R-09-12-17-8D1 - 12/17/2009RESOLUTION NO. R -09-12-17-8D1 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with S.D. Kallman, L.P. for the Egger Acres and Dennis Drive Improvements Project, and WHEREAS, S.D. Kallman, L.P. has submitted Supplemental Contract No. 2 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 2 with S.D. Kallman, L.P., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 2 to the Contract with S.D. Kallman, L.P., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 17th day of December, 2009. ATTEST: EA:al SARA L. WHITE, City Secretary O:\wdox\SCC1nt5\0112\0905\MUNICIPAL\R91217D1.DOC/rmc )1, ALAN MCGRAW, Mayor City of Round Rock, Texas STATE OF TEXAS COUNTY OF WILLIAMSON § § § EXHIBIT t D 2 III SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: S.D. KALLMAN, L.P. ADDRESS: 1106 S. Mays, Ste. 100, Round Rock, TX 78664 PROJECT: EGGER ACRES AND DENNIS DRIVE IMPROVEMENTS ("Engineer") This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and S.D. KALLMAN, L.P., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 8th day of September, 2005 for the Egger Acres and Dennis Drive Improvements Project in the amount of $156,853.41; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on February 29, 2008 to amend the scope of services and to increase the compensation by $25,908.88 to a total of $182,762.29; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $11,299.78 to a total of $194,062.07; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. 1I. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $11,299.78 the lump sum amount payable under the Contract for a total of $194,062.07, as shown by the attached Addendum to Exhibit D. Article 8, Project Team shall be amended as follows: City's Designated Representative for purposes of the Contract is amended as follows: Danny Halden, P.E., City Engineer 2008 Enterprise Drive Round Rock, TX 78664 Telephone: (512)218-6610 Fax: (512) 218-5563 Email: dhalden@round-rock.tx.us Engineer's Designated Representative for purposes of the Contract is amended as follows: Steven D. Kallman, P.E. 1106 S. Mays, Ste. 100 Round Rock, TX 78664 Telephone: (512) 218-4404 Fax: (512) 218-1668 Email: steve@sdkallman.com sdkallman.com IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. S.D. KALLMAN, L.P. 5 -revek b. KALLM/psi 4 G-)467.1.4. en v-ri4;j- ll- 30- 01 Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Alan McGraw, Mayor Stephan L. Sheets, City Attorney Date ADDENDUM TO EXHIBIT B ENGINEERING SERVICES The previously agreed-upon Engineering Services shall be revised as set forth below. The Engineer shall re -analyze the storm sewer system previously designed and revise the plans and project manual as necessary to provide for a storm sewer system that meets rather than exceeds current City of Round Rock drainage design criteria. Subsequent to the plans and project manual revisions, the Engineer shall provide services necessary for the City to re -bid the associated construction project, including but not limited to: ensuring a proper notification to bidders, conducting the bid opening, tabulating and analyzing the bids, researching the qualifications of one or more of the bidders, and recommending award of the associated construction contract. Construction Administration Phase services outstanding beyond September 11, 2009 shall be eliminated. Prior to invoicing the City as applicable for the services outlined above, the Engineer• shall deliver to the City two copies of the plans prepared by the Engineer. One shall be a mylar copy and the