Loading...
R-09-04-23-10A1 - 4/23/2009RESOLUTION NO. R -09-04-23-10A1 WHEREAS, the City of Round Rock has duly advertised for bids for the 2009 Water Treatment Plant Rehabilitation Project - Phase IV Sludge Collection Equipment Retrofits Project, and WHEREAS, Excel Construction Services LLC has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Excel Construction Services LLC, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Excel Construction Services LLC for the 2009 Water Treatment Plant Rehabilitation Project - Phase IV Sludge Collection Equipment Retrofits Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amender. RESOLVED this 23rd day of April, ATTEST: SARA L. WHITE, City Secretary O:\wdox\SCCInts\0112\0905\MUNICIPAL\R90923A1.DOC/rmc City of Round Rock, Texas alefa-o, s/ loj- RZ j5rt DATE: April 16, 2009 SUBJECT: City Council Meeting — April 23, 2009 ITEM: 10A1. Consider a resolution authorizing the Mayor to execute a Construction Contract with Excel Construction Services, LLC for the 2009 Water Treatment Plant Rehabilitation Project — Phase IV Sludge Collection Equipment Retrofits. Department: Water & Wastewater Utilities Staff Person: Michael D. Thane, P.E. , Director of Utilities Justification: The work under this contract consists of removing and replacing the Water Treatment Plant's Phase IV Sludge Collection Equipment. This repair work consists of replacing sprockets and shafting, bearings, chains, flight wear shoes, floor wear strips, return guide track wear strips and take-up bearings for each of the two existing Phase IV sedimentation basins. The proposed schedule for completing the construction work is June 16, 2009. Meeting this schedule is critical to the plant's ability to treat and distribute this summer's water demands. Funding: Cost: Source of funds: Outside Resources: $194,400.00 Capital Project Funds (Self -Financed Utility) Camp, Dresser, & McKee, Inc. Background Information: Several projects at the City's Water Treatment Plant are in various phases that will enable the City to treat and distribute its full amount of reserved raw water. One of the projects is a new 7.5 MG High Service Pump that is currently under construction. Other projects include the rehabilitation of the plant's process structures, the construction of a climatic controlled MCC Room for High Service Pumps 1 through 6, and the additional 1.5 MG clearwell are scheduled to bid this summer and be completed prior to the summer of 2010. With TCEQ's approval of our re -rating, the plant will be able to provide a firm 52 mgd of potable water to our distribution system by the summer of 2010 and into the future. Public Comment: N/A April 17, 2009 Mr. Don Rundell, P.E. Chief Utility Engineer City of Round Rock Water and Wastewater Utilities 212 Commerce Blvd. Round Rock, TX 78664 Subject: City of Round Rock Water Treatment Plant (WTP) 2009 Water Treatment Plant Rehabilitation Project Phase IV Sludge Collection Equipment Retrofits Award Recommendation Dear Mr. Rundell: Camp Dresser & McKee Inc. (CDM) has reviewed the bid packages received for the above -referenced Phase IV Sludge Collection Equipment Retrofits Project. CDM understands that all bid packages are being reviewed by the City of Round Rock, Water and Wastewater Utilities and other applicable departments for compliance with all bid requirements. CDM further understands that all bids contained the necessary acknowledgements and requirements, such as Bid Bonds (5%), etc. The following paragraphs summarize the results of the Bid opening: CDM also evaluated the bids using the Best Value criteria specified in Article 14, which examined the bidder's price, reputation, experience, and to install, test and startup the sludge collection equipment. Tabulated results of the City of Round Rock and CDM's Best Value analysis: Section 00100, time necessary below are the Phase IV Award Letter. doc Bidders Total Amount Bid Acknowledge All Addenda Beneficial Use Completion Schedule Section 00420, Bidders Qualification Form 1 Excel Construction Services, L.L.C. $194,400 Yes 16 days Yes 2 Keystone Construction, Inc. $220,769.63 Yes 30 days Yes 3 Matous Construction, Ltd. $234,000 Yes 60 days Yes CDM also evaluated the bids using the Best Value criteria specified in Article 14, which examined the bidder's price, reputation, experience, and to install, test and startup the sludge collection equipment. Tabulated results of the City of Round Rock and CDM's Best Value analysis: Section 00100, time necessary below are the Phase IV Award Letter. doc Mr. Don Rundell, P.E. April 17, 2009 Page 2 Item Max Score Excel Construction Services, L.C.C. Keystone Construction, Inc. Matous Construction, Ltd. Base Bid Price (Item 1) cost - $194,400.00 $220,769.63 $234,000.00 points 40 40 35.2 33.2 Reputation (Item 2) rating- 1 1 1 points 5 5 5 5 Experience (Item 3) rating- 1 1 1 points 15 15 15 15 Install Schedule (Item 4) days- 16 30 60 points 40 40 30 8.6 Total points 100 100 85.2 61.8 BEST VALUE: EXCEL CONSTRUCTION SERVICES, L.L.C. Based on the above results, Excel Construction Services, L.L.C. has been determined to be the BEST VALUE for the above -referenced project. Accordingly, CDM recommends award of the City of Round Rock WTP, Phase IV Sludge Collection Equipment Retrofits Project to Excel Construction Services, L.L.C. Please feel free to contact us if you have any questions related to this matter. Sincerely, Steven V. Lynk, P.E. Project Manager Camp Dresser & McKee Inc. xc: Michael Thane, CORR Becca Ramsey, CORR Ana Karamalegos, CDM Jeff Bell, CORR Allen Woelke, CDM Alex Doody, CDM Phase IV Award Letter.doc