R-09-06-25-11C1 - 6/25/2009RESOLUTION NO. R -09-06-25-11C1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with RGM Constructors, L.P. for the Gattis School Roadway Improvements Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 4, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Contract Change Order No. 4 to the Contract with RGM Constructors, L.P. for the Gattis School Roadway Improvements Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 25th day of June, 2009. ALAN MCGRAW, Mayor ATTEST: ^ City of Round Rock, Texas L. WHITE, City Secretary O:\wdax\SCC1nts\0112\0905\MUNICIPAL\R90625C1.DOC/rmc CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 1 of 3 DEPARTMENT: Transportation Services DATE: 5/12/2009 PROJECT: Gattis School Road ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDER: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: TOTAL CONTRACT TO DATE ITEM # DESCRIPTION OF CHANGES 210 FLEX BASE - PER CUBIC YARD 315 TRANSITION MILLING - PER SQUARE YARD HUI MIA AI'HALI UUNUHt I t NAVtMtN I (IY 340 B)(PG 64-22) - PER TON $2,741,843.54 $269,924.00 ($300,339.84) ($30,415.84) $2,711,427.70 CHANGE DATA UNIT CY SY QTY. CHANGE ORDER NO: 4 JUSTIFICATION: FINAL QUANTITIY ADJUSTMENTS UNIT PRICE AMOUNT -100 $38.00 ($3,800.00) 573 $25.00 $14,325.00 TON -259.54 $80.00 ($20,763.20) HOT MIX ASPHALT CONCRETE PAVEMENT (TY 340 C)(PG 70-22) - PER TON TON -190.97 $90.00 ($17,187.30) HOT MIX ASPHALT CONCRETE PAVEMENT (TY 340 C)(LEVEL UP)(PG 70-22) - PER TON TON -6.88 $130.00 ($894.40) HOT MIX ASPHALT CONCRETE PAVEMENT (TY 340 C)(PV 32 SURF)(PG 76-22) - PER TON TON -1097.98 $90.00 ($98,818.20) P.C. CONCRETE DRIVEWAYS - PER SQUARE 433 FOOT SF 156 $5.00 $780.00 4 INCH P.C. CONCRETE MEDIANS AND ISLANDS 434 - PER SQUARE FOOT SF -9 $3.00 ($27.00) 510 RC PIPE (CL III) (18") - PER LINEAR FOOT LF 26 $85.00 $2,210.00 551 PIPE UNDERDRAINS (6") - PER LINEAR FOOT LF -400 $35.00 ($14,000.00) 591 CONCRETE RIPRAP (5") - PER SQUARE YARD SY -68.25 $100.00 ($6,825.00) BERMUDA MULCH SODDING - PER SQUARE 602 YARD SY -10545 $4.75 ($50,088.75) NATIVE SEEDING FOR EROSION CONTROL 604 METHOD - PER SQUARE YARD SY 2500 $0.50 $1,250.00 620 FILTER FIBER - PER SQUARE YARD SY -44 $7.00 ($308.00) FILTER CURB INLET PROTECTION (EXISTING 628 INLET) - PER EACH EA 5 $60.00 $300.00 TRAFFIC SIGNAL CONDUIT 2 -INCH - PER 835 LINEAR FOOT LF 54 $7.50 $405.00 TRAFFIC SIGNAL CONDUIT 2 -INCH (BORE) - 835 PER LINEAR FOOT LF -192 $48.00 ($9,216.00) TRAFFIC SIGNAL CONDUIT 3 -INCH - PER 835 LINEAR FOOT LF -170 $11.00 ($1,870.00) TRAFFIC SIGNAL CONDUIT 3 -INCH (BORE) - 835 PER LINEAR FOOT LF -444 $90.00 ($39,960.00) 863 REFL PAV MRKR (TY I -C) - PER EACH EA -49 $4.00 ($196.00) WRK ZN PAV MRK (REMOV) (W) (4") (BRK) - 870 PER LINEAR FOOT LF 460 $0.80 $368.00 REFL TY I THERMO PAV MRK (W) (4") (BRK) - 871 PER LINEAR FOOT LF -480 $0.33 ($158.40) REFL TY I THERMO PAV MRK (W) (8") (SLD) - 871 PER LINEAR FOOT LF -523 $0.65 ($339.95) REFL TY I THERMO PAV MRK (Y) (4") (SLD) - 871 PER LINEAR FOOT LF -2636 $0.33 ($869.88) REFL TY I THERMO PAV MRK (W) (ARROW) - 871 PER EACH EA -11$80.00 ($880.00) REFL TY I THERMO PAV MRK (W) (WORD) - 871 PER EACH EA -11 $110.00 ($1,210.00) Page 1 of 2 ADDED DAYS CALENDAR DAYS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Transportation Services PROJECT: Gattis School Road ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDER: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: TOTAL CONTRACT TO DATE ITEM # 871 871 871 871 871 871 315 340 340 340 551 608 628 863 870 871 871 DESCRIPTION OF CHANGES REFL TY 11 THERMO PAV MRK (W) (4") (BRK) - PER LINEAR FOOT REFL TY II THERMO PAV MRK (W) (4') (DOT) - PER LINEAR FOOT REFL TY II THERMO PAV MRK (W) (8") (SLD) - PER LINEAR FOOT REFL TY II THERMO PAV MRK (Y) (4") (SLD) - PER LINEAR FOOT REFL TY 11 THERMO PAV MRK (W) (ARROW) - PER EACH REFL TY II THERMO PAV MRK (W) (WORD) - PER EACH TRANSITION MILLING - PER SQUARE YARD HOT MIX ASPHALT CONCRETE PAVEMENT (TY B)(PG 64-22) - PER TON HOT MIX ASPHALT CONCRETE PAVEMENT (TY C)(PG 76-22) - PER TON HOT MIX ASPHALT CONCRETE PAVEMENT (TY C)(PV 32 SURF)(PG 76-22) - PER TON PIPE UNDERDRAINS (6') - PER LINEAR FOOT PLANTING - PER EACH FILTER CURB INLET PROTECTION (EXISTING INLET) - PER EACH REFL PAV MRKR (TY II -A -A) - PER EACH WRK ZN PAV MRK (REMOV) (W) (4") (BRK) - PER LINEAR FOOT REFL TY 1 THERMO PAV MRK (Y) (4') (SLD) - PER LINEAR FOOT REFL TY I THERMo PAV MRK (Y) (12") (SLD) - PER LINEAR FOOT $2,741,843.54 $269,924.00 ($300,339.84) ($30,415.84) $2,711,427.70 CHANGE DATA UNIT LF LF LF LF EA EA SY TON TON TON LF EA EA EA LF LF LF QTY. -180 -14 -573 -230 -2 -2 -117 -0.87 -229.86 -256.79 -10 -2 -4 -5 580 -9 -21 Page 1 of 3 DATE: 5/12/2009 CHANGE ORDER NO: 4 JUSTIFICATION: FINAL QUANTITIY ADJUSTMENTS UNIT PRICE $0.17 $0.48 $0.33 $0.17 $23.00 $30.00 $38.00 $90.00 $95.00 $95.00 $85.00 $300.00 $60.00 $4.50 $0.58 $0.60 $2.70 AMOUNT ($30.60) ($6.72) ($189.09) ($39.10) ($46.00) ($60.00) ($4,446.00) ($78.30) ($21,836.70) ($24,395.05) ($850.00) ($600.00) ($240.00) ($22.50) $336.40 ($5.40) ($56.70) ADDED DAYS CALENDAR DAYS PREPARED BY: SIGN U EN EER) -41 V� 'y,. SIGNATURE (CONTRACTOR) DATE 5/12/2009 PRINTED NAME: Robert Allison TITLE: Vice President DATE APPROVED: CITY OF ROUND ROCK DATE JUSTIFICATION: 1 Per the City of Round Rock, RGM as Required Page 2 of 2 TOTAL: ($300,339.84) 0 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER.: PREVIOUS CHANGE ORDER: TOTAL % CHANGE ORDER: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDER: ($300,339.84) $269,924.00 -1.11% $2,711,427.70 DATE: June 18, 2009 SUBJECT: City Council Meeting —June 25, 2009 ITEM: 11C1. Consider a resolution authorizing the Mayor to execute Change Order No. 4 for quantity adjustments with RGM Constructors, L.P. for the Gattis School Road Project. Department: Staff Person: Transportation Services Tom Word, P.E., Chief of Public Works Operations Justification: Change Order No. 4 is for the final adjustment in quantities for the Gattis School Road Project. Funding: