Loading...
R-09-05-14-9D1 - 5/14/2009RESOLUTION NO. R -09-05-14-9D1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Austin Bridge and Road for the East Austin Avenue and East Liberty Avenue Improvements Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Contract Change Order No. 1 to the Contract with Austin Bridge and Road for the East Austin Avenue and East Liberty Avenue Improvements Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of May, 2009. ATTEST: •. t,wL SARA L. WHITE, City Secreta 0: \Wox\SCC1nts\0112\0905\MONICIPAL\R90519➢1.000/rn:c ALAN MCGRAW, Mayor City of Round Rock, Texas CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 2 DEPARTMENT: Engineering & Development Services DATE: February 25, 2009 PROJECT: E. Austin Ave./E. Liberty Ave.: Roadway, Drainage CHANGE ORDER NO: 1 & Utility Improvements ORIGINAL CONTRACT PRICE: JUSTIFICATION: $3,148,115.00 Please See Attached Justification Sheet PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: $0.00 $54,294.50 CHANGE ORDERS TO DATE: $54,294.50 CHANGE DATA EXHIBIT "An ITEM # r9.......rv..Y.... v.n........n DESCRIPTION OF CHANGES .. +x.......a-..rv.....x. c+v. +rc+....vn r.. .<.... ..... :... ......r-....... UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 31 Furnish & Install 18" RCP Class III ........._ LF .......v -.C. r ..w -14 .v. .. ... a.m..�.. $45.00 ..�... ......nr... ........ ($630.00) ..-....._........a-.. a.....a......: 0 32 Fumish & Install 18" Arched RCP Class III LF -30 $60.00 ($1,800.00) 0 33 Fumish & Install 24" RCP Class III LF 6 $50.00 $300.00 10 38 Furnish & Install 8" PVC C900 Class 200 (DR -18) LF 84 $46.00 $3,864.00 0 41 Furnish & Install 8" x 8" Cross EA 1 $1,000.00 $1,000.00 0 42 Furnish & Install 8" x 8" Tee EA 1 $2,000.00 $2,000.00 0 43 Furnish & Install 8" Gate Valve & Valve Box EA 1 $800.00 $800.00 0 47 Connect to Existing 8" Water Line EA 1 $2,500.00 $2,500.00 0 56 Furnish & Install 8" PVC SDR 26 Wastewater Pipe LF 423 $71.00 $30,033.00 0 61 Furnish & Install Single Wastewater Service EA 5 $1,500.00 $7,500.00 16 CO -1 Furnish & Install Standard 6" Clean Out EA 2 $318.00 $636.00 0 CO -2 Remove and Lower 8" SDR 26 Wastewater Pipe LF 105 $60.70 $6,373.50 0 CO -3 Remove and Relocate New Wastewater Manhole EA 1 $318.00 $318.00 0 CO -4 Remove and Relocate Existing Chain Link Fence LF 140 $10.00 $1,400.00 0 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total $54,294.50 26 EXHIBIT "An DEPARTMENT: Engineering & Development Services PROJECT: E. Austin AveJE. Liberty Ave.: Roadway, Drainage & Utility Improvements PAGE 2 OF 2 DATE: February 25, 2009 • PREPARED B g(neering & Development Services Aust n Bridge & Road, L.P. t/ - -0S Date SIGNATURE: ME OF CONTRACTOR PRINT NAME/TITLE: APPROVED: PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: 1.72% PREVIOUS CHANGE ORDER: 0.00% TOTAL % CHANGE: 1.72% I r ORIGINAL CONTRACT PRICE PLUS C I\\ lS OTC rc o n ( i�1c rc jtf - CHANGE ORDERS: $3,202,409.50 CITY OF ROUND ROCK constco2/forms6/Ik ITEM # DESCRIPTION OF CHANGES ......- �.,.m UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 94.50 ///� i TOTAL: $54,294s0 26 PREPARED B g(neering & Development Services Aust n Bridge & Road, L.P. t/ - -0S Date SIGNATURE: ME OF CONTRACTOR PRINT NAME/TITLE: APPROVED: PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: 1.72% PREVIOUS CHANGE ORDER: 0.00% TOTAL % CHANGE: 1.72% I r ORIGINAL CONTRACT PRICE PLUS C I\\ lS OTC rc o n ( i�1c rc jtf - CHANGE ORDERS: $3,202,409.50 CITY OF ROUND ROCK constco2/forms6/Ik t Austin Austin Bridge & Road An Austin Industries Company 100% Employee Owned February 25, 2009 Mr. Lance Shellenberger Project Manager City of Round Rock 2008 Enterprise Drive Round Rock, Texas 78664 Ref: E. Austin Ave./E. Liberty Ave. Project Change Order Request Dear Mr. Shellenberger: Austin Bridge & Road, L.P. 12112 Volente Rd. (RM 2769) Austin, Texas 78726 512/219-5776 512/219-6322 (Fax) Due to changes in the character of work on the referenced project, Austin Bridge & Road respectfully submits the attached request for change The following list briefly describes the changes to the work and the additional time required: Storm Sewer: o Extended the storm sewer and inlets on the south side of the intersection of Burnet & Austin. Roadway excavation had already begun and excavation was delayed in that area until the inlets and storm sewer were extended. Requesting 10 additional days Water: o The existing 6" and 2" water lines were discovered abandoned during construction. Added approximately 43' of 8" water line, 1- 90 degree bend in order to connect