 $ 2.40 $ 1,848.00 $ 1.00 $ 770.00 $ 8.35 $ 6,429.50 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 1,700.00 $ 1,700.00 S 198,427.70 $ 168,912.00 $ 327,431.10 $ 198,427.70 $ 164,611.50 $ 327,431.10 BID DATE: AUGUST 12, 2003 BID TIME: 2:00 P.M. Page 1 of 2 - -\ c-, --7 /� BOND OF ROUND ROCK , TEXAS ��T GO BOND SEGMENT ALLK PRO4K-C 1 - MAP / 7 J� 2 N 1'4 K.C. BNIGINEEFIKO. NC.. AUXIN - TAIILpII - IMMIE PALLID UFA EOM MOM EWOORIWIX SURE WO NAM 1MAII 71174$ OFFICE O12-308-801113 FAX N2-330-0737 .,rw DATE: August 22, 2003 SUBJECT: City Council Meeting - August 28, 2003 ITEM: 10.F.2. Consider a resolution authorizing the Mayor to execute a contract with D. Schaffer Concrete Co. for the construction of the G.O. Bond City Sidewalk Improvements - Segment 1 Project. Resource: Tom Word, Chief of Public Works Operations Danny Ha!den, City Engineer Ruth Haberman, Project Manager History: Seven bids were received on August 12, 2003 for the sidewalk project. This project will build approximately 7,600 I.f. of sidewalk in the Chisholm Valley Subdivision and along Oxford Blvd., Stratford Drive and Windy Park. The project will complete a portion of the Overall Citywide Sidewalk Plan. Funding: Cost: $168,912 Source of funds: Capital Project Funds (GO Bond 2001) Outside Resources: K. C. Engineering, Inc. - Consulting Engineer D. Schaffer Concrete Co.- Contractor Impact/Benefit: This project will build approximately 7,600 I.f. of sidewalk in the Chisholm Valley Subdivision and along Oxford Blvd., Stratford Drive and Windy Park. This will complete a portion of the Overall Citywide Sidewalk Plan. Public Comment: N/A Sponsor: N/A