Loading...
R-09-09-10-10E2 - 9/10/2009RESOLUTION NO. R -09-09-10-10E2 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with BRH-Garver Construction, LP for the Southwest Downtown Infrastructure Improvements Phase 1B Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Contract Change Order No. 2 to the Contract with BRH-Garver Construction, LP for the Southwest Downtown Infrastructure Improvements Phase 1B Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of September, 2009. ATTEST: City of Round Rock, Texas ALAN MCGRAW, Mayor si4A, \AP,at2 SARA L. WHITE, City Secretary O:\wdox\SCC1nts\0112\0905\MUNICIPAL\R90910E2.DOC/rmc CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Transportation Services PROJECT: Southwest Downtown District Infrastructure Improvements Phase 1B ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $3,121,260.00 $0.00 $27,336.50 $27,336.50 PAGE 1 OF 1 DATE: 7/30/2009 CHANGE ORDER NO: 2 JUSTIFICATION: These are unforeseen items required to complete work for the connection of dry utilities and elevation differences in sidewalks and adjacent properties. nAn ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING NEW 110 Deduct for Tree Grates, deduct for changing 11 EA grate sizes EA -11 $1,831.00 ($20,141.00) Y� NEW 111 Deduct for Tree Grates, deduct for changing 21 EA to mulch beds EA -21 $2,695.00 ($56,595.00) NEW 112 Additional Excavation for proper drainage on duct banks, 110 CY CY 110 $50.00 $5,500.00 NEW 113 Round Rock Service lines for Comm. add 150 LF for 15 EA C-10 services LF 150 $163.00 $24,450.00 NEW 114 Trench Repairs outside reconstruction areas, 12" base,2" HMAC, 330 LF LF 330 $62.00 $20,460.00 NEW 115 Wet Connections, add 4 EA for deleting taps EA 4 $3,000.00 $12,000.00 NEW 116 Raise existing castings to grade for paving, add 5 EA EA 5 $500.00 $2,500.00 NEW 117 12"x12" tee, add 5 EA for deleting taps EA 5 $750.00 $3,750.00 NEW 118 Single 4" Conduit added N. of MH A-1 for Oncor work LF 200 $13.00 $2,600.00 NEW Install first course of rock walls LF 700 $35.00 $24,500.00 119 NEW 120 Install second course of rock walls LF 475 $17.50 $8,312.50 rEXHIBIT 1 TOTAL: $27,336.50 nAn PREPARED BY: Pr. - anager BRH-Garver Construct • , LP SIGNATURE: NAME OF CONTRACTOR DATE PRINT NAME/TITL APPROVED: John R. Hughes/ Construction CITY OF ROUND ROCK PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: $27,336.50 PREVIOUS CHANGE ORDER: $0.00 TOTAL % CHANGE: 0.876% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $3,148,596.50 constco2/forms6/Ik DATE: September 3, 2009 SUBJECT: City Council Meeting — September 10, 2009 ITEM: 10E2. Consider a resolution authorizing the Mayor to execute Change Order No. 2 with BRH-Garver Construction, LP for the Southwest Downtown District Infrastructure Improvements Phase 1B Project. Department: Staff Person: Justification: Transportation Services Tom Word, P.E., Chief of Publics Works Operations Due to unforeseen items that are required to complete the work pertaining to the connection of dry utilities and elevation differences in sidewalks and adjacent properties, Change Order No. 2 has been requested by BRH-Garver Construction, LP. Funding: Cost: $27,336.50 Source of funds: 2002 General Obligation Bonds General Self -Finance Construction Fund Tree Replacement Fund Amount % Change Original Contract $3,121,260.00 N/A Previous Changer Orders $0.00 0.0 Proposed Change Order #2 $27,336.50 0.876 Previous Quantity Adjustments $0.00 N/A Proposed Quantity Adjustment $188,436.00 N/A Revised Contract $3,337,032.50 Outside Resources: BRH-Garver Construction, LP Background Information: Council approved the original contract with BRH-Garver Construction, LP at their January 8, 2009 meeting. The original contract amount was approved as $3,121,260.00 (R -09-01-08-8B2), while Change Order No. 1 did not result in a cost adjustment; it was approved by the City Manager on April 17, 2009 (CM -09-04-063) Public Comment: N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Transportation Services PROJECT; Southwest Downtown District Infrastructure Improvements Phase 1B ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $3,121,260.00 $0.00 $27,336.50 $27,336.50 CHANGE DATA PAGE 1 OF 1 DATE: 7/30/2009 CHANGE ORDER NO: 2 JUSTIFICATION: These are unforeseen items required to complete work for the connection of dry utilities and elevation differences in sidewalks and adjacent properties. ITEM # DESCRIPTION OF CHANGES UNIT QTY. NEW 110 NEW 111 NEW 112 NEW 113 NEW 114 NEW 115 NEW 116 NEW 117 NEW 118 NEW 119 NEW 120 Deduct for Tree Grates, deduct for changing 11 EA grate sizes Deduct for Tree Grates, deduct for changing 21 EA to mulch beds Additional Excavation for proper drainage on duct banks, 110 CY Round Rock Service lines for Comm. add 150 LF for 15 EA C-10 services Trench Repairs outside reconstruction areas, 12" base,2" HMAC, 330 LF Wet Connections, add 4 EA for deleting taps Raise existing castings to grade for paving, add 5 EA 12"x12" tee, add 5 EA for deleting taps Single 4" Conduit added N. of MH A-1 for Oncor work Install first course of rock walls Install second course of rock walls EA EA CY LF LF EA EA EA LF LF LF -11 -21 110 150 330 4 5 5 200 700 475 UNIT PRICE $1,831.00 $2,695.00 $50.00 $163.00 $62.00 $3,000.00 $500.00 $750.00 $13.00 $35.00 $17.50 AMOUNT ($20,141.00) ($56,595.00) $5,500.00 $24,450.00 $20,460.00 $12,000.00 $2,500.00 $3,750.00 $2,600.00 $24,500.00 $8,312.50 TOTAL: it -vet -Oct- t u- lr "�-- $27,336.50 ADDED DAYS CALENDAR/ WORKING PREPARED BY: Pr anager BRH-Garver Construct • , LP NAME OF CONTRACTOR SIGNATURE: PRINT NAME/TITL APPROVED: j PERCENT OF ORIGINAL CONTRACT PRICE DATE John R. Hughes/ Construction y1�1 1/1' 61.10.061 CITY OF ROUND ROCK THIS CHANGE ORDER: $27,336.50 PREVIOUS CHANGE ORDER: $0.00 TOTAL % CHANGE: 0.876% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $3,148,596.50 constco2/forms6/Ik