CM-2017-1496 - 10/20/2017STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: AECOM TECHNICAL SERVICES ("Engineer") ADDRESS: 9400 Amberelen Boulevard, Austin, TX 78729 PROJECT: Dam 101-30% Desis:n This Supplemental Contract No. I to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and AECOM Technical Services. hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 28th day of July, 2016 for the Dam 101 — 30% Design Project in the amount of $922,866.00; and WHEREAS, it has become necessary to amend the Contract to modify the work schedule; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follois] C,M - 1) / -7, lqq� Supplemental Contract 0199 1756.00387597 Rc,,.06 16 84275 AECOM TECHNICAL SERVICES By: Tyler P. Jones, Senior Vice President I I October 2017 Date Supplemental Contract Rcv,06:16 0199 1756, 003975 97 84275 CITY OF ROUND ROCK APP EDS ZRM: By: hefty, MARA Stepha L. Sheets, City Attorney /C) - 2-C) Date Supplemental Contract hcv.06 i6 0199 1756,00387397 84275 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page City of ROU -id R01. Contract for Engincenng Services EXHIBIT C Wn 101 'Vo Dosigez Work Schedule - REVISED "rhe attached selledule below provides approximate durations associated %0(h the anticipated milestones - The durations are approximate, and are dependent on field work, «hich may be subject to weather events and proper(} owner access conditions. As such. the durations may extend beyond that shomi. Award Est 7128 lG (City Council) NTP Executed contract 813 16 Task Approx. Duration Approx Start Approx. End I. Project Management 12nio . 84 16 4:30 18 2 Auxiliary Spillway Siting 3 mos. 8,15 16 4 30� 18 a EiCld hncstigations 7 mo%. 8- LS 16 4`30 I8 4 Env. Invest/ Permit Suppon L mos &2; 16 4 30'18 S Pre[ iminary/30",'o Design 11 111115 9.27 16 430,18 6 Omners Contingency r, nr. 4. 10:1 17 430 18 Page til of I City of Round Rock IROUN0 ROCK xa Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with AECOM Technical Services for the Dam 101 - 30% Design Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/20/2017 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: Indexes: Self -Financed Drainage Construction Attachments: SC#1.pdf, LAF.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2017-1496 Consider executing Supplemental Contract No. 1 with AECOM Technical Services for the Dam 101 - 30% Design Project. This Engineering Services Contract with AECOM Technical Services, Inc. to continue design and analysis work for Dam 101 resulting in 30% design plans. The preliminary design phase includes the remaining geotechnical investigation, additional environmental investigations, preliminary easement delineations, and 30% plans and construction estimates. This contract has finished major milestones; however, a date extension is necessary to continue design progress until the final design contract is negotiated. This Supplemental Contract will extend the contract time to April 30, 2018. Dam 101 is a joint project between the Upper Brushy Creek Water Control Improvement District (UBCWCID) and the City to substantially lessen the frequency and depth of flooding along Lake Creek, particularly in the Greater Round Rock West area. The UBCWCID and City signed an ILA that assigned responsibility for coordinating design, construction, and funding of Dam 101 to the City. The UBCWCID is contributing $6 Million to the project and will operate and maintain the dam when complete. Per the ILA, the City already received the initial payment of $2 Million. City of Round Rock Page 1 Printed on 10/19/2017 Agenda Item Summary Continued (CM -2017-1496) Source of Funds: Self -Finance Drainage Construction CI1y o/Round Rock Paye 2 Printed on 10/19/2017