R-09-07-23-10D1 - 7/23/2009RESOLUTION NO. R -09-07-23-10D1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Austin Bridge and Road for the East Austin Avenue and East Liberty Avenue Improvements Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Contract Change Order No. 3 to the Contract with Austin Bridge and Road for the East Austin Avenue and East Liberty Avenue Improvements Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of July, 2009. ATTEST: L. SARA L. WHITE, City Secretary 0:\wdox\SCCIncs\0112\0905\MUNICIPAL\x9o723D1.Doc/rmc ALAN MCGRAW, Mayor City of Round Rock, Texas CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering & DevelopmenServices PROJECT: E. Austin Ave./E. Liberty Ave.: Roadway, Drainage & Utility Improvements ORIGINAL CONTRACT PRICE: PREVIOUS CRANGE ORDERS: THIS CRANGE ORDER: CHANGE ORDERS TO DATE: $3,148,115.00 $76,589.56 ($139,203.89) ($62,614.33) PAGE 1 OF 2 DATE: July 6, 2009 CHANGE ORDER NO: 3 JUSTIFICATION: Retaining Wall added on Liberty Avenue & Final Quantity Adjustments EXHIBIT _-__ . -�~..` ���# )-- ITEM DESCRIPTION OF , UNIT ^~-,y�`�-~-��°�~°- QTY. UNIT PRICE AMOUNT CALENDAR/ �e ~^^~mu WORKING 10 FURN0H|kNDTALLMAINTAIN &RE��VE|NLET PROTECT EA 5.00 * 1.00 * 00 0 11 FURNISH INSTALL MAINTAIN & REMOVE SILT FENCE LF 248.00 $ 3.50 $ 800.00 0 17 2 I SURFACETACK SY (2.034.01) $ 10.00 $ (20,340.10) 0 18 HMAC TYPE C PATCH SY 720.52 $ 32.00 $ 23,248.64 0 19 8 IN CRUSHED LIMESTONE BASE SY (2,325.49) $ 14.00 $ (32.556.86) 0 20 IN SIDE2 SY (1,950.15) $ 12.00 $ (23.401.80) - 0 21 24 IN CONCRETE CURB AND GUTTER LF (1,917.11) $ 12.00 $ (23.005.32) 0 22 24 IN CONCRETE LAY DOWN CURB LF (208.00) $ 12.00 $ (3.216.00) 0 23 CONCRETE RADIUS UNIT |NCL�CURB &GUTTERAND CONCRETE APRON EA 1.00 o 1.300.08 * 1.300.00 0 24 0|N THICK CONCRETE VALLEY GUTTER SY 19.97 $ 00.00 $ 1,198.20 0 25 5 IN THICK CONCRETE DRIVEWAY SY 142.75 $ 70.00 $ 8.082.50 0 35 FURNISH AND INSTALL ROCK RIP RAP 8 IN TO 1 FT SY (10.00) $ 150.00 $ (1.500.00) 0 38 FURNISH AND INSTALL M|NDIAMETER ROCK RIP RAP SY 13.00 $ 200.00 $ 2.000.00 0 61 LOWERING EXISTING WASTEWATER MANHOLE EA 2.00 $ 1,250.00 $ 2.500.00 0 02 FURNISH AND INSTALL NEW SINGLE WASTEWATERSERVICE EA 1.00 $1.5OU.00 $ 1.500.00 0 63 FURNISK AND INSTALL 4 IN CONCRETE SIDEWALK SY (432.89) $ 40.00 $ (17.315.60) 0 64 FURNISH AND INSTALL CORR TYPE 1 SIDEWALK RAMP EA 3.00 $ 1,500.00 $ 4.500.00 0 66 RELOCATING AND RESETTING MAILBOXES INCL.TEMPORARY RELOCATION EA (71.0O)* 200.00 o (14.200.00) 0 67 EXTEND EXIST 4|N C0NCVVALKVVAYG INCL. STEPS SY (423.11) $ 01.00 $ (25.009J1) 0 68 FURNISH AND INSTALLING CONCRETE RIP RAP SY (00.67) $ 47.00 $ (2.851.49) 0 69 SODD|NG(BERMUD/V8T AUGUSTINE) INCL. TOP SOIL SY 3.820.00 $ 10.00 $ 38.200.00 0 70 HYDROMULCHING AND WATER TO SUSTAIN GROWTH SY (3,258.00) $ 7.00 $ (22,000.00) 0 Page 1 Total $ (100,5$5.54) 0 EXHIBIT DEPARTMENT: Engineering & Development Services PROJECT: E. Austin Ave./E. Liberty Ave.: Roadway, Drainage & Utili y Improvements PAGE 2 OF 2 DATE: July 6, 2009 CHANGE ORDER NO: 3 PREPAY: (/C f o SIGNATURE: PRINT NAME/TITLE. ENGINEER Austin Bridge & Road, L.P. iiiNNE OF • TRACTOR 4A.,....1 APPROVED: Date John H. Shine P.E. Regional Manager CITY OF ROUND ROCK PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: -4.42% PREVIOUS CHANGE ORDER: 2.43% TOTAL % CHANGE: -1.99% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $3,085,500.67 constco2/forms6/Ik ITEM # .... .a. DESCRIPTION OF _., ....... CHANGES UNIT QTY. UNIT AMOUNT ADDED DAYS CALENDAR/ WORKING 81 FURNISH AND INSTALL 4 IN SOLID WHITE STRIPING LF _PRICE $ 1.00 _ _(164.00) $ (164.00) 0..,.,.