R-09-04-23-10D3 - 4/23/2009RESOLUTION NO. R -09-04-23-10D3
WHEREAS, the City of Round Rock ("City") and the Union Pacific
Railroad Company ("UPRR") entered into a Public Road Crossing
Improvement Agreement ("Agreement") for the crossing at Sam Bass
Road, on August 28, 2008, and
WHEREAS, the City now desires to enter into a Supplemental
Agreement to the Agreement, and
WHEREAS, the City Council wishes to approve said Agreement,
Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a Supplemental Agreement with Union Pacific
Railroad Company, a copy of same being attached hereto as Exhibit
"A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice
of the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to
the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered
and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amende
RESOLVED this 23rd day of April,2 0
ATTEST:
. 4fAxkl,
SARA L. WHITE, City Secretary
0:\wdox\SCC1nts\0112\0905\MUNICIPAL\R90923D3.DOC/cmc
City of Round Rock, Texas
68- C/i-F-, 1viayr- Pio-1 to
BUILDIN AMERICA'
UPRR Folder No.: 2488-41
UPRR Audit No.: 249032
SUPPLEMENTAL AGREEMENT
THIS SUPPLEMENTAL AGREEMENT (the "Second Supplement") is made as of the
day of , 200 , by and between UNION PACIFIC RAILROAD
COMPANY, a Delaware corporation ("Railroad") and the CITY OF ROUND ROCK, a municpal
corporation of the State of Texas ("City").
RECITALS:
By instrument dated September 12, 2008, the parties hereto or their predecessors in interest
(if any), entered into an agreement identified as Railroad's Folder No. 2488-41, Audit No. 249032
(the "Original Agreement") covering the surface improvements to the existing Sam Bass Road at -
grade public road crossing, (DOT No. 439-701F), located at Railroad Mile Post 1.62 on its
Georgetown Industrial Lead in Round Rock, Williamson County, Texas (the "Roadway").
The Railroad and the City now wish to enter into this Supplemental Agreement providing for
the Railroad, at City's expense, installing automatic flashing light crossing signals with gates, and
some surface work associated with the signal improvements, as such signal improvements are
described in the Railroad's Signal Material Estimate work dated July 26, 2008, marked Exhibit A,
attached hereto and hereby made a part hereof (the "Estimate"). The signal improvements described
in this paragraph and in the Estimate are hereinafter collectively referred to as the "Signal
Improvements". The scope of work involving the Signal Improvements and the locations of the
Signal Improvements are described and shown on the Railroad's Detailed Signal Work Prints
marked Exhibit B, attached hereto and hereby made a part hereof
AGREEMENT:
NOW, THEREFORE, IT IS MUTUALLY AGREED BY AND BETWEEN THE
PARTIES HERETO AS FOLLOWS:
SECTION 1. RAILROAD'S INSTALLATION OF SIGNAL IMPROVEMENTS
A. The Railroad, at City's expense, shall install the Signal Improvements. As set forth in the
Estimate, the Railroad's estimated cost of installing the Signal Improvements is Two Hundred
Forty -Seven Thousand Five Hundred Forty -Seven Dollars ($247,547.00).
B. The City agrees to reimburse the Railroad for one hundred percent (100%) of all actual costs
incurred by the Railroad in connection with this Second Supplement including, but not limited
to, actual costs of preliminary engineering review, construction inspection, procurement of
materials, equipment rental, manpower and deliveries to the job site and all of the Railroad's
normal and customary additives which shall include direct and indirect overhead costs associated
therewith.
C. The Railroad shall send progressive billing to the City during the project and final billing to the
2488-41 City of Round Rock, TX Page 1 of 3
Sam Bass Road
EXHIBIT
nAn
Revised January 22, 2009
BUILDING AMER!
City within one hundred eighty (180) days after the Railroad has completed the installation and
construction of the Signal Improvements.
SECTION 2. MAINTENANCE OF SIGNAL IMPROVEMENTS
The City agrees to reimburse the Railroad the cost of future maintenance of the automatic
grade -crossing protection within thirty (30) days of the City's receipt of billing.
