R-09-05-14-9G10 - 5/14/2009RESOLUTION NO. R -09-05-14-9G10
WHEREAS, the Round Rock Transportation System Development
Corporation ("RRTSDC") has previously adopted a Transportation
Capital Improvement Plan ("Plan"), and
WHEREAS, the RRTSDC wishes to amend said Plan, and
WHEREAS, the bylaws of the RRTSDC require that said amendments
to the Plan be approved by the City Council, and
WHEREAS, the City Council wishes to approve said amendments to
the Plan, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the amendment to the Transportation Capital Improvement
Plan approved by the Round Rock Transportation System Development
Corporation, which is attached hereto as Exhibit "A", is hereby
approved.
The City Council hereby finds and declares that written notice
of the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to
the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered
and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 14th day of May, 2009.
Cnti A --
ALAN MCGRAW, Mayor
City of Round Rock, Texas
ATTEST:
SARA L. WHITE, City Secretary
o:\wdox\scchas\o112\c9os\MmrC/PAL\R9s19c1a .DOC/rmc
W
I,,
-
„gin
N
a
g
tr
321,e19,000
2
1@=
514,311256
!!
8
8
m
N
N
8
8»
N
ifr-
b
y} ">
Hi
?fina
E
"a
n
C_
n
E
o
E
pp
C
pp
C
d
pp
S.
2
71
i
»
A
pp
S
N
pp
§
$
N
Q
E
a
❑
E
g
A
g
A
#
55,016,552
p
E
p
§.
p
§..
§
§
.i
§
8
p
§..
p
S
p
§
p
E
:
p
E
N
I
x'.
Ia
p
y
FY 2000
g
O
g
pN
s€ '
coN
o
N
o
N
o
e
o
e
R
p
oe
N
33ari4UaZte, 'As'.
Preliminary erogneergo to establish alignment
and ROW requirements. PSEE . Construction
of Railroad overpass. Protective ROW purchase
!Design, purchase ri9Mof-way all construct A-
lone
MM divided adena!
COMur preliminary engineering, develop right of
way map all acquire ROW for Annie! C at the
intersection of RM 620 all Deepwmod Dile
e3
Acquire ROW kr highway relocation and
rendCity utilities. PreliminarY
and Mal PS.AE. Construction of MAD 4.
e
ga
8 A
E
II
a d
Cossbuct Frontage road wllefordisbibfor and
replace Hestefs Crossing Budge
Construct railroad grade separation
Design aro construct traffic signals
F
A
a
o
iA
3 i
68
i
A a
SB`
$$
a
5
n
I
I8
Design all contra MAD 4
F1
iie
5a°
10a
1&i
11411
Sino
Design MAD -
Design MAD
Design intersection Improvements including tuns
lanes, signal improvements and pedeshia,
acmmpdaMns
4
1
1
o
LP
d
Design MAD 4
Includes reconstruction of Main Street, extension
P Blair Stre&, all the realignment of RR
Avenue onto Liberty. Also Includes traffic signals
at the new RR Avenue - Liberty- BIM
IMerserArn, Liberty and N. Mayo, and Mar
Street all Mays. Creates a Town Green' where
RR Avenue currently exists between Liberty all
Nava.
From Joe DIMaggo Boulevard to 1000 feet south
of US 79
From OM Sellers Boulevard to approvingery
Jefferey Way
From RM 020 to Sam Bass Rd
From FM 1460 to CR 122
900 forth of US79 to OM Settler's Blvd.
from Westinghouse Road to FM 1431
IH 35 ® Hestefs Crossing
I3
t
n
R
g
2
j
From FM 1460 to CR 195
From RM 620 to BrgMwater Boulevard
e
F,
2
?
n
:
C
1
s
l
$
Chandler Creek Mbuary to Cypress Cove
(includes bridge)
Cypress Boulevard to Arterial M
co
y$
6
From Arterial M to the nosh IH -35 nonage road
Cypress Cove eMeaon to Parma
Chisholm Trail to Creekbend Boulevard
From Louis Henna to the southern ETJ
Male Street, from Hams to N. Mays; Liberty, from
Round Rock Avenue to Bunk Street; Slag Street.
hon Main Street to Liberty.