to an existing 8" water line located on the east side of the intersection of Black and Austin. No additional days requested Wastewater: o Extended N. Stone WW Line East along Liberty Avenue in order to tie in two services not shown on the plans. Requesting 6 additional days. o Extended N. Black WW Line East along Liberty Avenue in order to tie in three shallow services that are tied into a wastewater line in Georgetown St. Requesting 10 additional days. February 25, 2009 Mr. Lance Shellenberger Change Order Request Page 2 For these reasons we request the addition of Change Order # 1 to the contract to include an additional $54,294.50 and 26 contract days. Please contact me if you need any additional information. Yours truly, Ai ate. - Jacob O. Woehr, P.E. Proj ect Manager cc: Trae Sutton, Tom Byrum, 408506 job file Enclosures t Austin DATE: May 7, 2009 SUBJECT: City Council Meeting — May 14, 2009 ITEM: *9D1. Consider a resolution authorizing the Mayor to execute Changer Order No. 1 with Austin Bridge and Road for East Austin Avenue and East Liberty Avenue Improvements Project. Department: Staff Person: Justification: Engineering & Development Services Danny Haiden, P.E., City Engineer Change Order No. 1 is needed to accommodate the change in scope of this project and adds twenty-six (26) days to the Austin Bridge and Road's contract. Funding: Cost: $54,294.50 Source of funds: 2002 G.O. Bonds Amount % Change Original Contract $3,148,115.00 N/A Previous Change Orders $0.00 N/A Change Order # 1 $54,294.50 1.7% Revised Contract $3,202,409.50 1.7% Outside Resources: Austin Bridge and Road Kasberg, Patrick, and Associates Background Information: The original construction contract with Austin Bridge and Road, R -08-04-24-10C1, is for street, drainage, and some water and wastewater line improvements on East Austin Avenue and East Liberty Avenue. This change order adjusts the original contract amount due to work associated with underground utilities (water, wastewater, and sewer). The need for additions and deletions to the scope of the underground utility work became apparent only upon discovery during construction that the existing infrastructure differed from the record information or from investigative determinations made prior to construction. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 2 DEPARTMENT: Engineering & Development Services DATE: February 25, 2009 PROJECT: E. Austin Ave./E. Liberty Ave.: Roadway, Drainage CHANGE ORDER NO: 1 & Utility Improvements ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: $3,148,115.00 $0.00 $54,294.50 CHANGE ORDERS TO DATE: $54,294.50 JUSTIFICATION: Please See Attached Justification Sheet V --d14 - l -t7 ( ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 31 Furnish & Install 18" RCP Class III LF -14 $45.00 ($630.00) 0 32 Fumish & Install 18"Arched RCP Class III LF -30 $60.00 ($1,800.00) 0 33 Furnish & Install 24" RCP Class III LF 6 $50.00 $300.00 10 38 Furnish & Install 8" PVC C900 Class 200 (DR -18) LF 84 $46.00 $3,864.00 0 41 Fumish & Install 8" x 8" Cross EA 1 $1,000.00 $1,000.00 0 42 Fumish & Install 8" x 8" Tee EA 1 $2,000.00 $2,000.00 0 43 Furnish & Install 8" Gate Valve & Valve Box EA 1 $800.00 $800.00 0 47 Connect to Existing 8" Water Line EA 1 $2,500.00 $2,500.00 0 56 Furnish & Install 8" PVC SDR 26 Wastewater Pipe LF 423 $71.00 $30,033.00 0 61 Fumish & Install Single Wastewater Service EA 5 $1,500.00 $7,500.00 16 CO -1 Furnish & Install Standard 6" Clean Out EA 2 $318.00 $636.00 0 CO -2 Remove and Lower 8" SDR 26 Wastewater Pipe LF 105 $60.70 $6,373.50 0 CO -3 Remove and Relocate New Wastewater Manhole EA 1 $318.00 $318.00 0 CO -4 Remove and Relocate Existing Chain Link Fence LF 140 $10.00 $1,400.00 0 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total $54,294.50 26 V --d14 - l -t7 ( DEPARTMENT: Engineering & Development Services PROJECT: E. Austin AveJE. Liberty Ave.: Roadway, Drainage & Utility Improvements PAGE 2 OF 2 DATE: February 25, 2009 ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING $0.00 > $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $O.Oo $o.00 $0.00 $o.00 $0.00 $a.00 $o.00 $o.00 $o.00 $o.00 ./� /Oi TOTAL: $54,294.50 26 PREPARED El( Engineering & Development Services Austin Bridge & Road, L.P. g.o 9 Date IME OF CONTRACTOR 4 SIGNATURE: PRINT NAME/TITLE: cLiti )147 APPROVED: G�crc^-4- Cn\ CITY OF ROUND ROCK And, PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: 1.72% PREVIOUS CHANGE ORDER: 0.00% TOTAL % CHANGE: 1.72% ORIGINAL CONTRACT PRICE PLUS 4. € _ CHANGE ORDERS: $3,202,409.50 constco2/forms6/Ik