SECTION 3. INTERFERENCE
The City shall take all suitable precautions to prevent any interference (by induction, leakage
of electricity or otherwise) with the operation of the signal, communication lines or other
installations or facilities of the Railroad or its tenants, and if at any time the operation or
maintenance of the signals results in any electrostatic effects which the Railroad deems undesirable
or harmful, or causes interference with the use and operation of the signal, communication lines or
other installations or facilities, as now existing or which may be installed or constructed in the future
by the Railroad and/or its tenants, the City shall, at its expense, immediately take such action as may
be necessary to eliminate such interference.
SECTION 4. AGREEMENT IS SUPPLEMENTAL TO ORIGINAL AGREEMENT
This Supplement is supplemental to the Original Agreement, and nothing contained in this
Supplement shall be construed as amending or modifying the Original Agreement except has herein
specifically provided.
SECTION 5. AUTHORIZATION
The persons signing this Supplement confirm that they are duly authorized under the
Railroad's or City 's policies and procedures to execute this Supplement and to bind the Railroad and
City, as the case may be, to the obligations under this Supplement.
2488-41 City of Round Rock, TX
Sam Bass Road
Page 2 of 3 Revised January 22, 2009
BUILDING AMERICA'
IN WITNESS WHEREOF, the parties hereto have caused this Second Supplement to be
executed in duplicate as of the date first herein written.
2488-41 City of Round Rock, TX
Sam Bass Road
UNION PACIFIC RAILROAD COMPANY
(Federal Tax ID No. 94-6001323)
By
JAMES P. GADE
Director Contracts
CITY OF ROUND ROCK
By
Title:
Page 3 of 3 Revised January 22, 2009
Cover Sheet for the
Railroad's Signal Material Estimate
DATE: 2008-07-26
ESTIMATE OF MATERIAL AND FORCE ACCOUNT 'WORK """
BY THE
UNION PACIFIC RAILROAD
THIS ESTIMATE GOOD FOR 6 MONTHS EXPIRATION DATE IS :2009-01-24
DESCRIPTION OF WORK:
INSTALL AUTOMATIC FLASHING LIGHT CROSSING SIGNALS
WITH GATES AT ROUND ROCK, TX. SAM BASS RD. M.P.1.62
ON THE GEORGETOWN IND. LEAD DOT 439 701F
WORK TO BE PERFORMED BY RAILROAD WITH EXPENSE AS BELOW:
SIGNAL - CITY OF ROUND ROCK, TX. - 1001
ESTIMATED USING FEDERAL ADDITIVES WITH OVERHEAD AND
INDIRECT COST'S - 167.76*
PID: 57965 AWG; 59728 MP,SUBDIV: 1.62, GEORGETOWN
SERVICE UNIT: 12 CITY; ROUND ROCK STATE: TX
DESCRIPTION
QTY UNIT LABOR MATERIAL RECOLL UPRR TOTAL
ENGINEERING W0RK
ENGINEERING 6922 6922 6922
LABOR ADDITIVE 167.761 19611 19611 19611
SIG-HWY XNG 4821 4821 4821
TOTAL ENGINEERING 31354 31354 31354_
SIGNAL WORK
BILL PREP 900 900 900
CONTRACT 5470 5470 5470
LABOR ADDITIVE 167.761 61440 61440 61440
MATL STORE EXPENSE 11 11 11
METER SERVICE 2000 2000 2000
NON STOCK GATES ASSEM. 16522 16522 16522
PERSONAL EXPENSES 21006 21006 21006
ROCK/GRAVEL/FILL 3000 3000 3000
SIGNAL 36623 54704 91327 91327
TRANSP/IB/OB/RCLW CONTE 9790 9790 9790
WZT CONTROL 4726 4726 4726
ENVIRONMENTAL 1. 1 1
TOTAL SIGNAL
98963 117230 216193 216193
LABOR/MATERIAL EXPENSE 130317 117230
RECOLLECTIBLE/UPRR EXPENSE 247547 0
ESTIMATED PROJECT COST
247547
THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF
AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED,
UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE.
Exhibit A
Railroad Signal Material Estimate
E
HIB IT B
To Supplemental.Agreement;
GQver -Sheet for the
Railroad's Detailed Signal Work Prints
0
0
Y
0
TO MAIN UNE
939' 25.5.2 SEC. (C.T.7 0 20 M.P.H.