Cost: -$300,339.84 Source of funds: 2002 General Obligation Bonds Amount % Change Original Contract 2,741,843.54 N/A Previous Change Orders 269,924.00 9.84 Change Order #4 -300,339.84 -10.95 Revised Contract 2,711,427.70 -1.11 Outside Resources: RGM Constructors, L.P. Huggins/Seiler & Associates, L.P. Background Information: The original contract was awarded by City Council at the August 9, 2007 council meeting (R -07-08-09- 8A1) for the widening of Gattis School Road, Windy Park Drive to the east property line of the Randall's Town Center subdivision. The construction added a raised median to create a five -lane urban section with left and right turn lanes at A.W Grimes Boulevard. The project also widened Gattis School Road in the vicinity of Surrey Street and Via Sonoma Drive to create left turn lanes from Gattis School Road. Previous change orders included installation of a bypass waterline, installation of a concrete cap over a 16" waterline and installation of a wet connection from an existing 2" waterline to a 16" waterline. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Transportation Services PROJECT: Gattis School Road ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDER: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: TOTAL CONTRACT TO DATE ITEM # 210 315 340 340 DESCRIPTION OF CHANGES FLEX BASE - PER CUBIC YARD TRANSITION MILLING - PER SQUARE YARD HVI MIX ASI-'HALI UONL;Ht I t NAVtMtN I (IY B)(PG 64-22) - PER TON HOT MIX ASPHALT CONCRETE PAVEMENT (TY C)(PG 70-22) - PER TON HOT MIX ASPHALT CONCRETE PAVEMENT (TY 340 C)(LEVEL UP)(PG 70-22) - PER TON HOT MIX ASPHALT CONCRETE PAVEMENT (TY 340 C)(PV 32 SURF)(PG 76-22) - PER TON P.C. CONCRETE DRIVEWAYS • PER SQUARE 433 FOOT 4 INCH P.C. CONCRETE MEDIANS AND ISLANDS 434 - PER SQUARE FOOT 510 RC PIPE (CL III) (18') - PER LINEAR FOOT 551 PIPE UNDERDRAINS (6") - PER LINEAR FOOT 591 CONCRETE RIPRAP (5") - PER SQUARE YARD BERMUDA MULCH SODDING - PER SQUARE 602 YARD NATIVE SEEDING FOR EROSION CONTROL 604 METHOD - PER SQUARE YARD 620 FILTER FIBER - PER SQUARE YARD FILTER CURB INLET PROTECTION (EXISTING 628 INLET) - PER EACH TRAFFIC SIGNAL CONDUIT 2 -INCH - PER 835 LINEAR FOOT TRAFFIC SIGNAL CONDUIT 2 -INCH (BORE) - 835 PER LINEAR FOOT TRAFFIC SIGNAL CONDUIT 3 -INCH - PER 835 LINEAR FOOT TRAFFIC SIGNAL CONDUIT 3 -INCH (BORE) - 835 PER LINEAR FOOT 863 REFL PAV MRKR (TY I -C) - PER EACH WRK ZN PAV MRK (REMOV) (W) (4') (BRK) - 870 PER LINEAR FOOT REFL TY I THERMO PAV MRK (W) (4') (BRK) - 871 PER LINEAR FOOT REFL TY I THERMO PAV MRK (W) (8") (SLD) - 871 PER LINEAR FOOT REFL TY I THERMO PAV MRK (Y) (4") (SLD) - 871 PER LINEAR FOOT REFL TY I THERMO PAV MRK (W) (ARROW) - 871 PER EACH REFL TY I THERMO PAV MRK (W) (WORD) - 871 PER EACH $2,741,843.54 $269,924.00 ($300,339.84) ($30,415.84) $2,711,427.70 CHANGE DATA UNIT CY SY TON TON TON TON SF SF LF LF SY SY SY SY EA LF LF LF LF EA LF LF LF LF EA EA -2 -1 -1 -6 2 -2 Page 1 of 3 DATE: 5/12/2009 CHANGE ORDER NO: 4 JUSTIFICATION: FINAL QUANTITIY