R-10-01-14-8C1 - 1/14/2010RESOLUTION NO. R -10-01-14-8C1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Fazzone Construction Co., Inc. for the remodeling of the City Business Center Complex, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Fazzone Construction Co., Inc. for the remodeling of the City Business Center Complex, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. 0:\wdox\SCC]nts\0112\1005\MUNICIPAL\00179598.Doc/rmc RESOLVED this 14th day of January, 2010. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary EXHIBIT 1 / „A» Ra;en Rcx:k. it sn. rev. 12/09 Contract Quantity Adjustment/Change Order Department: Engineering and Development Services Project Business Center Complex Name: City Project AA30AMAIN ID Number: Date: Page 1 of 3 12/23/2009 Change Order/Quantity Adjustment No. 1 Justification: The Convention & Visitors Bureau office building located at 120 South Brown Street will be reloacted to the Business Center Complex. This change order will provide for finish -out of additional space to accommodate the relocation of the Covention & Visitors Bureau. SUMMARY Original Contract Price: Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to the this Change Order: Contract Time with All Approved Change Orders: Amount $1,232,000.00 $0.00 $133,334.00 $133,334.00 $0.00 $0.00 $0.00 $1,365,334.00 270 Calendar Days 0/0 Change 0.00% 10.82% 10.82% 270 Calendar Days 270 Calendar Days Prepared by: Contractor Approval: Architect Approvab Signa ure City Official Approval: Signattfrere Signature Larry Madsen, Construction Manager - City of Round Rock Bob Evans, Project Manager - Fazzone Construction Keith A. Hickman, KA Hickman Architects 4 -3 AI Date 12.2309 Date 8 cir, O � Date Signature Alan McGraw, Mayor Date rev. 12/09 Contract Quantity Adjustment/Change Order Chan • e Order Data Page 2 of 3 Bid Item# 1 Item Descri r tion and Change The Convention & Visitors Bureau Office building located at 120 South Brown Street will be relocated to the Business Center Complex. This change order will provide for finish -out of additional space to accommodate the relocation of the Convention & Visitors Bureau. Unit 1 Qty. 1 Unit Price $133,334.00 Amount $133,334.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 Contract Time Adjustment (Da s) 0 TOTALS: $133,334.00 0 NOUN D ROG: 1 LXAS rev. 12/09 Contract Quantity Adjustment/Change Order Quantity Adjustment Data Page 3 of 3 Bid Item# Item Description and Change Unit QtY. Unit Price 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: Amount $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Contract Time Adjustment (Days) 0 FAZZONE Change Request Proposal # 16.1 Fazzone Construction Co., Inc. 2008 Windy Terrace Cedar Park, TX. 78613 (512) 331-4484 Fax: (512) 335-3711 November 25, 2009 To: CITY OF ROUND ROCK 2008 ENTERPRISE ROUND ROCK, TEXAS 78664 Project: ROUND ROCK BUSINESS CENTER 231 EAST MAIN STREET ROUND ROCK, TEXAS 78664 These are prices are submitted per the attachments & referenced items: Reference ITEM TYPE ASI RFP RFI CRP Qty Unit Rate Price Bond Ins OHRP TOTALS VISITORS BUREAU MILLWORK 16.1 1 LF $6,250 $6,250 $81 $125 $625 $7,081 GLASS 16.1 1 LS $270 $270 $4 $5 $27 5306 DOORS 16.1 1 LF $2,459 $2,459 $32 $49 615 $3,155 HARDWARE 16.1 1 LF $1,120 $1,120 $15 $22 280 $1,437 DRYWALL & CEILING LABOR 16.1 1 LS $6,787 $6,787 $88 5136 $679 $7,690 DRYWALL & CEILING MATERIALS 16.1 1 LS $12,983 $12,983 $169 $260 3,246 $16,657 PAINTING WALLS 16.1 4905 SF $2 $7,358 $96 $147 1,840 $9,440 WALL TAPE ABOVE CEILING 16.1 1390 SF 50 $348 $5 $7 87 $446 PAINTING DOOR FRAMES 16.1 6 EA $50 $300 $4 $6 75 $385 FLOORS & TILE 16.1 1 LF $15,632 $15,632 $203 $313 $1,563 517,711 SIGN 16.1 1 LF $8,802 $8,802 $114 $176 2,201 $11,293 SPRINKLER 16.1 1 LF $3,200 $3,200 542 $64 $320 $3,626 MECHANICAL 16.1 1 LF $8,378 $8,378 $109 $168 $838 59,492 PLUMBING 16.1 1 LF $6,842 $6,842 $89 $137 $684 $7,752 FIRE ALARM 16.1 1 LF $1,836 $1,836 $24 $37 $184 $2,080 ELECTRICAL 16.1 1 LF $30,699 $30,699 $399 $614 $3,070 $34,782 TOTAL 5113,284 $1,472 $2,265 $16,332 $133,334 TIME Fazzone r< Robert EXTENSION REQUESTED: 0 DAYS ACCEPTED: Construction Co., Inc. !