Loading...
R-10-01-28-10E1 - 1/28/2010RESOLUTION NO. R -10 -O1 -28-10E1 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Jacobs Engineering Group Inc. for the Raw Water Barge and Pipeline for the Cedar Park/Round Rock/Leander Regional Water System Improvements Project, and WHEREAS, Jacobs Engineering Group Inc. has submitted Supplemental Contract No. 4 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 4 with Jacobs Engineering Group Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 4 to the Contract with Jacobs Engineering Group Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. O:\wdox\SCC1nts\0112\1005\MUNICIPAL\00180623.DOC/zmc RESOLVED this 28th day of January, 2010. ATTEST: SARA L. WHITE, City Secretary 2 ALAN MCGRAW, Mayor City of Round Rock, Texas STATE OF TEXAS COUNTY OF WILLIAMSON EXHIBIT 1,A„ SUPPLEMENTAL CONTRACT NO. 4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: JACOBS ENGINEERING GROUP INC. ("Engineer") ADDRESS: 2705 Bee Cave Road, Austin, Texas 78746-5688 PROJECT: Raw Water Barge and Pipeline for the Cedar Park / Round Rock / Leander Regional Water System Improvements This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the CITY OF ROUND ROCK, (hereinafter referred to as "Round Rock"), the CITY OF CEDAR PARK, (hereinafter referred to as "Cedar Park"), the CITY OF LEANDER, (hereinafter referred to as "Leander"), (all collectively referred to hereinafter as "Owners") and Jacobs Engineering Group Inc., (hereinafter called the "Engineer"). WHEREAS, the Owners and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 21st of December, 2006 for the Raw Water Barge and Pipeline for the Cedar Park / Round Rock / Leander Regional Water System Improvements Project in the amount of $1,216,112.00; and WHEREAS, the Owners and Engineer executed Supplemental Contract No. 1 on April 12, 2007 to modify the provisions for the scope of services and to increase the compensation by $2,192,067.00 to a total of$3,408,179.00; and WHEREAS, the Owners and Engineer executed Supplemental Contract No. 2 on September 13, 2007 to modify the provisions for the scope of services and to increase the compensation by $443,764.00 to a total of $3,851,943.00; and WHEREAS, the Owners and Engineer executed Supplemental Contract No. 3 on December 4, 2009 to modify the provisions for the scope of services and to increase the compensation by $333,463.00 to a total of $4,185,406.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $166,632.00 to a total of $4,352,038.00; and NOW THEREFORE, premises considered, the Owners and the Engineer agree that said Contract is amended as follows: Supplemental Contract 44 CORR Project #1\VA05TRVRAW 00179784/0199.4622 -El 1 Rev.10/08 84275 I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Project Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Exhibit D, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit D. II. Article 4, Compensation and Exhibit E, Fee Schedule shall be amended by increasing by $166,632.00 the lump sum amount payable under the Contract for a total of $4,352,038.00, as shown by the attached Addendum to Exhibit E. IN WITNESS WHEREOF, the Owners and the Engineer have executed this Supplemental Contract. Supplemental Contact #4 CORR Project #1VA05TRVRAW 00179784/0199.4622-E 1 [SIGNATURE PAGES FOLLOW] 2 Rev. 10/08 84275 CITY OF ROUND ROCK, TEXAS APPROVED AS TO FORM: By: Alan McGraw, Mayor ATTEST: By: Sara L. White, City Secretary Supplemental Contract #4 CORR Project #\A05TRVRAW 00179784/0199.4622-E1 3 Stephan L. Sheets, City Attorney Rev.10/08 84275 CITY OF CEDAR PARK, TEXAS APPROVED AS TO FORM: By: Brenda Eivens, City Manager ATTEST: By: LeAnn Quinn, City Secretary Supplemental Contract #4 CORR Project ii1VA05TRVRAw 00179784/0199.4622 -El 4 Charles Rowland, City Attorney Rev. 1 0/08 84275 CITY OF LEANDER, TEXAS APPROVED AS TO FORM: By: John Cowman, Mayor ATTEST: By: Debbie Haile, City Secretary Supplemental Contract #4 CORR Project #WAO5TRVRAIV 00179784/0199.4622-E1 5 Barney Knight, Attorney Rev. 10/0` 84275 JACOBS ENGINEERING GROUP INC. By: Kevin Nelson, '.E. Vice President Supplemental Contract #4 CORR Project #1VAO5TRVRA\V 00179784/0199.4622-E1 6 Rev.10/08 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: SCOPE OF WORK The objective of this supplemental agreement is to provide additional services for Raw Water System Construction Contract 1 (78 -inch pipeline), Contract 2 (36 -inch underwater pipeline) and Contact 3 (floating intake), which were not included in the original scope of services. Specific services included in this Supplemental Agreement No. 4 are described herein: A. Services Previously Performed 1. Seismic Survey. Perform seismic survey to determine silt depth and top of rock for location of underwater header for floating intake and underwater pipeline alignment. 