Loading...
CM-2017-1518 - 10/27/20171?--l- mv, 41!16 Department: Project Name: City Project ID Number Vendor Justification Page I of 3 Contract Quantity Adjustment/ Change Order Transportation North Mays Right Turn bane at Meridian School Date: 10/16/17 Change Order/Quantity Adjustment No. 1 Smith Contracting Co. 15308 Ginger st, Austin, Tx 78728 512-990-7640 Company Name Address Phone No. Quantity Adjustment/Change Order No. 1 is the final quantity adjustment/change order to reflect actual project quantities for the project close out. These change order/quantity adjustments are the result of addition of primary electrical riser $2,634.00, relocation of illumination conduit $10,560.00, a 18" retaining wall for $9,418.58 as well as multi colored directional arrows on the new driveway for $412.50. Change order totals $22,755.08. There were also deductions found during the project's completion, capital improvement sign -$700.00, 2" sdr 40 conduit -$5,390.00, silt fence -$196.00, 2" type C HMAC surface course -$8,920.80, non traffic rated pull box -$6,500.00, and two 3:1 concrete headwalls -$5,000.00. One addition to the quantity adjustment HMAC Type B $14,150.25. Total deduction $12,556.05 This QA/CO #1 totals $10,198.53. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Amount $249,819.60if 90 Days 0 0 0 -$12,556.55. -$12,556.55 $237,263.051 $22,755.08 $22,755.08 $260,018.13 $10,198.53 Change 0% 10% 10% Prepared By: Randy Crum, Project Manager, Cky Of Round Rock 10/16/17 Signature Printed Name, Title, Company Date - - Approvals r Contractor: Signature Hardin Camp II VP, Smith Contracting Co. Inc. 10/16/2017 City Project Manager: Randy Crum, Project Manager, City Of Round Rock 10/16/17 Signature Printed Name, Title Date Mayor/City Manager �j� B j'OOK-� �C4 1 S4- � �• 1-7 Sig ure N[.. Z('> f -7 -- �S (� Printed Name, Title Date Contract Quantity Adjustment/ Change Order wuuuo Ro6c ex. Project Name: North Mays Right Tum Lane at Meridian School Quan. Adj./Change Order No.: Chance Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment f Davs) 1 Primary Electrical Riser 6" SDR 80 LF 80 $29.55 $2,364.00 2 2" SDR 40 conduit LF 600 $17.60 $10,560.00 3 18" Retaining Wall 6" Thick LF 155 $60.77 $9,418.58 4 Colored Arrows In Main Drive of Meri ian School FA 3 $137.50 $412.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.001 $0.00 $0.00 $0.00 $0.00 $0.001 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/ Change Order . -Pr- Project Name: North Mays Right Turn Lane at Meridian School Quan. Adj./Change Order No.: Quantity Adiustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 2 Capital Improvement Sign FAL -1 $700.00 -$700.00 29 2" PVC Conduit SDR 40 LF -77 $70.00 -$5,390.00 4 Silt Fence LF -98 $2.00 -$196.00 10 2" Type C Hmac Surface Course TN -74.34 $120.00 -$8,920.80 18 Non Traffic Rated Pull Box EA -1 $6,500.00 -$6,500.00 33 3:1 Concrete Headwall EA -2 $2,500.00 -$5,000.00 9 HMAC Base Course Type B TN 1 148.95 $95.00 $14,150.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -$12,556.55 0 City of Round Rock ROU ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Smith Contracting Company for the North Mays Right Turn Lane at Meridian School Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/27/2017 Dept Director: Gary D. Hudder, Transportation Director Cost: $10,198.53 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Revised C-O.pdf Department: Transportation Department Text of Legislative File CM -2017-1518 Consider executing Quantity Adjustment/Change Order No. 1 with Smith Contracting Company for the North Mays Right Turn Lane at Meridian School Project. As part of the plan to keep the community safe and increase mobility, the City of Round Rock City Council approved the North Mays Right Turn Lane at Meridian School on June 8th 2017 to Smith Contracting. This project includes the construction of an exclusive right turn lane consisting of: asphalt pavement, curb & gutter, concrete sidewalk, concrete driveway reconstruction, pavement markings, signage, storm sewer extension, and grading. Quantity Adjustment/Change Order No. 1 is the final quantity adjustment/change order to reflect actual project quantities for the project close out. These change order/quantity adjustments are the result of addition of primary electrical riser $2,364.00, relocation of illumination conduit $10,560.00, a 18" retaining wall for $9,418.58 as well as multi colored directional arrows on the new driveway for $412.50. Change order totals $22,755.08. There were also deductions found during the project's completion, capital improvement sign -$700.00, 2" sdr 40 conduit -$5,390.00, silt fence -$196.00, 2" type C HMAC surface course -$8,920.80, non traffic rated pull box -$6,500.00, and two 3:1 concrete headwalls -$5,000.00. One addition to the quantity adjustment HMAC Type B $14,150.25. Total deduction $12,556.55 This QAICO #1 totals $10,198.53. City of Round Rock Page f Printed on 10/26/2017 Agenda Mom Summary Condnued CAf-2017-1518 Cost: $10,198.53 Source of Funds: RR Transportation and Economic Development Corporation C11y of Round Rack Page 2 Printed on 10/20/2017