R-09-09-10-10E1 - 9/10/2009RESOLUTION NO. R -09-09-10-10E1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with BRH-Garver Construction, LP for the Southwest Downtown Infrastructure Improvements Phase 1B Project, and WHEREAS, the Council has determined that it is necessary to make adjustments to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust the quantities in said Contract in accordance with the attached Quantity Adjustment No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Construction Quantity Adjustment No. 1 to the Contract with BRH-Garver Construction, LP for the Southwest Downtown Infrastructure Improvements Phase 1B Project, a copy of said quantity adjustment being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of September, 2009. Ck ALAN MCGRAW, Mayor ATTEST: City of Round Rock, Texas alWAL•RiAte SARA L. WHITE, City Secretary O:\wdox\SCC1nts\0112\0905\MUNICIPAL\R90910E1.DOC/rmc CITY OF ROUND ROCK CONSTRUCTION QUANTITY ADJUSTMENT DEPARTMENT: Transportation Services PAGE 1 OF 3 DATE: 7/30/2009 PROJECT: Southwest Downtown District QUANTITY ADJUSTMENT NO: 1 Infastructure Improvements Phase 1B JUSTIFICATION: ORIGINAL CONTRACT PRICE: PREVIOUS QUANTITY ADJUSTMENTS: THIS QUANTITY ADJUSTMENT: QUANTITY ADJUSTMENTS TO DATE: $3,121,260.00 $0.00 $188,436.00 $188,436.00 CH PREPARED BY: ✓.4.L ca-�e sf--f -c- DATE SIGNATURE: PRINT NAME/TI NAME OF CONTRACTOR APPROVED: PERCENT OF ORIGINAL CONTRACT PRICE THIS QUANTITY ADJUSTMENT: $188,436.00 PREVIOUS QUANTITY ADJUSTMENTS: 0 TOTAL % CHANGE: 6.04% ORIGINAL CONTRACT PRICE PLUS QUANTITY ADJUSTMENTS: $3,309,696.00 CITY OF ROUND ROCK constco2/forms6/Ik 1 a EXHIBIT ITEM # DESCRIPTION UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 8 PC Concrete Driveways, add 587 SF to reflect actual quantities SF 587 $27.00 $15,849.00 11 PC Concrete Valley Gutter, add 528 SF 528 $30.00 $15,840.00 SF to reflect actual quantities 14 PC Concrete Retainer Curb, Type B, add 5 LF to reflect actual quantities LF 5 $32.00 $160.00 15 Filter Inlet Protection, delete 21 EA to reflect actual quantities EA -21 $87.00 ($1,827.00) 21 Handicap Ramp to Structure, add 1 EA 1 $12,000.00 $12,000.00 EA to reflect actual quantities TOTAL: $42,022.00 0 PREPARED BY: ✓.4.L ca-�e sf--f -c- DATE SIGNATURE: PRINT NAME/TI NAME OF CONTRACTOR APPROVED: PERCENT OF ORIGINAL CONTRACT PRICE THIS QUANTITY ADJUSTMENT: $188,436.00 PREVIOUS QUANTITY ADJUSTMENTS: 0 TOTAL % CHANGE: 6.04% ORIGINAL CONTRACT PRICE PLUS QUANTITY ADJUSTMENTS: $3,309,696.00 CITY OF ROUND ROCK constco2/forms6/Ik 1 a EXHIBIT CITY OF ROUND ROCK CONSTRUCTION QUANTITY ADJUSTMENT DEPARTMENT: Transportation Services PROJECT: Southwest Downtown District Infastructure Improvements Phase 1B PAGE 2 OF 3 DATE: 7/30/2009 QUANTITY ADJUSTMENT NO: 1 constco2lforms6/Ik ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 22 2" GaIv. Steel Hand Rail, add 22 LF to reflect actual quantities LF 22 $62.00 $1,364.00 24 Remove and Relocate