CM-2017-1519 - 10/27/2017Contract Quantity Adjustment/ Change Order
,N. o8nj
Department: Transportation
Project
Name: CORR SWDT Ph 58
City Project
ID Number SWDT5
Justification
Page I of 3
Date: 10/17/17
Change Order/Quantity
Adjustment No. 2
dded concrete walls at fire station, other walls added along Bagdad and Blair Street, and other Misc concrete additions.
SUMMARY
Amount % Change
Original Contract Price:
$4,315,214A0
Previous Quantity Adjustment(s):
$51,016.00
This Quantity Adjustment:
$32,972.00
Total Quantity Adjustment(s):
$83,988.00.
Total Contract Price with Quantity Adjustment(s):
$4,399,202.00
Previous Change Order(s):
$43,825.00 1%
This Change Order:
$6,940.00 0%
Total Change Order(s) To Date:
$50,765.00 1%
Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)
Plus Change Order(s)]:
$4,449,967.00
Difference between Original and Adjusted Contract Prices:
$134,753.00
Original Contract Time:
360
Calendar Days
Time Adjustment by previous Quan. Adj./Change Order:
0
Calendar Days
Time Adjustment by this Quan, Adj./Change Order:
0
Calendar Days
New Contract Time:
360
Calendar Days
Ibmitted for Appmval 4_ —
Prepared By: j
B.J. Cash, Cash Construction
10
Signature
Printed Name, Title, Company
Date
Approvals
Contractor; (
B.J. Cash, Cash Construction
VJ ilk l 1�
SlgrSture
Printed Name, Title, Company
Date
City Project
Manager: �-
Bill Stableinr Project Manager, CORR
IO —iii -L 7
_A
Signature
Mayor/Cityf"'!
Manaaer LI, s /1/ �/%r
Pri ted Name, Title �"�-'*5 r
�
T
ORR
Date
�
b - 21—M 1-7
—M
Page 2 of 3
Contract Quantity Adjustment/Change Order
Project Name: CORR SWDT Ph 5B
Quan. Adj./Change Order No.:
Change Order Data
Item # Item Description
Unit
Qty.
Unit Price
Amount
Contract
Time
Adjustment
p
140 Drilling & Dowelling at 12" on Center
LF
42
$17.50
$735.00
141 Reform Driveway Gravity Workspace
LS
1
$5,050.00
$5,050.00
142 Type E Ramp at McNeil and Bagdad
EA
1
$1,155.00
$1,155.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Page 3 of 3
Contract Quantity Adjustment/Change Order
Project Name: CORR SWDT Ph 58
Quan. Adj./Change Order No.: 2
Ouantitv Adjustment Data
- -
Bid Item #
Item Description
QtY.
Unit Price
Amount
Contract
Time
Adjustment
(Days)
init
Contract Adds
8-531-6042
Portland Cement ein orc Concrete Sidewalks to fl-
inch Thickness (as needed to match existing sidewalk
on-site for each address at ROW)
52
$85.00
$4,420.00
11-423-6015
um own Mortared RockLimestone Block (6"x6"x up to
24") Wall, with mortared joints up to 3 -feet tall,
including foundation, (measured square feet of face of
block) complete in place per square foot
SF
1025
$45.00
$46,125.00
9-529-6033
P.C. Reinforced Concrete Retainer Curb, Type A,
Including Tree Wells
LF
123
$75.00
$9,225.00
10-529-6033
Retainer Curb with o oc Limestone Block
(6"x6"xup to 24") Wall, with mortared joints up to 3 -
feet tall, including foundation, (measured square feet of
face of block) complete in place per square foot
LF
57
$86.00
$4,902.00
42
Installation of New Tree Well per Detail
EA
1
$1,300.00
$1,300.00
97
lacking or Boring 18" Steel Encasement Pipe, ASTM A-
252, Grade 2, including grouting
LF
-60
$550.00
-$33,000.00
$0.00
$0.00
$0.00
$0.00
$0.001
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
City of Round Rock
ROUND Roar
TEXAS Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 2 with Cash
Construction for the Southwest Downtown District Infrastructure
Improvements Phase 5B Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 10/27/2017
Dept Director: Gary D. Hudder, Transportation Director
Cost: $39,912.00
Indexes: RR Transportation and Economic Development Corporation (Type B)
Attachments: Change Order #2.pdf
Department: Transportation Department
Text of Legislative File CM -2017-1519
Consider executing Quantity AdjustmentlChange Order No. 2 with Cash Construction for
the Southwest Downtown District Infrastructure Improvements Phase 5B Project.
On January 12, 2017 City Council approved a contract with Cash Construction Company
for The Southwest Downtown Infrastructure Improvements Project - Phase 513 (SWDT-5B),
which is a continuation of the on-going downtown construction enhancements, was formally
accepted by the City in February 2005 as part of the Southwest Downtown Master Plan.
The SWDT-5B Project will improve and develop Bagdad Avenue, McNeil Road, Florence
Street, and Blair Street to provide residents with better access to adjoining businesses
and downtown Round Rock. This project includes improvements to water, wastewater,
stormwater, dry utility infrastructure, roadway, landscape and pedestrian facilities.
Change Order/Quantity Adjustment #1 consisted of waterline service size upgrades 4 -inch
to 6 -inch, additional electric cable, one additional storm drain, piping and grate. Waterline
relocation due to conflicts not shown in plans. Deducts include 4 -inch and 6 -inch waterline
piping, Jack and bore for steel encasement pipe and 10, 4 -inch gate valves. The total is
$94,981.00
Change Order/Quantity Adjustment # 2 is for additional concrete sidewalks, walls at the
City o4RoundRock Page f Printed on 4020/2017
Agenda Item Summary Continued iCM-2017-1619}
Fire Station #2. additional walls were needed on Blair Street in various locations due to
grade differences not accounted for in the original survey of the plans. Also included is
reforming the driveway at Gravity Workspace to accommodate the owners needs.
The Change Order amount is $6,940.00. The Quantity Adjustment amount is $32,972.00.
The total is $39,912.00.
Cost. $39,912.00
Source of Funds: RR Transportation and Economic Development Corporation
Cityof Round Rock Page 2 Printed on 1626MI7