939.25.5.2 SEC. (C.T.la 20 M.P.H.
z
p
p �_N
a
1D N
iL
0
P
T
N
0
io
•
et- 64
14
16
6' \ \ ' ♦ N.
to
irtttet
1n u /f\
\
S \
\
N.
\N.
4 N. \\N.
0
Zyl
1H1
N
z
N
0
6
X
w z
E
el'
i
08
u& i°T ry
WZW
Ke
Zay3bpf� Ee mW
z
Jeel f
WNx vVWJ Ng W:
145
p0
yIQ3LL ��e-p^(p
¢? W¢x
.N..Y
pO
ad tel -
2T =4'w mob�++ v w
WFWm a 5
�`¢5.
p�w'`� N a a app 0
�ar 41tE �� 1i!j3 JJW 3. C
17-14 gemJ¢ �¢Y 4 ¢
k.2
ALL LIGHTS TO BE Ir ROUNDELS.
09.0 0U t.'W J0 01 s133ri0oi
Q
1 N
UNION PACIFIC
JF
b
El
4
Exhibit B
Railroad Detailed Signal Work Print
DATE: April 16, 2009
SUBJECT: City Council Meeting — April 23, 2009
ITEM: 10D3. Consider a resolution authorizing the Mayor to execute a Supplemental
Agreement to the Public Road Crossing Improvement Agreement with Union
Pacific Railroad Company for the Sam Bass Road Project.
Department:
Staff Person:
Justification:
Transportation Services
Tom Word, P.E., Chief of Public Works Operation
This Supplemental Agreement with Union Pacific Railroad (UPRR) is for signal improvements to the
existing Sam Bass Road at -grade public road crossing at UPRR mile post 1.62. The Agreement will
provide for UPRR to install automatic flashing Tight crossing signals with gates and surface work
associated with signal improvements. The associated costs provide for preliminary engineering review,
construction inspection, materials procurement and equipment rentals. This work will widen the
existing surface crossing to accommodate additional pavement width.
Funding:
Cost: $247,547.00
Source of funds: 4B
Outside Resources: Union Pacific Railroad Company
Background Information:
The original contract was approved by City Council on August 28, 2008 (R -08-08-28-9C1). The Railroad
will furnish all labor and supervision for the installation of 96 -feet of concrete road crossing panels, re-
lay 320 -feet of track, install 70 cross ties, install 2 carloads of ballast, other surface and track materials,
the Engineering and flagging all of the intersections of the Railroad's Georgetown Industrial Lead with
Sam Bass Road.
Public Comment: N/A
EXECUTED
DOCUMENT
FOLLOWS
BUILDING AMERICA'
UPRR Folder No.: 2488-41
UPRR Audit No.: 249032
SUPPLEMENTAL AGREEMENT
,A,,�,,,,�� THIS SUPPLEMENTAL AGREEMENT (the "Second Supplement") is made as of the
1,23= day of kvi:e. , 200 9 , by and between UNION PACIFIC RAILROAD
COMPANY, a Delaware corporation ("Railroad") and the CITY OF ROUND ROCK, a municpal
corporation of the State of Texas ("City").
RECITALS:
By instrument dated September 12, 2008, the parties hereto or their predecessors in interest
(if any), entered into an agreement identified as Railroad's Folder No. 2488-41, Audit No. 249032
(the "Original Agreement") covering the surface improvements to the existing Sam Bass Road at -
grade public road crossing, (DOT No. 439-701F), located at Railroad Mile Post 1.62 on its
Georgetown Industrial Lead in Round Rock, Williamson County, Texas (the "Roadway").
