Loading...
R-09-09-10-10E3 - 9/10/2009RESOLUTION NO. R -09-09-10-10E3 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Viking Construction for the 2008 Street Maintenance Program (Micro -Surfacing) Project, and WHEREAS, the Council has determined that it is necessary to make adjustments to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust the quantities in said Contract in accordance with the attached Quantity Adjustment No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Construction Quantity Adjustment No. 1 to the Contract with Viking Construction for the 2008 Street Maintenance Program (Micro -Surfacing) Project, a copy of said quantity adjustment being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of September, 2009. ATTEST: A4(k-• (A&kt SARA L. WHITE, City Secretary O:\wdox\SCC1nts\0112\0905\MUNICIPAL\R90910E3.DOC/xmc ALAN MCGRAW, Mayor City of Round Rock, Texas City of Round Rock Construction Quantity Adjustment Department: Transportation Services Project: 2008 Street Maintenance Program Micro -Surfacing Original Contract Price: Previous Quantity Adjustments: This Quantity Adjustment: Quantity Adjustments To Date: $1,533,115.00 $0.00 $381,211.16 $381,211.16 C Page 1 of 1 Date: Quantity Adjustment No. Justification: An increase in quanities due to the Aug. 4, 2009 1 extreme dry conditions and the high PI soils in the area. Prepared by: Date Si. nature: Na 1 e of • ntractor Print Name/Title: Approved: 4io "k9yPGe/69/wt°!fc Sioaj City of Round Rock Percent of Original Contract Price This Quantity Adjustment: Previous Quantity Adjustments: Total % Change: Original Contract Price Plus Quantity Adjustments: $381,211.16 $0.00 24.865% 1 D 1 EXHIBIT HAIR $1,914,326.16 Item# Description Of Changes Unit Qty. Unit Price Amount Added Days Calendar/ Working 1 2 Micro -Surfacing 30723.85 SY $2.82 $86,641 26 11 Pavement Repair -1717 SY $49.50 -$84,991.50 -9 3 4 Minor Pavement Repair 1683.92 Ton $168.00 $282,898.56 12 Level up -50 Ton $137.00 -$6,850.00 2 5 6 R&R Concrete Curb and Gutter 786 LF $26.50 $20,829.00 8 R&R Concrete Driveway 1235 S.F. $11.80 $14,573.00 4 7 8 R&R Concrete Sidewalk 3930 S.F. $11.25 $44,212.50 8 Thermoplastic Pavement marking -13993 LF $0.38 -$5,317.34 -3 9 Crack Sealing 91299 LF $0.32 $29,215.68 6 10 Traffic Control 0 LS $6,700.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 Total $381,211.16 39 Prepared by: Date Si. nature: Na 1 e of • ntractor Print Name/Title: Approved: 4io "k9yPGe/69/wt°!fc Sioaj City of Round Rock Percent of Original Contract Price This Quantity Adjustment: Previous Quantity Adjustments: Total % Change: Original Contract Price Plus Quantity Adjustments: $381,211.16 $0.00 24.865% 1 D 1 EXHIBIT HAIR $1,914,326.16 DATE: September 3, 2009 SUBJECT: City Council Meeting — September 10, 2009 ITEM: 10E3. Consider a resolution authorizing the Mayor to execute Quantity Adjustment No. 1 with Viking Construction for the 2008 Street Maintenance Program (Micro -Resurfacing) Project. Department: Staff Person: Justification: Transportation Services Tom Word, P. E., Chief of Public Works Operations Quantity Adjustment No. 1 encompasses the final quantity adjustments that are required for completion of this project. Funding: Cost: $381,211.16 Source of funds: General Fund Original Contract Previous Adjustments Qty. Adjustment #1 Revised Contract Amount $ 1,533,115.00 $ 0.00 $ 381,211.16 $ 1,914,326.16 Outside Resources: Viking Construction Inc. Background Information: This contract was awarded on October 9, 2008 under resolution R -08-10-09-8D2 for the amount of $1,533,115.00. This contract encompasses Greenslopes, Meadows, Sam Bass Trails, Hermitage, Woods Bent Tree subdivisions. This project includes pavement repairs, concrete repairs and Micro -surfacing. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS City of Round Rock Construction Quantity Adjustment Department: Transportation Services Page 1 of 1 Date: Aug. 4, 2009 Project: 2008 Street Maintenance Program Quantity Adjustment No. 1 Justification: Micro -Surfacing Original Contract Price: Previous Quantity Adjustments: This Quantity Adjustment: Quantity Adjustments To Date: $1,533,115.00 An increase in quanities due to the $0.00 extreme dry conditions and the high $381,211.16 PI soils in the area. $381,211.16 C %��' Prei" Pr,' :e anager Date Signature:( -3 Print Name/Title: Approved: Percent of Original Contract Price This Quantity Adjustment: $381,211.16 Previous Quantity Adjustments: $0.00 Nab e of.6tiontractor Total %Change: 24.865% d`'/� Original Contract Price Plus ,),/i'PLj 04/.0C SU/%r Quantity Adjustments: $1,914,326.16 City of Round Rock 01- (or togg Item# Description of Changes Unit Qty. Unit Price Amount Added Days Calendar/ Working 1 2 Micro -Surfacing 30723.85 SY $2.82 $86,641.26 £ ~y 11 Pavement Repair -1717 SY $49.50 -$84,991.50 -9 3 4 Minor Pavement Repair 1683.92 Ton $168.00 $282,898.56 12 Level up -50 Ton $137.00 -$6,850.00 2 5 6 R&R Concrete Curb and Gutter 786 LF $26.50 $20,829.00 8 R&R Concrete Driveway 1235 S.F. $11.80 $14,573.00 4 7 8 R&R Concrete Sidewalk 3930 S.F. $11.25 $44,212.50 8 Thermoplastic Pavement marking -13993 LF $0.38 -$5,317.34 -3 9 Crack Sealing 91299 LF $0.32 $29,215.68 6 10 Traffic Control 0 LS $6,700.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 Total $381,211.16 39 %��' Prei" Pr,' :e anager Date Signature:( -3 Print Name/Title: Approved: Percent of Original Contract Price This Quantity Adjustment: $381,211.16 Previous Quantity Adjustments: $0.00 Nab e of.6tiontractor Total %Change: 24.865% d`'/� Original Contract Price Plus ,),/i'PLj 04/.0C SU/%r Quantity Adjustments: $1,914,326.16 City of Round Rock 01- (or togg