Fences, add LF 11 $10.00 $110.00 11 LF to reflect actual quantities 27 Round Rock Duct Bank 52" Manhole add 3 EA to reflect actual quantities EA 3 $7,000.00 $21,000.00 28 E2 -Duct Bank, add 523 LF to reflect actual quantities LF 523 $163.00 $85,249.00 29 E2 -Duct Bank (bored), delete 80 LF to relfect actual quantities LF -80 $530.00 ($42,400.00) 30 E4 -Duct Bank, add 10 LF to reflect actual quantities LF 10 $195.00 $1,950.00 31 E6- Duct Bank, delete 45 LF to reflect actual quantities LF -45 $197.00 ($8,865.00) 32 E8- Duct Bank, add 30 LF to reflect actual quantities LF 30 $296.00 $8,880.00 34 3-4" Sch. 40 PVC, add 350 LF to reflect actual quantities LF 350 $62.00 $21,700.00 36 Precast Switchgear Pad, add 5 EA to reflect actual quantities EA 5 $1,000.00 $5,000.00 37 Precast Transformer Pad, delete 2 EA -2 $1,100.00 ($2,200.00) EA to reflect actual quantities 45 Time Warner Cable Manhole, delete EA -1 $4,000.00 ($4,000.00) 1 EA to reflect actual quantities 48 SBC- Handhole, add 2 EA to reflect actual quantities EA 2 $12,000.00 $24,000.00 69 5' Curb Inlet, add 1 EA to reflect actual quantities EA 1 $3,500.00 $3,500.00 74 RCP, 21" Dia., add 2 LF to reflect actual quantities LF 2 $78.00 $156.00 TOTAL: $115,444.00 constco2lforms6/Ik CITY OF ROUND ROCK CONSTRUCTION QUANTITY ADJUSTMENT PAGE3OF3 DEPARTMENT: Transportation Services DATE: 7/30/2009 PROJECT: Southwest Downtown District QUANTITY ADJUSTMENT NO: 1 Infastructure Improvements Phase 1B $30,970.00 ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 77 RCP, 30" Dia., delete 1 LF to reflect actual quantities LF -1 $100.00 ($100.00) 80 Single Wastewater Service, delete EA -8 $2,000.00 ($16,000.00) 8 EA to reflect actual quantities 85 12" Pipe PVC C-900, add 730 LF to reflect actual quantities LF 730 $69.00 $50,370.00 93 4" Gate Valve, add 1 EA to reflect actual quantities EA 1 $900.00 $900.00 95 8" Gate Valve, add 3 EA to reflect actual quantities EA 3 $1,300.00 $3,900.00 96 12" Gate Valve, add 5 EA to reflect actual quantities EA 5 $2,400.00 $12,000.00 97 4" Tapping Sleeve & Valve, delete EA -1 $4,700.00 ($4,700.00) 1 EA to reflect actual quantities 98 8" Tapping Sleeve & Valve, delete EA -1 $6,000.00 ($6,000.00) 1 EA to reflect actual quantities 99 12" Tapping Sleeve & Valve, delete EA -3 $9,000.00 ($27,000.00) 3 EA to reflect actual quantities 100 12'x4" Tee, add 1 EA to reflect actual quantities EA 1 $500.00 $500.00 102 12'x8" Tee, add 2 EA to reflect actual quantities EA 2 $600.00 $1,200.00 103 12" 45 degree bend, add 8 EA to relfect actual quantities EA 8 $425.00 $3,400.00 105 6" PVC ASTM SDR26, add 250 LF to reflect actual quantities LF 250 $50.00 $12,500.00 $30,970.00 DATE: September 3, 2009 SUBJECT: City Council Meeting — September 10, 2009 ITEM: 10E1. Consider a resolution authorizing the Mayor to execute Quantity Adjustment No. 1 with BRH-Garver Construction, LP for the Southwest Downtown District Infrastructure Improvements Phase 1B