The Railroad and the City now wish to enter into this Supplemental Agreement providing for
the Railroad, at City's expense, installing automatic flashing light crossing signals with gates, and
some surface work associated with the signal improvements, as such signal improvements are
described in the Railroad's Signal Material Estimate work dated July 26, 2008, marked Exhibit A,
attached hereto and hereby made a part hereof (the `Estimate"). The signal improvements described
in this paragraph and in the Estimate are hereinafter collectively referred to as the "Signal
Improvements". The scope of work involving the Signal Improvements and the locations of the
Signal Improvements are described and shown on the Railroad's Detailed Signal Work Prints
marked Exhibit B, attached hereto and hereby made a part hereof
AGREEMENT:
NOW, THEREFORE, IT IS MUTUALLY AGREED BY AND BETWEEN THE
PARTIES HERETO AS FOLLOWS:
SECTION 1. RAILROAD'S INSTALLATION OF SIGNAL IMPROVEMENTS
A. The Railroad, at City's expense, shall install the Signal Improvements. As set forth in the
Estimate, the Railroad's estimated cost of installing the Signal Improvements is Two Hundred
Forty -Seven Thousand Five Hundred Forty -Seven Dollars ($247,547.00).
B. The City agrees to reimburse the Railroad for one hundred percent (100%) of all actual costs
incurred by the Railroad in connection with this Second Supplement including, but not limited
to, actual costs of preliminary engineering review, construction inspection, procurement of
materials, equipment rental, manpower and deliveries to the job site and all of the Railroad's
normal and customary additives which shall include direct and indirect overhead costs associated
therewith.
C. The Railroad shall send progressive billing to the City during the project and final billing to the
12---oc- 0 b
2488-41 City of Round Rock, TX
Sam Bass Road
Page 1 of 3 Revised January 22, 2009
BUILDING AMER!
City within one hundred eighty (180) days after the Railroad has completed the installation and
construction of the Signal Improvements.
SECTION 2. MAINTENANCE OF SIGNAL IMPROVEMENTS
The City agrees to reimburse the Railroad the cost of future maintenance of the automatic
grade -crossing protection within thirty (30) days of the City's receipt of billing.
SECTION 3. INTERFERENCE
The City shall take all suitable precautions to prevent any interference (by induction, leakage
of electricity or otherwise) with the operation of the signal, communication lines or other
installations or facilities of the Railroad or its tenants, and if at any time the operation or
maintenance of the signals results in any electrostatic effects which the Railroad deems undesirable
or harmful, or causes interference with the use and operation of the signal, communication lines or
other installations or facilities, as now existing or which may be installed or constructed in the future
by the Railroad and/or its tenants, the City shall, at its expense, immediately take such action as may
be necessary to eliminate such interference.
SECTION 4. AGREEMENT IS SUPPLEMENTAL TO ORIGINAL AGREEMENT
This Supplement is supplemental to the Original Agreement, and nothing contained in this
Supplement shall be construed as amending or modifying the Original Agreement except has herein
specifically provided.
SECTION 5. AUTHORIZATION
The persons signing this Supplement confirm that they are duly authorized under the
Railroad's or City 's policies and procedures to execute this Supplement and to bind the Railroad and
City, as the case may be, to the obligations under this Supplement.
2488-41 City of Round Rock, TX
Sam Bass Road
Page 2 of 3 Revised January 22, 2009
BUILDING AMERICA°
IN WITNESS WHEREOF, the parties hereto have caused this Second Supplement to be
executed in duplicate as of the date first herein written.
2488-41 City of Round Rock, TX
Sam Bass Road
UNION PACIF ' • ILROAD COMPANY
(Feder..* ID No. 94-6001323)
By
JAMES P. GADE
Director Contracts
Page 3 of 3 Revised January 22, 2009
5 �
E e 3�S
AW
` 3 1LOON
�„jF t My � \E
3Eos5 65 3s£ 3�£f
P .393 �3 J epi
r
�£ 3 3 ks
Alk
\ e
0",
Mums
MAI"
"F
\ s
—U
_710"'k
1 \� ON 7,A P-W
¢ v ra a v'
€ N asp,
ff
"T"
Of!Dkt
Tcer � ta A e eM_
� p
iR a E r
Ay_
T i (� 3 F r
Rat ad' a ` at E
ae
�n t
'U,QMR3nngl ` Mr
vllMeng
M.
Ok
� 1 3 R
y�
Cuc
Hoy B i,q'
3P•. 0'�i 3
lip
# 5. 4 ( 3NPIP3
3. �A
3'
Mrs
EF maps
£
' k isal
EE�,
V AV
..
