R-09-07-09-9C2 - 7/9/2009RESOLUTION NO. R -09-07-09-9C2
WHEREAS, the Round Rock Transportation System Development
Corporation ("RRTSDC") has previously adopted a Transportation
Capital Improvement Plan ("Plan"), and
WHEREAS, the RRTSDC wishes to amend said Plan, and
WHEREAS, the bylaws of the RRTSDC require that said amendments
to the Plan be approved by the City Council, and
WHEREAS, the City Council wishes to approve said amendments to
the Plan, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the amendment to the Transportation Capital Improvement
Plan approved by the Round Rock Transportation System Development
Corporation, which is attached hereto as Exhibit "A", is hereby
approved.
The City Council hereby finds and declares that written notice
of the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to
the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered
and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 9th day of July, 2009.
Ce Yr,
ALAN MCGRAW, Mayor
City of Round Rock, Texas
SARA L. WHITE, City Secretary
0:\wdox\SCC1nt5\0112\0905\MUNICIPAL\R90709C2.DOC/rmc
tabbies'
m
- x
03
AW Grimes Boutevard
FM 3406
3
..
v
South Mays at Gants School Road
Cypress Cove Extension
3
b
3
IUS 79 at North Mays
Red Bud Lane Phase 4
Wyoming Springs Drive
Transportation Consulting
IUS 79
3
ET m
a
RM 820
IH 35 Frontage Rd C -D and Hester's Crossing
Bndge Replacement
IH 35 Area Improvements
FM 1460/AW Grimes
Old Settler's Blvd./Kronen Road (CR 113)
n
Project Name
From Louis Henna to the southern ETJ
Chisholm Trail to Creekbend Boulevard
Cypress Cove extension to Palome
From Arterial M to the north IH -35 frontage road
0
o
Cypress Boulevard to Arterial M
Chandler Creek Tributary to Cypress Cove
(includes bridge)
University Boulevard to Chandler Creek tributary
1000 feet In all direction. of intersection
From CR 123 to Woodland Loop
From RM 620 to Brightwater Boulevard
From FM 1460 to CR 195
a
At Union Pacific Railroad
0
0
u
3
m
7J
o
900' North of US7910 Old Settler's Blvd.
From FM 1480 to CR 122
From RM 620 to Sam Bass Rd
From Old Settlers Boulevard to approximately
Jeflerey Way
From Joe DlMaggio Boulevard to 1000 feet south
of US 79
Project Limits
Design MAD 4
Design MAD 4
Design MAD 4
Design MAD 4
Design intersection Improvements Including turns
lanes, signal Improvements and pedestrian
accomodanons
3
v
Design MAD 4
Design MAD 4
Design Intersection improvements including dual
len turns for all approaches, signal improvements
end pedestrian accomodations
Design and construct MAD 4
Construct hall 01 a 4 -lane divided roadway
Miscellaneous consulting work In support of
transportation programs and planning
Construct 4 -lane divided highway
Design and construct traffic signals
Construct railroad grade separation
Construct Frontage road collector -distributor and
replace Hester's Crossing Bridge
,Relocate ramps, widen frontage road, and
construct frontage road turnaround
Acquire ROW for highway relocation and relocate
City utilities. Preliminary engineering and final
P,S.BE. Construction of MAD 4.
Design, purchase right-of-way and construct 4 -
lane divided arterial
Conduct preliminary engineering, develop right of
way map and acquire ROW for Arterial C at the
Intersection o1 RM 620 and Deepwood Drive
Design, purchase right-of-way and construct 4 -
lane divided arterial
Preliminary engineering to establish alignment
and ROW requirements. P.S,B E. Construction
of Railroad overpass. Protective ROW purchase
Work Description
0
a
0
a
o
Spring 2010
Spring 2010
a
a
m
_
o
m
o
Spring 2009
p
?
p
m
<
m
Spring 2007
v
m
8
N
s
_
Summer 2008
1,,111 vvrSrWM/111vry
EstimQed Prior Corporation Additional _
Construction Date Corporation Other Funding Total Cost Funding•
Corporation
Funding Amendment 924 .Funding This.
0
0
01
41
0
0
0
5711,000 1
0
o
n
v�
o8
o
a
a
US
s
o
8
0
CO
0
VI
0
0
0
o
o
a
o
51135,895 b
51,000.000 d
$212,352 e
0
o
o
c
y•
0
0
�
0
u
0
0
c
0
0
_
0
0
o
r.r
_
N
-01 oOa
_
o
511,000.000
02
_
o
rn
w
mt.
a
N o
8 c 8
N o 0
m
o
0
o
o
0
Co
m
0
a
�
7
"a
g
'a
s
2
Z
c
z_
C
2
D
z
D
r
3
t
z
c
R
3
R
2
C-;
-t
c
3
m
0
steefold tuam3 letoi
Downtown Storm Sewer Project 7 IBlalr Street, from Main to Florence Street
Round Rock Avenue/Uberty Avenue realignment
Project 5
Main Street Project 4
Main Street Project 3
Main Street Project 2
Main Street Project 1
-0 ,
F.
Liberty Avenue, from Round Rock Avenue to Mays
Street.
0
Main Street, Brown to Blair Street
Main Street, San Saba to Brown Street
Main Street extension, IH 35 to San Saba
9.
0
ET
m
a'
e
3.. -..
..7" 8
Design the realignment of RR Avenue onto
Liberty Avenue; Includes the design of a signal at
the Liberty/Mays Intersection
Design Main Sired how= Blair and Mays, includes
the design of a signal el the Mays/Mein intersection
Design and conslrucl Main Street In match new
construction in SWDT.