Project. Department: Staff Person: Justification: Transportation Services Tom Word, P.E., Chief of Public Works Operations Quantity Adjustment No. 1 is necessary in relation to the unforeseen items that are required to complete the work pertaining to the connection of dry utilities and elevation differences in sidewalks and adjacent properties. Funding: Cost: $188,436.00 Source of funds: 2002 General Obligations Bonds General Self -Financed Construction Fund Tree Replacement Fund Amount % Change Original Contract $3,121,260.00 N/A Previous Changer Orders $0.00 0.0 Proposed Change Order #2 $27,336.50 0.876 Previous Quantity Adjustments $0.00 N/A Proposed Quantity Adjustment $188,436.00 N/A Revised Contract $3,337,032.50 Outside Resources: BRH-Garver Construction, LP Background Information: Council approved the original contract amount with BRH-Garver Construction, LP at their January 8, 2009 meeting. The original contract amount was approved as $3,121,260.00 (R -09-01-08-8B2) Public Comment: N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION QUANTITY ADJUSTMENT DEPARTMENT: Transportation Services PROJECT: Southwest Downtown District Infastructure Improvements Phase 1B ORIGINAL CONTRACT PRICE: PREVIOUS QUANTITY ADJUSTMENTS: THIS QUANTITY ADJUSTMENT: QUANTITY ADJUSTMENTS TO DATE: $3,121,260.00 $0.00 $188,436.00 $188,436.00 PAGE 1 OF 3 DATE: 7/30/2009 QUANTITY ADJUSTMENT NO: 1 JUSTIFICATION: PREPARED BY: SIGNATURE: .t els" Z. 7 , 'J DATE NAME OF CONTRACTOR ei, .(l PRINT NAME/TI(Ti1E: v1/ GI APPROVED: `1 YIA 41.0.P1 CITY OF ROUND ROCK 9_-01- OA-tO-tO t PERCENT OF ORIGINAL CONTRACT PRICE THIS QUANTITY ADJUSTMENT: $188,436.00 PREVIOUS QUANTITY ADJUSTMENTS: 0 TOTAL % CHANGE: 6.04% ORIGINAL CONTRACT PRICE PLUS QUANTITY ADJUSTMENTS: $3,309,696.00 constco2/forms6/Ik .+ ■■r+g w6. LOA 1A ADDED DAYS ITEM # DESCRIPTION UNIT CALENDAR/ -_ UNIT QTY. PRICE AMOUNT WORKING 8 PC Concrete Driveways, add 587 SF to reflect actual quantities SF 587 $27.00 $15,849.00 11 PC Concrete Valley Gutter, add 528 Sr 528 $30.00 $15,840.00 SF to reflect actual quantities 14 PC Concrete Retainer Curb, Type 8, add 5 LF to reflect actual quantities LF 5 $32.00 $160.00 15 Filter Inlet Protection, delete 21 EA to reflect actual quantities EA -21 $87.00 ($1,827.00) 21 Handicap Ramp to Structure, add 1 EA 1 $12,000.00 $12,000.00 EA to reflect actual quantities TOTAL: $42,022.00 0 PREPARED BY: SIGNATURE: .t els" Z. 7 , 'J DATE NAME OF CONTRACTOR ei, .(l PRINT NAME/TI(Ti1E: v1/ GI APPROVED: `1 YIA 41.0.P1 CITY OF ROUND ROCK 9_-01- OA-tO-tO t PERCENT OF ORIGINAL CONTRACT PRICE THIS QUANTITY ADJUSTMENT: $188,436.00 PREVIOUS QUANTITY ADJUSTMENTS: 0 TOTAL % CHANGE: 6.04% ORIGINAL CONTRACT PRICE PLUS QUANTITY ADJUSTMENTS: $3,309,696.00 constco2/forms6/Ik CITY OF ROUND ROCK CONSTRUCTION QUANTITY ADJUSTMENT DEPARTMENT: Transportation Services PROJECT: Southwest Downtown District Infastructure Improvements Phase 1B CHANGE DATA PAGE2OF3 DATE: 