ADJUSTMENTS Page 1 of 2 iTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR DAYS 100 $38.00 ($3,800.00) 573 $25.00 $14,325.00 59.54 $80.00 ($20,763.20) 30.97 $90.00 ($17,187.30) 5.88 $130.00 ($894.40) 97.98 $90.00 ($98,818.20) 156 $5.00 $780.00 -9 $3.00 ($27.00) 26 $85.00 $2,210.00 400 $35.00 ($14,000.00) 8.25 $100.00 ($6,825.00) )545 $4.75 ($50,088.75) 500 $0.50 $1,250.00 44 $7.00 ($308.00) 5 $60.00 $300.00 54 $7.50 $405.00 192 $48.00 ($9,216.00) 170 $11.00 ($1,870.00) 144 $90.00 ($39,960.00) 49 $4.00 ($196.00) 60 $0.80 $368.00 180 $0.33 ($158.40) 123 $0.65 ($339.95) 536 $0.33 ($869.88) 11 $80.00 ($880.00) 11 $110.00 ($1,210.00) Page 1 of 2 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Transportation Services PROJECT: Gattis School Road ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDER: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: TOTAL CONTRACT TO DATE ITEM # 871 871 871 871 871 871 315 340 340 340 551 608 628 863 870 871 871 DESCRIPTION OF CHANGES REFL TY II THERMO PAV MRK (W) (4") (BRK) - PER LINEAR FOOT REFL TY II THERMO PAV MRK (W) (4") (DOT) - PER LINEAR FOOT REFL TY 11 THERMO PAV MRK (W) (8") (SLD) - PER LINEAR FOOT REFL TY II THERMO PAV MRK (Y) (4') (SLD) - PER LINEAR FOOT REFL TY II THERMO PAV MRK (W) (ARROW) - PER EACH REFL TY II THERMO PAV MRK (W) (WORD) - PER EACH TRANSITION MILLING - PER SQUARE YARD HOT MIX ASPHALT CONCRETE PAVEMENT (TY B)(PG 64-22) - PER TON HOT MIX ASPHALT CONCRETE PAVEMENT (TY C)(PG 76-22) - PER TON HOT MIX ASPHALT CONCRETE PAVEMENT (TY C)(PV 32 SURF)(PG 76-22) - PER TON PIPE UNDERDRAINS (6") - PER LINEAR FOOT PLANTING - PER EACH FILTER CURB INLET PROTECTION (EXISTING INLET) - PER EACH REFL PAV MRKR (TY II -A -A) - PER EACH WRK ZN PAV MRK (REMOV) (W) (4') (BRK) - PER LINEAR FOOT REFL TY I THERMO PAV MRK (Y) (4") (SLD) - PER LINEAR FOOT REFL TY I THERMo PAV MRK (Y) (12') (SLD) - PER LINEAR FOOT $2,741,843.54 $269,924.00 ($300,339.84) (330,415.84) $2,711,427.70 CHANGE DATA UNIT LF LF LF LF EA EA SY TON TON TON LF EA EA EA LF LF LF QTY. -180 -14 -573 -230 -2 -2 -117 -0.87 -229.86 -256.79 -10 -2 -4 -5 580 -9 -21 Page DATE: CHANGE ORDER NO: JUSTIFICATION: 1 of 3 5/12/2009 4 FINAL QUANTITIY ADJUSTMENTS UNIT PRICE $0.17 $0.48 $0.33 $0.17 $23.00 $30.00 $38.00 $90.00 $95.00 $95.00 $85.00 $300.00 $60.00 $4.50 $0.58 $0.60 $2.70 AMOUNT ($30.60) ($6.72) ($189.09) ($39.10) ($46.00) ($60.00) ($4,446.00) ($78.30) ($21,836.70) ($24,395.05) ($850.00) ($600.00) ($240.00) ($22.50) $336.40 ($5.40) ($56.70) ADDED DAYS CALENDAR DAYS PREPARED BY: SIGNATI�RE GI R) v� i� SIGNATURE (CONTRACTOR) CD -11-09 DATE 5/12/2009 PRINTED NAME: Robert Allison DATE TITLE: Vice President CI CITY OF ROUND ROC DATE APPROVED: JUSTIFICATION: 1 Per the City of Round Rock, RGM as Required Page 2 of 2 TOTAL: ($300,339.84) 0 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER.: PREVIOUS CHANGE ORDER: TOTAL % CHANGE ORDER: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDER: ($300,339.84) $269,924.00 -1.11% $2,711,427.70