¢
a
V
¢
_
A
O
FM I46WAW Grimes
IH 35 Area Improvements
IH 35 Fontan Rd GD and Heste's Crossing
Binge Repbcaa'rit
RM 620
HS 79
g
g
i
o
1
7
Y
9
1
IUS 79 at North Mays
h
Arterial M (Mill
w�
!South Mays at Gana School Road
IAderial M 1µ3j
FM 3406
Rous Rock Avenue reatgnMem
ce
o .
re
o .
rt
o.
k
{\
f
■
|
.
■
!
/
ƒ{
� ƒ
}
/(
#R
}
-
•R!!r§§
! .;
5";;»
.-
g
■
•
4
;
t
;
z
=
#
•;`
E;R#§
!
rR
_
!
!,
^
|
\
:w,!§!
„
, -
SO
$14,261
°
&
\/
\§
- -.
-!
MENT CORPORA'
EiNmrkd
§°
!
&
■
.
;8
.
•
«
}
«
'"\
•
;
K§<
i
,
-
!
§ ■
\
&
IL) RUCK IRANSPORTATION SYSTEM DEVELOP
mum amslpl— Oman ais
\
/
{
/
/
!
/
§
/
/
{
8
8
|
{
8
|
!
1
A
\
Construct frontage road turnarounds
8
i
)
\
§
\
]
\
Construct ba8 of a Llan divided roadway
Assist City in interagency coordination for SH 45
Construct 2 -lane divided roadway
)
]
!|
/
!|
Realign streets. widen streets, extend streets
Construct and implement coordinated traffic r
sgnal systems
Reconstruct highway to a Ian divided highway
Acquire ROW for SH /5
.
:
COMPLETED PROJECTS
From Double Creek Drive to 800' West of Forest
Rage Subdivision
From Gads School Rd to MKT ROW
From US 2910 Louis Henna BIM
From Louis Henna Blvd to IH 35 Frontage ROad
/
|
'
)
;
:
/
(
From TeravMa to Chandler Road
From IH -35 tOOakmont Drive
[
1
\
From Gattis Spool Road to CR 123
From CR 123 to US 79
South Mays Street. DNI Way, Gats Sdad Road
Eamon & Oetway/Boardwalk Connection
§
|
!
]
/
From CR 195 to CR 110
Round Rock East City Links to Round Rock West
City Limits
.
%
!
!
'Double Creek Drive
AW Grimm BIW (Ad¢nal B)
\
IH 35 Turnarounds
Feasibty Study
Oakmont Drive (Artenal'S )
.
|
/
!
Iliad Bud Lane (CR 122, Phases 1 & 2)
Red Bud Lane (CR 122. Phase 3)
1/
f !
\ !
;
|
DATE: May 7, 2009
SUBJECT: City Council Meeting — May 14, 2009
ITEM: 9G10. Consider a resolution approving the action of the Round Rock Transportation
System Development Corporation in amending the Transportation Capital
Improvement Program (TCIP).
Department:
Staff Person:
Justification:
Transportation Services
Tom Word, Chief of Public Works Operations
Public testimony is required prior to considering the following amendments to the TCIP:
1. Provide funding to reconstruct the traffic signal at US 79 and Sunrise Road in the amount of
$220,000.
2. Provide funding in the amount of $4,108,000 to construct the Main Street extension, from the 11-1-35
northbound frontage road to Harris Street.
3. Provide funding in the amount of $9,100,273 for the realignment of Round Rock Avenue with Liberty
Avenue; this project includes the connection of Blair Street, reconstruction of Main Street between
Harris and Mays, and a traffic diverter at the intersection of Liberty Avenue and Burnett Street.
4. Provide funding in the amount of $486,000 to acquire a portion of the right-of-way for the Arterial C
(Deepwood extension).
5. Provide funding in the amount of $392,000 for right-of-way reimbursement for Double Creek Drive.
6. Reduce funding by $496,000 for the US 79 at North Mays intersection improvement project.
Funding:
Cost: $13,810,273.00
Source of funds: 4B -Round Rock Transportation System Development Corporation
Outside Resources: N/A
Background Information:
The TCIP is a multi-year spending plan for improvements to major roads and arterials in the City.
Funding for this plan is provided through the 'A cent sales tax established for the purpose of
transportation system improvements that support economic development.
Public Comment:
Public hearing held on May 14, 2009 by the Round Rock Transportation System Development
Corporation.