7/30/2009 QUANTITY ADJUSTMENT NO: 1 ITEM # 22 24 27 28 29 30 31 32 34 36 37 45 48 69 74 DESCRIPTION OF CHANGES 2" GaIv. Steel Hand Rail, add 22 LF to reflect actual quantities Remove and Relocate Fences, add 11 LF to reflect actual quantities Round Rock Duct Bank 52" Manhole add 3 EA to reflect actual quantities E2 -Duct Bank, add 523 LF to reflect actual quantities E2 -Duct Bank (bored), delete 80 LF to relfect actual quantities E4 -Duct Bank, add 10 LF to reflect actual quantities E6- Duct Bank, delete 45 LF to reflect actual quantities E8- Duct Bank, add 30 LF to reflect actual quantities 3-4" Sch. 40 PVC, add 350 LF to reflect actual quantities Precast Switchgear Pad, add 5 EA to reflect actual quantities Precast Transformer Pad, delete 2 EA to reflect actual quantities Time Warner Cable Manhole, delete 1 EA to reflect actual quantities SBC- Handhole, add 2 EA to reflect actual quantities 5' Curb Inlet, add 1 EA to reflect actual quantities RCP, 21" Dia., add 2 LF to reflect actual quantities UNIT LF LF EA LF LF IF LF LF LF EA EA EA EA EA LF QTY. 22 11 3 523 -80 10 -45 30 350 5 -2 -1 2 1 2 UNIT PRICE $62.00 $10.00 $7,000.00 $163.00 $530.00 $195.00 $197.00 $296.00 $62.00 $1,000.00 $1,100.00 $4,000.00 $12,000.00 $3,500.00 $78.00 AMOUNT $1,364.00 $110.00 $21,000.00 $85,249.00 ($42,400.00) $1,950.00 ($8,865.00) $8,880.00 $21,700.00 $5,000.00 ($2,200.00) ($4,000.00) $24,000.00 $3,500.00 $156.00 TOTAL: $115,444.00 Abo65 DAYS CALENDAR/ WORKING constco2lforms6/!k CITY OF ROUND ROCK CONSTRUCTION QUANTITY ADJUSTMENT DEPARTMENT: Transportation Services PROJECT: Southwest Downtown District Infastructure Improvements Phase 1B CHANGE DATA ITEM # DESCRIPTION OF CHANGES Neatly UNIT Q PAGE3OF3 DATE: 7/30/2009 QUANTITY ADJUSTMENT NO: 1 UNIT PRICE ar 77 80 85 93 95 96 97 98 99 100 102 103 105 RCP, 30" Dia., delete 1 LF to reflect actual quantities Single Wastewater Service, delete 8 EA to reflect actual quantities 12" Pipe PVC C-900, add 730 LF to reflect actual quantities 4" Gate Valve, add 1 EA to reflect actual quantities 8" Gate Valve, add 3 EA to reflect actual quantities 12" Gate Valve, add 5 EA to reflect actual quantities 4" Tapping Sleeve & Valve, delete 1 EA to reflect actual quantities 8" Tapping Sleeve & Valve, delete 1 EA to reflect actual quantities 12" Tapping Sleeve & Valve, delete 3 EA to reflect actual quantities 12'x4" Tee, add 1 EA to reflect actual quantities 12'x8" Tee, add 2 EA to reflect actual quantities 12" 45 degree bend, add 8 EA to relfect actual quantities 6" PVC ASTM SDR26, add 250 LF to reflect actual quantities LF EA LF EA EA EA EA EA EA EA EA EA LF 730 1 3 5 -1 -1 -3 1 2 8 250 $100.00 $2,000.00 $69.00 $900.00 $1,300.00 $2,400.00 $4,700.00 $6,000.00 $9,000.00 $500.00 $600.00 $425.00 $50.00 AMOUNT ($100.00 <=jhp ADDED DAYS CALENDAR! WORKING ($16,000.00) $50,370.00 $900.00 $3,900.00 $12,000.00 ($4,700.00) ($6, 000.00) ($27,000.00) $500.00 $1,200.00 $3,400.00 $12,500.00 TOTAL: $30,970.00