other an electronic copy in a format acceptable to the City. ADDENDUM TO EXHIBIT D Fee Schedule (Attached Behind This Page) ADDENDUM TO EXHIBIT D FEE SCHEDULE TASK ITEMS FEE REIMBURSABLE TOTAL Phase I: Preliminary Phase $ 297.46 $ 156.75 $ 119.01 40% Phase 1 $ 11,357.43 $ 6,049.67 $ 17,407.10 60% Phase I $ 17,036.15 $ 496.10 $ 17,532.25 Phase 11: Design Phase 30% Phase II $ 23,454.58 $ 7,092.80 $ 30,547.38 20% Phase 11 $ 15,636.39 $ 4,893.90 $ 20,530.29 25%Phase 11 $ I9,545.49 $ 496.10 $ 20,041.59 25% Phase 11 $ 19,545.49 $ 496.10 $ 20,041.59 SUPPLEMENTAL, CONTRACT NO. 1 Surveying $ 2,500.00 $ - $ 2,500.00 Engineering Services $ 23,408.88 $ - $ 23,408.88 SUPPLEMENTAL CONTRACT NO. 2 Engineering Services S 27,354.42 S 27,354.42 Phase III: Bidding Phase 60%Phase III $ 3,048.13 $ 1,736.35 $ 4,784.48 20% Phase 111 $ 1,016.04 $ 1,016.04 20% Phase llI $ 1,016.04 $ 1,016.04 SUPPLEMENTAL CONTRACT NO. 2 Bidding Services 5 2,666.00 $ 2,666.00 Phase IV: Construction Administration Phase 20% Phase IV $ 4,359.32 $ 2,140.05 $ 6,499.37 15% Phase IV $ 3,269.49 $ 3,269.49 15% Phase IV $ 3,269.49 $ 3,269.49 15% Phase IV $ 3,269.49 $ 3,269.49 15% Phase IV $ 3,269.49 $ 3,269.49 20% Phase IV $ 4,359.32 $ 4,359.32 SUPPLEMENTAL CONTRACT NO. 2 Deduct 78.21% of Phase IV $ (16,580.59) $ (2,140.05) $ (18,720.64) Total Project Cost $ 172,801.05 $ 21,261.02 $ 194,062,07 CLASSIFICATION TOTAL STANDARD RATE TOTAL EXPERT TESTIMONY RATE* Principal and Registered Professional Engineer Senior Engineer Project Manager $ 237.97 $ 125.40 $ 95.21 $ 297.46 $ 156.75 $ 119.01 aces are based on "Total Standard Rate" with a 1.25 multiplier. Page 1 of 2 ADDENDUM TO EXHIBIT D FEE SCHEDULE MANHOUR ESTIMATE Engineering Services: Phase I: Preliminary Phase Manhours Hourly Rate Hourly Rate Total Cost Principal and Registered Professional Engineer 3.0 38.0 $ 237.97 $ 9,042.86 Project Manager 46.0 124.0 $ 95.21 $ 11,806.04 Design Technician, including AutoCAD Station 0.0 60.0 $ 80.85 $ 4,851.00 Secretarial Personnel, including Word Processor 2.0 44.0 $ 61.22 $ 2,693.68 Sub -total Sub -total 266.0 $ 5,216.01 $ 28,393.58 Phase Ii: Design Phase Manhours Hourly Rate Hourly Rate Total Cost Principal and Registered Professional Engineer 3.0 92.0 $ 237.97 $ 21,893.24 Project Manager 46.0 246.0 $ 95.21 $ 23,421.66 Design Technician, including AutoCAD Station 0.0 352.0 $ 80.85 $ 28,459.20 Secretarial Personnel, Including Word Processor 2.0 72.0 $ 61.22 $ 4,407.84 Sub -total Sub -total 762.0 $ 5,216.01 $ 78,181.94 Supplemental #1 Principal and Registered Professional Engineer 4.0 $ 237.97 $ 951.88 Project Manager 100.0 $ 95.21 $ 9,521.00 Design Technician, Including AutoCAD Station 160.0 $ 80.85 $ 12,936.00 Secretarial Personnel, including Word Processor Sub -total 762.0 $ 61.22 $ 23,408.88 Supplemental #2 Sub -total 31.0 $ 2,666.00 Principal and Registered Professional Engineer Sub -total 33.0 $ 237.97 $ 7,853.01 Project Manager 86.0 $ 95.21 $ 8,188.06 Design Technician, including AutoCAD Station 121.0 $ 80.85 $ 9,782.85 Secretarial Personnel, including Word Processor 25.0 $ 61.22 $ 1,530.50 Sub -total 240.0 $ 27,354.42 Sub -total 1,764.0 $ 128,945.24 Phase til: Bidding Phase Manhours Hourly Rate Hourly Rate Total Cost Principal and Registered Professional Engineer 3.0 7.0 $ 237.97 $ 1,665.79 Project Manager 46.0 14.0 $ 95.21 $ 1,332.94 Design Technician, including AutoCAD Station 0.0 0.0 $ 80.85 $ - Secretarial Personnel, including Word Processor 2.0 34.0 $ 61.22 $ 2,081.48 Sub -total Sub -total 55.0 $ 5,216.01 $ 5,080.21 Supplemental #2 Principal and