Piillm4lrc e ! INS
DATE: 2008-07-26
ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK
BY THE
UNION PACIFIC RAILROAD
THIS ESTIMATE GOOD FOR 6 MONTHS EXPIRATION DATE IS :2009-01-24
DESCRIPTION OF WORK:
INSTALL AUTOMATIC FLASHING LIGHT CROSSING SIGNALS
WITH GATES AT ROUND ROCK, TX. SAM BASS RD. M.P.1.62
ON THE GEORGETOWN IND. LEAD DOT 439 701F
WORK TO BE PERFORMED BY RAILROAD WITH EXPENSE AS BELOW:
SIGNAL - CITY OF ROUND ROCK, TX. - 100t
ESTIMATED USING FEDERAL ADDITIVES WITH OVERHEAD AND
INDIRECT COST'S - 167.76%
PID: 57965 AMU: 59728
SERVICE UNIT: 12 CITY: ROUND ROCK
DESCRIPTION
HP,SUBDIV: 1.62, GEORGETOWN
STATE: TX
QTY UNIT LABOR MATERIAL RECOLL UPRR TOTAL
ENGINEERING WORK
ENGINEERING 6922 6922
6922
LABOR ADDITIVE 167.76% 19611 19611 19611
SIG-HWY XNG 4821 4821
4821
TOTAL ENGINEERING 31354 31354 31354
SIGNAL WORK
BILL PREP 900 900 900
CONTRACT 5470 5470 5470
LABOR ADDITIVE 167.761 61440 61440 61440
MATL STORE EXPENSE 11 11 11
METER SERVICE 2000 2000 2000
NON STOCK GATES ASSEM. 16522 16522 16522
PERSONAL EXPENSES 21006 21006 21006
ROCK/GRAVEL/FILL 3000 3000 3000
SIGNAL 36623 54704 91327 91327
TRANSP/IB/OB/RCLW CONTR 9790 9790 9790
WZT CONTROL 4726 4726 4726
ENVIRONMENTAL
TOTAL SIGNAL
1
1 1
98963 117230 216193 216193
LABOR/MATERIAL EXPENSE 130317 117230
RECOLLECTIBLE/UPRR EXPENSE 247547 0
ESTIMATED PROJECT COST
247547
THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF
AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED,
UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE.
Exhibit A
Railroad Signal Material Estimate
-10
�. M _ €
H §
3 §
9 N
- §
A � 314
� W!
l 9
-'IRS
'a ¢a i 3 �Ma
'' - 3 a• �aEq I:a ra�s '�`�
� 6
c-
..........dp � { E=A e�
3
E I F
E
-, & ¢WOU
� O
oat
ailr 's ails io rin
�g
Ma X y. 32 ; a L
SPIEL' VIN
x EE
e i NO
b) i a. �.��
3
�> E \
Ion
5
IMF
T IF Miami a s E F
rM�:
WIP
ag3 A
TO KERR DX002
939' 25.5.2 SEC. cC.T.I O 20 M.P.M
939' 25*5.2 SEC._(C.T.) 0 20 M.P.M.
To
10
0
112
c
11Z
Z9Z
Z1Z
¢
N1151X/Z11
811SIM/ill
C
1' $� +
.iY
WONDER DRIVE
\ti
Z91
191
1�N
0
:.it
N
1
1-
8
g
LL
uk $zrg� g p
irc g,0w J� 0
o
Ja•
TQ bl Of ¢' m
A Z FO O f0
ayJN6I UQ1..Q114 ;I -I, p £ L.:" u<
F aF7 m^! Z oa g
i„,11 1Wy Y! S
c-rcc— r
yy1-% m 0.4-.% O O
6l mi_7 z�z��: �'V � i^I
p0 ¢WT t- ILL W
.5w 9dQWoi a5'a a 0
V.-. ,' W@gkgD' 0.fzz Jaagr ^ G 2
ta.
.~N.. ~ L. t.,H � 3,/ ycc t37
W FF.4 IOW FQl ¢rZ ¢ W iii
g�
09'0 MM. V80 01 9133111100
•
b
N
x 0
1 J
▪ N N J
• ▪ $ m
.0 W F .•
• .001 x J 0 V V X
2
b
S
nr
0
CO
1 N
d
C
.1
=1
Exhibit B
Railroad Detailed Signal Work Print