- 82 FURNISH AND INSTALL 4 IN SOLID YELLOW STRIPING LF 554.00 $ 1.00 $ 554.00 0 83 FURNISH AND INSTALL HAND RAIL LF (20.00) $ 140.00 $ (2,800.00) 0 B-3 8 IN TYPE B HMAC BASE (COLLECT. TYP. #3) SY (417.51) $ 33.00 $ (13,777.83) 0 B-4 4 IN TYPE B HMAC BASE UNDER CURBS (RES. TYP. #3) SY (84.30) $ 17.70 $ (1,492.11) 0 B 5 4 IN I YNE B HMAL: BASE BE I WEEN CURBS (Col I FCTORI SY (2,034.01) $ 16.60 $ (33,764.57) 0 AI -16 ASPHALT ROADWAY REPAIR LF (153.00) $ 25.00 $ (3,825.00) 0 CO3-1 MORTARED LIMESTONE RETAINING WALL SF 378.28 $ 37.70 $ 14,261.16 0 CO3-2 DEMO, REMOVE, AND DISPOSE OF EXISTING STONE WALL LS 1.00 $ 2,400.00 $ 2,400.00 0 $ - $ - $ - $ - $ - $ - $ - $ - $ % — 8.-09 TOTAL: $ (139,203.89) o PREPAY: (/C f o SIGNATURE: PRINT NAME/TITLE. ENGINEER Austin Bridge & Road, L.P. iiiNNE OF • TRACTOR 4A.,....1 APPROVED: Date John H. Shine P.E. Regional Manager CITY OF ROUND ROCK PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: -4.42% PREVIOUS CHANGE ORDER: 2.43% TOTAL % CHANGE: -1.99% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $3,085,500.67 constco2/forms6/Ik ' me Will :,.., ..a�a. ;-mm M� ���W4,20 � •� ��,.,�+. y mid - r AUSTIN AVENUE IMPROVEMENTS PROJECT DATE: SUBJECT: ITEM: Department: Staff Person: Justification: July 16, 2009 City Council Meeting—July 23, 2009 10D1. Consider a resolution authorizing the Mayor to execute Change Order No. 3 with Austin Bridge and Road for the East Austin Avenue and East Liberty Avenue Improvement Project. Engineering and Development Services Danny Ha!den, P.E., City Engineer Change Order No. 3 is required for additions to the current contract and will also adjust final bid item quantities. Funding: Cost: Source of funds: Original Contract Previous Change Orders Change Order # 3 Revised Contract Outside Resources: ($139,203.89) 2002 G.O. Bonds Amount % Change $3,148,115.00 N/A $ 76,589.56 2.43% ($ 139,203.89) (4.42%) $3,085,500.67 (1.99%) Austin Bridge and Road Kasberg Patrick and Associates Background Information: The original construction contract with Austin Bridge and Road (AB&R), R -08-04-24-10C1, was for street, drainage, and some water and wastewater line improvements on East Austin Avenue and East Liberty Avenue. Change Order No. 1, R -09-05-14-9D1, adjusted the original contract amount due to work associated with underground water, wastewater, and storm sewer utilities. Change Order No. 2 was for reimbursing AB&R for downtime of equipment and personnel due to the relocation of an existing gas line at the east end of Liberty Avenue. Change Order # 3 adjusts the contract due to the addition of retaining wall on a portion of Liberty Avenue and, reconciles final bid item quantities for the project. Overall, this change order results in a reduction of $139,203.89 to the contract amount. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering & Development Services PROJECT: E. Austin Ave./E. Liberty Ave.: Roadway, Drainage & Utility Improvements ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $3,148,115.00 $76,589.56 ($139,203.89) ($62,614.33) PAGE 1 OF 2 DATE: July 6, 2009 CHANGE ORDER NO: 3 JUSTIFICATION: Retaining Wall added on Liberty Avenue & Final Quantity Adjustments R- U� - U' -i - oto ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 10 FURNISH INSTALL MAINTAIN & REMOVE INLET PROTECTION EA 5.00 $ 100.00 $ 500.00 0 11 FURNISH INSTALL MAINTAIN & REMOVE SILT FENCE LF 248.00 $ 3.50 $ 868.00 0 17 2 IN HVAC SURFACE (TYPE C) INCLUDING PRIME & TACK SY (2,034.01) $ 10.00 $ (20,340.10) 0 18 HMAC TYPE C PATCH SY 726.52 $ 32.00 $ 23,248.64 0 19 8 IN CRUSHED LIMESTONE BASE SY (2,325.49) $ 14.00 $ (32,556.86) 0 20 2 IN HMAC SURFACE (TYPE C) W/PRIME & TACK FOR SIDE STREET SY (1,950.15) $ 12.00 $ (23,401.80) 0 21 24 IN CONCRETE CURB AND GUTTER LF (1,917.11) $ 12.00 $ (23,005.32) 0 22 24 IN CONCRETE LAY DOWN CURB LF (268.00) $ 12.00 $ (3,216.00) 0 23 CONCRETE RADIUS UNIT INCL. CURB & GUTTER AND CONCRETE APRON EA 1.00 $ 1,300.00 $ 1,300.00 0 24 6 IN THICK CONCRETE VALLEY GUTTER SY 19.97 $ 60.00 $ 1,198.20 0 25 5 IN THICK CONCRETE DRIVEWAY SY 142.75 $ 70.00 $ 9,992.50 0 35 FURNISH AND INSTALL ROCK RIP RAP 8 IN TO 1 FT SY (10.00) $ 150.00 $ (1,500.00) 0 38 FURNISH AND INSTALL 6 IN DIAMETER ROCK RIP RAP SY 13.00 $ 200.00 $ 2,600.00 0 61 LOWERING EXISTING WASTEWATER MANHOLE EA 2.00 $ 1,250.00 $ 2,500.00 0 62 FURNISH AND INSTALL NEW SINGLE WASTEWATER SERVICE EA 1.00 $ 1,500.00 $ 1,500.00 0 63 FURNISH AND INSTALL 4 IN CONCRETE SIDEWALK SY (432.89) $ 40.00 $ (17,315.60) 0 64 FURNISH AND INSTALL CORR TYPE 1 SIDEWALK RAMP EA 3.00 $ 1,500.00 $ 4,500.00 0 66 RELOCATING AND RESETTING MAILBOXES INCL. TEMPORARY RELOCATION EA (71.00) $ 200.00 $ (14,200.00) 0 67 EXTEND EXIST 4IN CONC WALKWAYS INCL. STEPS SY (423.11) $ 61.00 $ (25,809.71) 0 68 FURNISH AND INSTALLING CONCRETE RIP RAP SY (60.67) $ 47.00 $ (2,851.49) 0 69 SODDING (BERMUDA/ST. AUGUSTINE) INCL. TOP SOIL SY 3,820.00 $ 10.00 $ 38,200.00 0 70 HYDROMULCHING AND WATER TO SUSTAIN GROWTH SY (3,258.00) $ 7.00 $ (22,806.00) 0 Page 1 Total $ (100,595.54) 0 R- U� - U' -i - oto PAGE 2 OF 2 DEPARTMENT: Engineering & Development Services DATE: July 6, 2009 PROJECT: E. Austin Ave./E. Liberty Ave.: Roadway, Drainage & Utility Improvements CHANGE ORDER NO: 3 ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 81 FURNISH AND INSTALL 4 IN SOLID WHITE STRIPING LF (164.00) $ 1.00 82 FURNISH AND INSTALL 4 IN SOLID YELLOW STRIPING LF 554.00 $ 1.00 $ (164.00) $ 554.00 0 0 83 FURNISH AND INSTALL HAND RAIL LF (20.00) $ 140.00 B-3 B-4 8 IN TYPE B HMAC BASE (COLLECT. TYP. #3) SY (417.51) $ 33.00 $ (2,800.00) $ (13,777.83) 0 0 B-5 4 IN TYPE B HMAC BASE UNDER CURBS (RES. TYP. #3) 4 IN I YPE B HMAC BASE BEI WEEN CURBS (COLI FCTORI SY (84.30) $ 17.70 $ (1,492.11) 0 SY (2,034.01) $ 16.60 $ (33,764.57) 0 AI -16 ASPHALT ROADWAY REPAIR LF (153.00) $ 25.00 $ (3,825.00) 0 CO3-1 MORTARED LIMESTONE RETAINING WALL DEMO, REMOVE, AND DISPOSE OF EXISTING STONE WALL SF 378.28 $ 37.70 $ 14,261.16 0 CO3-2 LS 1.00 $ 2,400.00 $ 2,400.00 0 PREPARED BY: ENGINEER Austin Bridge & Road, L.P. 7-8 og 7/C fo Date SIGNATURE: PRINT NAME/TITLE: NAM OF CRACTOR aQ John H. Shine, P.E. Regional Manager APPROVED: TOTAL: $ (139,203.89) 0 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: -4.42% PREVIOUS CHANGE ORDER: 2.43% TOTAL % CHANGE: -1.99% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $3,085,500.67 ITY OF ROUND ROCK constco2/forms6/Ik