CM-2017-1536 - 11/14/2017Page I ora — Contract Quantity Adjustment/Change Order rev, 06 1= Department: Building Construction General Services Project Name: Central Fire Station Restroom Addition Date: 11/1117 City Project Change Order/Quantity ID Number Adjustment No. 1 Justification Per the Architectural and MEP Construction Issued Set of Plans, the existing four -inch waste water line shown is incorrect. After demolition of concrete and earth to dedicated location of six feet, the waste water line is actually a total of fifteen feet from location shown on plans. This change order serves purpose to execute properly and safely the waste water connection scope. There will be no delay in schedule. SUMMARY Amount °/a Change Original Contract Price: $33,693.00 Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Pius Quantity Adjustment(s) Pius Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: Sign tur Contractor: Ar - Signature City Project Manager:^ nature Mayor/City Manager ? f Signal e Submitted for Approval Richard Will, Building Construction Printed Name, Title, Company Approvals 45 days 0 0 0 er, CORR Brian Ritter, President, Prime Construction Printed Name, Title, Company Chad McDowell General Services Director CORR $0,00 $0.00 $33,693.00 $8,392.00 $8,392.00 $42,085.00 $8,392.00 , Inc. Date Date H- - l 0.00 0.25 0.25 RV, 0645 Item # Contract Quantity Adjustment/Change Order Project Name: Central Fire Station Restroom Addition Quan. Adj./Change order No, Item Change Order Data Unit Unit Price I Amount Page 2 ora Contract Time Adjustment �RITTUR•80TKIN PRIME CONSTRUCTION COMPANY, INC. 1111 H.rccres I.COIt 20907 Martin Ln Moen ille, TX 78660 (office)512.244.7799 (fax) 512.990.9886 Change Order Estimate: • Waste water connection in Men's Restroom — Rm 100 con't - Additional excavation to existing waste water line - Extend new waste water line to connect to existing - Backfill with slurry mix - Vibrate new mix throughout - Pour new topping slab at the (3) holes - Include 3000psi mix with #4, crossed rebar doweled into adjacent - Supply and install new approved --12x12" tile at (3) exposed areas - $5.00sf tile allowance included - Haul off remaining job-related debris; wipe down all adjacent surfaces -$8,148.00 • Additional GC's - Bond expense — 3% -$244.00 TTL: $8,392.00 Central Fire Station Restroom Addition Change Order #01 Summary Date: 11/01/2017 Per the Architectural and MEP Construction Issued Set of Plans, the existing four -inch waste water line shown is incorrect. After demolition of concrete and earth to dedicated location of six feet, the waste water line is a total of fifteen feet from location shown on plans. This change order serves purpose to execute properly and safely the waste water connection scope. There will be no delay in schedule. Change Order # to the contract- 01 Cost. $8,392.00 Total this Change Order: $8,392.00 04 C4.00 W -c- C,1-'rn.t1,-T YZ,o�; oa Contingency Original: Available Balance. (not including Change Order) $20,200.00 $15,305.04 Betterment Original: Available Balance: $5,000.00 $0.00 Zv//!a! Scd/®L gw &rgq-? t9e. nD Per the CORR Building Official the interior wall surface needed to be a non-absorbent material not specified in design or construction issued plans. Per ADA the men's restroom entry door needed to be changed for compliance approval. The waste water connection in men's restroom was inaccurate on the construction issued plans. The waste water line is 12 feet from shown location. These betterment items are critical path to obtain C of 0 and Final Inspections. The credits are from change in scopes and change in customer's needs. - City of Round Rock + Raac T; :�:--,c Agenda Item Summary r Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Prime Construction Company, Inc. for the Central Fire Station Restroom Addition Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 11/10/2017 Dept Director: Chad McDowell, General Services Director Cost: $8,392.00 indexes: 2017 General Obligation Bonds Attachments: !_AF - Quantity Adjustment -Change Order #1 with Prime Construction Company Inc. (00389190xA08F8), Change Order Department: General Services Department Text of Legislative File CM -2017-1536 Consider executing Quantity Adjustment/Change Order No. 1 with Prime Construction Company, Inc. for the Central Fire Station Restroom Addition Project. The purpose of this change order is to execute properly and safely the waste water connection scope. After the demolition of the concrete, the waste water line was a total of fifteen feet from location shown on plans. Cost: $8,392.00 Source of Funds: 2017 General Obligation Bonds City of Round Rack Page 1 Printed an 11/13/2017