Loading...
R-09-05-14-9G10 - 5/14/2009RESOLUTION NO. R -09-05-14-9G10 WHEREAS, the Round Rock Transportation System Development Corporation ("RRTSDC") has previously adopted a Transportation Capital Improvement Plan ("Plan"), and WHEREAS, the RRTSDC wishes to amend said Plan, and WHEREAS, the bylaws of the RRTSDC require that said amendments to the Plan be approved by the City Council, and WHEREAS, the City Council wishes to approve said amendments to the Plan, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the amendment to the Transportation Capital Improvement Plan approved by the Round Rock Transportation System Development Corporation, which is attached hereto as Exhibit "A", is hereby approved. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of May, 2009. Cnti A -- ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary o:\wdox\scchas\o112\c9os\MmrC/PAL\R9s19c1a .DOC/rmc W I,, - „gin N a g tr 321,e19,000 2 1@= 514,311256 !! 8 8 m N N 8 8» N ifr- b y} "> Hi ?fina E "a n C_ n E o E pp C pp C d pp S. 2 71 i » A pp S N pp § $ N Q E a ❑ E g A g A # 55,016,552 p E p §. p §.. § § .i § 8 p §.. p S p § p E : p E N I x'. Ia p y FY 2000 g O g pN s€ ' coN o N o N o e o e R p oe N 33ari4UaZte, 'As'. Preliminary erogneergo to establish alignment and ROW requirements. PSEE . Construction of Railroad overpass. Protective ROW purchase !Design, purchase ri9Mof-way all construct A- lone MM divided adena! COMur preliminary engineering, develop right of way map all acquire ROW for Annie! C at the intersection of RM 620 all Deepwmod Dile e3 Acquire ROW kr highway relocation and rendCity utilities. PreliminarY and Mal PS.AE. Construction of MAD 4. e ga 8 A E II a d Cossbuct Frontage road wllefordisbibfor and replace Hestefs Crossing Budge Construct railroad grade separation Design aro construct traffic signals F A a o iA 3 i 68 i A a SB` $$ a 5 n I I8 Design all contra MAD 4 F1 iie 5a° 10a 1&i 11411 Sino Design MAD - Design MAD Design intersection Improvements including tuns lanes, signal improvements and pedeshia, acmmpdaMns 4 1 1 o LP d Design MAD 4 Includes reconstruction of Main Street, extension P Blair Stre&, all the realignment of RR Avenue onto Liberty. Also Includes traffic signals at the new RR Avenue - Liberty- BIM IMerserArn, Liberty and N. Mayo, and Mar Street all Mays. Creates a Town Green' where RR Avenue currently exists between Liberty all Nava. From Joe DIMaggo Boulevard to 1000 feet south of US 79 From OM Sellers Boulevard to approvingery Jefferey Way From RM 020 to Sam Bass Rd From FM 1460 to CR 122 900 forth of US79 to OM Settler's Blvd. from Westinghouse Road to FM 1431 IH 35 ® Hestefs Crossing I3 t n R g 2 j From FM 1460 to CR 195 From RM 620 to BrgMwater Boulevard e F, 2 ? n : C 1 s l $ Chandler Creek Mbuary to Cypress Cove (includes bridge) Cypress Boulevard to Arterial M co y$ 6 From Arterial M to the nosh IH -35 nonage road Cypress Cove eMeaon to Parma Chisholm Trail to Creekbend Boulevard From Louis Henna to the southern ETJ Male Street, from Hams to N. Mays; Liberty, from Round Rock Avenue to Bunk Street; Slag Street. hon Main Street to Liberty. ¢ a V ¢ _ A O FM I46WAW Grimes IH 35 Area Improvements IH 35 Fontan Rd GD and Heste's Crossing Binge Repbcaa'rit RM 620 HS 79 g g i o 1 7 Y 9 1 IUS 79 at North Mays h Arterial M (Mill w� !South Mays at Gana School Road IAderial M 1µ3j FM 3406 Rous Rock Avenue reatgnMem ce o . re o . rt o. k {\ f ■ | . ■ ! / ƒ{ � ƒ } /( #R } - •R!!r§§ ! .; 5";;» .- g ■ • 4 ; t ; z = # •;` E;R#§ ! rR _ ! !, ^ | \ :w,!§! „ , - SO $14,261 ° & \/ \§ - -. -! MENT CORPORA' EiNmrkd §° ! & ■ . ;8 . • « } « '"\ • ; K§< i , - ! § ■ \ & IL) RUCK IRANSPORTATION SYSTEM DEVELOP mum amslpl— Oman ais \ / { / / ! / § / / { 8 8 | { 8 | ! 1 A \ Construct frontage road turnarounds 8 i ) \ § \ ] \ Construct ba8 of a Llan divided roadway Assist City in interagency coordination for SH 45 Construct 2 -lane divided roadway ) ] !| / !| Realign streets. widen streets, extend streets Construct and implement coordinated traffic r sgnal systems Reconstruct highway to a Ian divided highway Acquire ROW for SH /5 . : COMPLETED PROJECTS From Double Creek Drive to 800' West of Forest Rage Subdivision From Gads School Rd to MKT ROW From US 2910 Louis Henna BIM From Louis Henna Blvd to IH 35 Frontage ROad / | ' ) ; : / ( From TeravMa to Chandler Road From IH -35 tOOakmont Drive [ 1 \ From Gattis Spool Road to CR 123 From CR 123 to US 79 South Mays Street. DNI Way, Gats Sdad Road Eamon & Oetway/Boardwalk Connection § | ! ] / From CR 195 to CR 110 Round Rock East City Links to Round Rock West City Limits . % ! ! 'Double Creek Drive AW Grimm BIW (Ad¢nal B) \ IH 35 Turnarounds Feasibty Study Oakmont Drive (Artenal'S ) . | / ! Iliad Bud Lane (CR 122, Phases 1 & 2) Red Bud Lane (CR 122. Phase 3) 1/ f ! \ ! ; | DATE: May 7, 2009 SUBJECT: City Council Meeting — May 14, 2009 ITEM: 9G10. Consider a resolution approving the action of the Round Rock Transportation System Development Corporation in amending the Transportation Capital Improvement Program (TCIP). Department: Staff Person: Justification: Transportation Services Tom Word, Chief of Public Works Operations Public testimony is required prior to considering the following amendments to the TCIP: 1. Provide funding to reconstruct the traffic signal at US 79 and Sunrise Road in the amount of $220,000. 2. Provide funding in the amount of $4,108,000 to construct the Main Street extension, from the 11-1-35 northbound frontage road to Harris Street. 3. Provide funding in the amount of $9,100,273 for the realignment of Round Rock Avenue with Liberty Avenue; this project includes the connection of Blair Street, reconstruction of Main Street between Harris and Mays, and a traffic diverter at the intersection of Liberty Avenue and Burnett Street. 4. Provide funding in the amount of $486,000 to acquire a portion of the right-of-way for the Arterial C (Deepwood extension). 5. Provide funding in the amount of $392,000 for right-of-way reimbursement for Double Creek Drive. 6. Reduce funding by $496,000 for the US 79 at North Mays intersection improvement project. Funding: Cost: $13,810,273.00 Source of funds: 4B -Round Rock Transportation System Development Corporation Outside Resources: N/A Background Information: The TCIP is a multi-year spending plan for improvements to major roads and arterials in the City. Funding for this plan is provided through the 'A cent sales tax established for the purpose of transportation system improvements that support economic development. Public Comment: Public hearing held on May 14, 2009 by the Round Rock Transportation System Development Corporation.