Registered Professional Engineer 3.0 $ 237.97 $ 713.91 Project Manager 7,0 $ 95.21 $ 666.47 Design Technician, including AutoCAD Station 0.0 $ 80.85 $ - Secretarial Personnel, including Word Processor 21.0 $ 61.22 $ 1,285.62 Sub -total 31.0 $ 2,666.00 Sub -total 86.0 $ 7,746.21 Phase IV: Construction Administration Phase Supplemental #2 Manhours Hourly Rate Total Cost Principal and Registered Professional Engineer 3.0 $ 237.97 $ 713.91 Project Manager 46.0 $ 95.21 $ 4,379.66 Design Technician, including AutoCAD Station 0.0 $ 80.85 $ - Secretarial Personnel, including Word Processor 2.0 $ 61.22 $ 122.44 Sub -total 51.0 $ 5,216.01 Page 2 of 2 DATE: December 8, 2009 SUBJECT: City Council Meeting — December 17, 2009 ITEM: 8D1. Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 1 with S.D. Kallman, LP for Egger Acres and Dennis Drive Improvements. Department: Engineering and Development Services Staff Person: Danny Halden, P.E., City Engineer Justification: The Engineer is requesting reimbursement for expenses incurred associated with revising the previously completed Engineering Services. The revisions included re -analyses and construction document changes, and subsequently included bidding services to re -bid the associated construction project. Upon initial bidding of the construction project, the bid price exceeded the City's available construction funds. Upon closer examination of the original drainage design after the initial bid, the City concluded that the storm sewer system was designed more conservatively than required by the City's drainage criteria. Therefore, the City requested that the storm sewer system be revised to meet rather than exceed the City's drainage criteria. While it is difficult to exactly determine, it appears that the revised drainage portion of the project could have been constructed with available funds. However, coincidentally the prevailing economic climate had significantly changed between the time the construction project was initially bid and the time it was re -bid. This resulted in the City having available funds to not only construct the drainage portion of the project but to perform street resurfacing that the City had originally desired to perform if funding was available. Therefore, it appears that the City realized prudent and significant economic benefit not solely from the Engineering Services revisions, but also due to the economic climate changes. While the Professional Services Contract appears to adequately address the difference between revisions that are compensable and those that are not, in this instance the Engineer did in fact willingly perform the revisions without protest or exhaustive discussion with the City about the Contract requirements. If Supplemental Agreement No. 2 is executed by both parties, the original Contract would be increased $30,020.42 for the services revisions (design and bidding services), which equates to approximately 50% of the costs the Engineer has stated were incurred due to the revisions. If Supplemental Agreement No. 2 is executed by both parties, Construction Administration Phase services will be reduced $18,720.64 to avoid unnecessary duplication and in effect will help defray costs of the aforementioned services revisions. Strategic Plan Relevance: 2.0 Prevent neighborhood deterioration. 