Design and construct Main Street to match new
construction in SWDT.
Design the extension of Main Street over lake Creek
—
to the IH -35 frontage road-. includes the purchase of
necessary right-of-way
WorkDescription
R 3
-
g9
yk
P
Spring 2010
Summer 2010
41
N
4
Construction Date
3
-
3
o
5748,00
Oo
0
0
Estimated
Corporation
Funding
0
0
0
0
0
0
0
Prior Corporation Additional
Other Funding Total Cost Funding Corporation
Amendment 424 Funding This
Amanelmon. arc
_
0
51,200,000
O
o
o
0
0
0
5210,000
8
8
8
0
0
--1
Z
N
0
D
0
Z
0
D
0
m
m
z
co
w
0
0
3
w
S
C
m
'Traffic Signal Coordination
Red Bud Lane (CR 122, Phase 3)
South Mays Street Improvements
Prime Strategies
Red Bud Lane (CR 122, Phases 1 8 2)
D
-4
IM 35 Turnarounds
Feasibility Study
Oakmont Drive (Arterial "S")
Teravista
AW Grimes Blvd (Arterial B)
Greenlawn Extension
'Double Creek Drive
Project Name Project Limits
COMPLETED PROJECTS
Forest Creek From Double Creek Drive to 800' West of Forest
Ridge Subdivision
Round Rock East City Limits to Round Rock West
City Limits
From CR 195 to CR 110
FM 1325/Louis Henna McNeil/IH 35/RM 620 US 79
South Mays Street, Dell Way, Gattis School Road
Extension 8 Dellway/Boardwalk Connection
T
3
0
71
C
U
Z14
T
3
0
=
c
M=
_
0C
.T
(From University Blvd to CR 112
',From IH -35 to Oakmont Drive
From Teravista to Chandler Road
gn
P
3
0.
U
FM 1325/Louis Henna/Nester's Crossing
From Louis Henna Blvd to IH 35 Frontage Road
T
3
C
U
x
mT.
n
From Ganis School Rd to MKT ROW
Total Completed Projects
Acquire ROW for SH 45
Reconstruct highway to 4 lane divided highway
Construct and Implement coordinated traffic
signal systems
P58 E Design services; Construct 5 -lane section,
,Bridge, Railroad crossing
Realign streets, widen streets, extend streets
Construct 2 -lane divided roadway
Assist City In Interagency coordination for SH 45
Construct half o1 a 4 -lane divided roadway
2
n
9
a
S.
n
D
=
Construct frontage road turnarounds
!Construct 4 lane divided arterial
I
I
Fg
^y .1
t
n
3
Completed
0
3
n
Completed
Completed
0
3
o
0
3
m
-
o
E.
U
Fall 2005
z
0
3
n
Completed
o
3
n
0
3
n
0
3
n
r• v r 171,111 vvnrvn/11 IVII
Estimated Prior Corporation Additional
Construction Date Corporation Other Funding Total Cost Funding .Corporation
Funding Amendment 924 Funding This -
tn
LIS
N
N
N
v
C N
0 m
w
m
N
m
w
N
m
N
N
N
N
A
1,3
.I°
m
N
O
0
o
0o
0 0
in
-
U a
o
53,175,000 a
5328,000 c
aw
p w
51,962,701 b
0140 AAA
$1,313,217 e
+ w
r.
t!
i0
N
v
O
N
V
5242,635,322
526,000,00
to
-
op a
N.
5617,363
52,731,442
54,741,735
a
:.
N
O
a
N
a
ro
_
u
rt
51,249,59
to
Ci
ip
-
w
56,708,562
5328,000
61 -
0 o
ID
a
am
03
e
N+
�n
t0
N
O
O
0
N
O
u
DATE: July 1, 2009
SUBJECT: City Council Meeting — July 9, 2009
ITEM: 9C2. Consider a resolution approving the action of the Round Rock Transportation
System Development Corporation in amending the Transportation Capital
Improvement Program (TCIP).
Department:
Staff Person:
Justification:
Transportation Services
Tom Word, Chief of Public Works
Public testimony is required prior to considering the following amendments to the TCIP (please
reference the attached map for project locations):
A. Provide funding for Project 1 in the amount of $4,100,000 to design the Main Street
extension between the IH -35 north frontage road and San Saba.
B. Provide funding for Project 2 in the amount of $2,800,000 to design and construct Main
Street between San Saba and Brown Street.
C. Provide funding for Project 3 in the amount of $1,400,000 to design and construct Main
Street between Brown Street and Blair Street.
D. Provide funding Project 4 in the amount of $1,700,000 to design and construct Main Street
between Blair Street and Mays Avenue.
E. Provide funding for Project 5 in the amount of $3,250,000 to design and construct the
realignment of Round Rock Avenue onto Liberty Avenue. This project would include the
removal of existing Round Rock Avenue between Brown Street and Mays Avenue.
F. Provide funding for Project 7 in the amount of $210,000 to design and construct storm
sewer improvements along Blair Street between Main Street and Florence Street; this
project would provide storm sewer for the Main Street improvements.
Funding:
Cost: $13,460,000.00
Source of funds: 4B -Round Rock Transportation System Development Corporation
Outside Resources: N/A
Background Information:
The TCIP is a multi-year spending plan for improvements to major roads and arterials in the City.
Funding for this plan is provided through the 1/2 cent sales tax established for the purpose of
transportation system improvements that support economic development.
Public Comment:
Public hearing held on July 9, 2009 by the Round Rock Transportation System Development Corporation.