_ Architect: Owner N. Evans, Project Manager 42'-11 " / 5-5° 61-9' 14'-8" 5L5" 10'-8 ' / / / / 'V \ ., VISITOR'S CENTER 101 OFFICE 011011 __=, \ 102 T r \\.N,,----\\ _Q ry T ��- • = = •RRID in _ 103 . STORAGE 1 a- / 100 i / m Zil —' I BREAK p cl 1. 105 m DW OFFICE8 104 T m I, /' _ m R STORAGE , — 107 In OFFICE p 106 cc [A ,,/' ‘\, TITLE CITY OP ROUND 'WOK !BUSINESS CENTER VISITOR'S BUREAU DIMENSIONS DATE 12/O3/OQ JOB NO. KAH-0160.01 SHEET NO. I DETAIL NO. 1111.E CITY Or MOUND MOCK BUSINESS CENTER VISITOR'S OURE ) ENTRY ELEVATION DATE 12/O3/OQ JOB NO. KAH-0760.01 SHEET NO. 1 DETAIL NO. DATE: January 7, 2010 SUBJECT: City Council Meeting—January 14, 2010 ITEM: 8C1. Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 1 Fazzone Construction Co. for the remodeling of the City Business Center Complex. Department: Engineering and Development Services Staff Person: Tom Word, P.E., Chief of Public Works Operations Larry Madsen, Construction Manager Justification: The Convention & Visitors Bureau office building located at 120 South Brown Street will be relocated to the Business Center Complex due to the future construction of the Intermodal Transit and Parking Facility. This will provide a central location fronting Main Street for the Convention & Visitors Bureau and provide adequate space for their needs. This change order will provide for finish -out of additional space in the Business Center to accommodate the relocation of the Convention & Visitors Bureau. Strategic Plan Relevance: 20.0 Build and maintain the facilities needs to make the City attractive to businesses. 23.0 Develop public transportation plan. Funding: Cost: $133,334.00 Source of funds: 2002 GO Bonds & General Self Finance Construction Amount % Change Original Contract $1,232,000.00 N/A Previous Change Orders $0 0% Change Order No. 1 $133,334.00 10.82% Revised Contract $1,365,334.00 10.82% Outside Resources (if applicable): Fazzone Construction Public Comment (if applicable): EXECUTED DOCUMENT FOLLOWS rev. 12/09 Contract Quantity Adjustment/Change Order Department: Engineering and Development Services Project Business Center Complex Name: City Project AA30AMAIN ID Number: Date: Page 1 of 3 12/23/2009 Change Order/Quantity Adjustment No. 1 Justification: The Convention & Visitors Bureau office building located at 120 South Brown Street will be reloacted to the Business Center Complex. This change order will provide for finish -out of additional space to accommodate the relocation of the Covention & Visitors Bureau. SUMMARY Original Contract Price: Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to the this Change Order: Contract Time with All Approved Change Orders: Amount $1,232,000.00 $0.00 $133,334.00 $133,334.00 $0.00 $0.00 $0.00 $1,365,334.00 270 Calendar Days 0/0 Change 0.00% 10.82% 10.82% 270 Calendar Days 270 Calendar Days Prepared by: Contractor Approval: Architect Approval: Signature City Official Approval: ignature iR-to-O(i4-&.i Larry Madsen, Construction Manager - City of Round Rock Bob Evans, Project Manager - Fazzone Construction Keith A. Hickman, KA Hickman Architects Alan McGraw, Mayor i2 -23.x.7 Date 7-8 JPG C�"I Date Date rev. 12/09 Contract Quantity Adjustment/Change Order Change Order Data Bid Item# Item Descri tion and Change 1 The Convention & Visitors Bureau Office building located at 120 South Brown Street will be relocated to the Business Center Complex. This change order will provide for finish -out of additional space to accommodate the relocation of the Convention & Visitors Bureau. Unit 1 Q 1 Unit Price $133,334.00 Amount 0 $0.00 $133,334.00 $0.00 0 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 Page 2 of 3 Contract Time Adjustment (Da 9 TOTALS: $133,334.00 0 0 rev. 12/09 Contract Quantity Adjustment/Change Order Page 3 of 3 rd 6 .. G ^ ♦ . a VD as r➢I f ,6� �"'I"G iiµ 1 1 Bid Item# Item Description and Change Unit Qty.Unit Price Amount Contract Time Adjustment t (Days) ull' 4i }}"pirw ktPLi�iil� n�u �1 i t, xu 2 a Ir II bre xf , 0 yrc $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 I ,41.N4p- _ NI'^F,ylkivS4+�IGuN910b',"rte"4000, TOTALS: $0.00 0