4.0 Improve the aesthetics, development and redevelopment quality, and sustainability of the City. 29.0 Provide for effective management of storm water. Funding: Cost: Source of funds: Outside Resources: Public Comment: $11,299.78 2002 G.O. Bonds S. D. Kallman, LP N/A EXECUTED DOCUMENT FOLLOWS STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: S.D. KALLMAN, L.P. ("Engineer") ADDRESS: 1106 S. Mays, Ste. 100, Round Rock, TX 78664 PROJECT: EGGER ACRES AND DENNIS DRIVE IMPROVEMENTS This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and S.D. KALLMAN, L.P., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 8th day of September, 2005 for the Egger Acres and Dennis Drive Improvements Project in the amount of $156,853.41; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on February 29, 2008 to amend the scope of services and to increase the compensation by $25,908.88 to a total of $182,762.29; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $11,299.78 to a total of $194,062.07; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. I1. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $11,299.78 the lump sum amount payable under the Contract for a total of $194,062.07, as shown by the attached Addendum to Exhibit D. R- 01- L2-14 - 017r Article 8, Project Team shall be amended as follows: City's Designated Representative for purposes of the Contract is amended as follows: Danny Ha'den, P.E., City Engineer 2008 Enterprise Drive Round Rock, TX 78664 Telephone: (512)218-6610 Fax: (512) 218-5563 Email: dhalden@round-rock.tx.us Engineer's Designated Representative for purposes of the Contract is amended as follows: Steven D. Kallman, P.E. 1106 S. Mays, Ste. 100 Round Rock, TX 78664 Telephone: (512) 218-4404 Fax: (512) 218-1668 Email: steve@sdkallman.com IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. S.D. KALLMAN, L.P. By: �. 16./1- c-Nicsitdot Pare, cr 11- 30- 0? Date CITY OF ROUND ROCK APPR 0 VED AS TO FORM: By: 4.1 Alan McGraw, Mayor Stepha'i L. Sheets, City Attorney IL- II-- 09 Date ADDENDUM TO EXHIBIT B ENGINEERING SERVICES The previously agreed-upon Engineering Services shall be revised as set forth below. The Engineer shall re -analyze the storm sewer system previously designed and revise the plans and project manual as necessary to provide for a storm sewer system that meets rather than exceeds current City of Round Rock drainage design criteria. Subsequent to the plans and project manual revisions, the Engineer shall provide services necessary for the City to re -bid the associated construction project, including but not limited to: ensuring a proper notification to bidders, conducting the bid opening, tabulating and analyzing the bids, researching the qualifications of one or more of the bidders, and recommending award of the associated construction contract. Construction Administration Phase services outstanding beyond September 11, 2009 shall be eliminated. Prior to invoicing the City as applicable for the services outlined above, the Engineer shall deliver to the City two copies of the plans prepared by the Engineer. One shall be a mylar copy and the other an electronic copy in a format acceptable to the City. ADDENDUM TO EXHIBIT D Fee Schedule (Attached Behind This Page) ADDENDUM TO EXHIBIT D FEE SCHEDULE TASK ITEMS FEE REIMBURSABLE TOTAL Phase I: Preliminary Phase $ 237.97 $ 40% Phase 1 $ 11,357.43 $ 6,049.67 $ 17,407.10 60% Phase I $ 17,036.15 $ 496.10 $ 17,532.25 Phase 11: Design Phase $ 156.75 Project Manager 30% Phase II $ 23,454.58 $ 7,092.80 $ 30,547.38 20% Phase 11 $ 15,636.39 $ 4,893.90 $ 20,530.29 25% Phase 11 $ 19,545.49 $ 496.10 $ 20,041.59 25% Phase 11 $ 19,545.49 $ 496.10 $ 20,041.59 SUPPLEMENTAL CONTRACT NO. 1 Surveying $ 2,500.00 $ - $ 2,500.00 Engineering Services $ 23,408.88 $ - $ 23,408.88 SUPPLEIIIENTAL CONTRACT NO. 2 Engineering Services $ 27,354.42 $ 27,354.42 Phase 111: Bidding Phase 60%Phase III $ 3,048.13 $ 1,736.35 $ 4,784.48 20% Phase 11I $ 1,016.04 $ 1,016.04 20% Phase 111 $ 1,016.04 $ 1,016.04 SUPPLEMENTAL CONTRACT NO. 2 Bidding Services $ 2,666.00 $ 2,666.00 Phase IV: Construction Administration Phase 20% Phase IV $ 4,359.32 $ 2,140.05 $ 6,499.37 15% Phase IV $ 3,269.49 $ 3,269.49 15% Phase IV $ 3,269.49 $ 3,269.49 15% Phase IV $ 3,269.49 $ 3,269.49 15%Phase IV $ 3,269.49 $ 3,269.49 20% Phase IV $ 4,359.32 $ 4,359.32 SUPPLEMENTAL CONTRACT NO. 2 Deduct 78.21% of Phase IV $ (16,580.59) $ (2,140.05) $ (18,720,64) Total Project Cost $ 172,801.05 $ 21,261.02 $ 194,062.07 CLASSIFICATION TOTAL STANDARD RATE TOTAL EXPERT TESTIMONY RATE* Principal and Registered Professional $ 237.97 $ 297.46 Engineer Senior Engineer $ 125.40 $ 156.75 Project Manager $ 95.21 $ 119.01 es are based on "Total Standard Rate" with a 1.25 multiplier. Page 1 of 2 ADDENDUM TO EXHIBIT D FEE SCHEDULE MANHOUR ESTIMATE Enuineerinst Services: Phase I: Preliminary Phase Manhours Hourly Rate Hourly Rate Total Cost Principal and Registered Professional Engineer 3.0 38.0 $ 237.97 $ 9,042.86 Project Manager Sub -total 124.0 $ 95.21 $ 11,806.04 Design Technician, including AutoCAD Station 0.0 60.0 $ 80.85 $ 4,851.00 Secretarial Personnel, including Word Processor 2.0 44.0 $ 61.22 $ 2,693.68 Sub -total Sub -total 266.0 $ 5,216.01 $ 28,393.58 Phase II: Design Phase Manhours Hourly Rate Hourly Rate Total Cost Principal and Registered Professional Engineer 3.0 92.0 $ 237.97 $ 21,893.24 Project Manager Sub -total 246.0 $ 95.21 $ 23,421.66 Design Technician, including AutoCAD Station 0.0 352.0 $ 80.85 $ 28,459.20 Secretarial Personnel, including Word Processor 2.0 72.0 $ 61.22 $ 4,407.84 Sub -total Sub -total 762.0 $ 5,216.01 $ 78,181.94 Supplemental #1 Sub -total 86.0 $ 7,746.21 Principal and Registered Professional Engineer 4.0 $ 237.97 $ 951.88 Project Manager 100.0 $ 95.21 $ 9,521.00 Design Technician, including AutoCAD Station 160.0 $ 80.85 $ 12,936.00 Sub -total 762.0 $ 23,408.88 Supplemental #2 Principal and Registered Professional Engineer 33.0 $ 237.97 $ 7,853.01 Project Manager 86.0 $ 95.21 $ 8,188.06 Design Technician, including AutoCAD Station 121.0 $ 80.85 5 9,782.85 Secretarial Personnel, including Word Processor 25.0 $ 61.22 $ 1,530.50 Sub -total 240.0 $ 27,354.42 Sub -total 1,764.0 $ 128,945.24 Phase 111: Bidding Phase Manhours Hourly Rate Hourly Rate Total Cost Principal and Registered Professional Engineer Project Manager Design Technician, including AutoCAD Station Secretarial Personnel, including Word Processor 3.0 7.0 14.0 0.0 34.0 $ $ $ $ 237.97 95.21 80.85 61.22 $ 1,665.79 $ 1,332.94 5 - $ 2,081.48 Sub -total 55.0 95.21 $ 4,379.66 $ 5,080 21 Supplemental #2 0.0 $ 80.85 $ Secretarial Personnel, including Word Processor Principal and Registered Professional Engineer Project Manager Design Technician, including AutoCAD Station Secretarial Personnel, including Word Processor 2.0 3.0 7.0 0.0 21.0 $ $ $ $ 237.97 95.21 80.85 61.22 $ 713.91 $ 666.47 $ $ 1,285.62 Sub -total Sub -total 31.0 $ 5,216.01 $ 2,666.00 Sub -total 86.0 $ 7,746.21 Phase IV: Construction Administration Phase Supplemental #2 Manhours Hourly Rate Total Cost Principal and Registered Professional Engineer Project 3.0 $ 237.97 $ 713.91 Manager 46.0 $ 95.21 $ 4,379.66 Design Technician, including AutoCAD Station 0.0 $ 80.85 $ Secretarial Personnel, including Word Processor 2.0 $ 61.22 $ 122.44 Sub -total 51.0 $ 5,216.01 Page 2 of 2