2. Permitting Fees. Jacobs will pay the following permitting fees for permitting of the Phase 1, Contract 1 raw water system: a. Travis County Fees - $20,070.75 b. City of Austin Fees - $2,803.00 c. TCEQ Storm Water Fee - $350 3. Revisions to Raw Water Pipeline Contract 2 documents separating this construction contract into two separate construction contracts. The two construction contracts include: 1) A potential change order into the existing SJ Louis Contract (approx 1,200 I.f.) for the dry portion of the lake bed and 2) the remaining portion of Contract 2 will be an underwater pipeline from the terminus of the pipeline installed in the dry portion of the lake to the existing floating intake barge (approx. 2,000 l.f.) to be bid separately. 4. Additional Surveying Tasks a. Re-establish HorizontalNertical Control for Raw Water Pipeline Contract 1 Construction. b. Preparation of legal descriptions and exhibits for eight (8) additional easements for Contract 2 — 36 -inch Underwater Pipeline. B. Supplemental Design Services — Contracts 2 & 3 1. Radio Path Study. Perform radio path study from Cedar Park Water Treatment Plant (WTP) to the Cedar Park standpipe and then to the BCRUA Regional WTP. Provide draft and final report with final recommendations for equipment and tower requirements. Page 1 2. Floating Intake and Electrical Building Modifications. a. Perform re-design of the floating intake for a capacity of 17 MGD utilizing only the existing barge. Also, perform additional design of a new pumping system to serve the Twin Creeks Golf Course. b. Perform design modifications and additional design to accommodate the newly sized electrical building at a different location. Design includes structural design for a retaining wall, site work design, and minor electrical building modifications. Page 2 ADDENDUM TO EXHIBIT C Project Schedule The changes to the Project Schedule for this project are as follows: (Attached Behind This Page) i h 1" o,o • +QL5 1 1 4 4 ADDENDUM TO EXHIBIT D Work Schedule The changes to the Work Schedule for this project are as follows: (Attached Behind This Page) auiiadid a>fe;ui dasO - Z aseyd 3 0 N L0/S1/1.1 n41 fir SI i N 3 3 3 3 3Z-Wl uietry sueal N w 5 m Z 3 S m 0 t -WI wiry sued 8 weld ;uaw;eaal JateM ID 'ell tqi (")9> a A m33 O -; W Tr*R y i 3 c y o 5, O. c. i, D i. a _ o- o.O. <= 3. a o c 3 a 3 a f R j (2 N N (� in p fa W - O vaiu N N io m in 3 3 3 3 0 3 N 3 3 3 N' C 3 N' 0 4 4 3 3. 0 5 3 3 3 0 0 3. p3 g 3 3 0 N N • Y 6 (n o VI W 3 i G u � N a g r 90101iS PaM 8,j 8.d of �l 0, g2.1-1 a=1 m2.! mlL &I & ml UI a,1 3 n 3 - - W E E 07 l0 W o. z £. Fr;N o N � cOo o(3 3., 9 S' V o o 3. m m m m m o 0 m N a g, $ N @ u, • 0 N CD V E -4 _ 3 N14 6 3 r2 0. 0 W . Q 5 o m O a o O l y1 $ a 3 oJU ;ua6W uoi;ona;suo3 CO \! s 33 2) C m CO O D c 0 to ▪ 33 O. 01 sr c3 �° _m� 7 .6 V 41 o 7 p d n y cn fQy o 3 11 Via V'. CO V V P • N 3' 3 3'O 0 0 3 3 3 3 3 0 7 3• 'S 5 ! (2 (9 (3 u a 5 u u 5 J T o .5. d �. • r N Vf V a a a( J 0 R : 5 0. n A. N C' • may. a N ,(V o 3 o50— a V ▪ u R 2 f2N N $ m rn ZL/81/9 uoV c� CD L { s g 1vI L1 5 I L rg ADDENDUM TO EXHIBIT E Fee Schedule The changes to the Fee Schedule for this project are as follows: (Attached Behind This Page) oco 0 O CD CD SlX7986L -00 (Grand Total: Original Contract + Supp Agreement No. 1, 2, 3 & 4 Original Contract Amount Supp Agreement No. 1 Supp Agreement No. 2 Supp Agreement No. 3 G ,�$ u 7 ,5: s r;; o r ; 3 y. C I f yin c _T. F le Total Hours N � W Q w A W O Q v N_,. D, 1 Supplemental Item Description Sub -Total Hours Radio Path Study Floating Intake and Electrical Building Modifications (Contract 3) Supplemental) Design Services - Contracts 2 and 3 Sub -Total Hours Seismic Survey Permitting Fees Travis Co City of Austin TCEQ Stormwater Fee Contract 2 Design Revisions Additional Surveying Tasks Re-establish HorizontalNertical Control (Contract 1) Additional Easements (Contract 2) (Services Previously Performed t Agreement No. 4 y` CO N N $ 374 V A I N $ 1,308 Project Manager . t N V NN iD vl O A -P. W m Senior Project Engineer v N N $ 3,2851 1 54 CT A Project Engineer V }fv 40 A A O EA r a Structural Engineer - `$ 24001 O m M N 0 ER Electrical Engineer a � N N I _ co V Landscape Architect rq N co 1 56 1 $ 6,338 1 CI ADD Designer aA A i $ 2531 0 i n LI Eif $ 16,8451 fo o 69 . Eo Eo 69 Eo Eo Eo f M m jV w Surveying • - N Crof (Ji $ 1,242 $ 15,581 $ 16,824 j M v V N V M r W CO 0 M . a Of A N cm Eo . EA . Eo 69 . Eo t0 $ 36,4931 Total Jacobs Eo W I CO ' $ 37,9891 fR = I X Ls7'i 318`,5, N COM $ 23,867 M CH2M Hill $27,486 N Terrasond sN+. 4xlT 4,` $ 23,867 $ 37,989 -.• N (fl -EA (ii Efl Eo (o Eo . CA N V A co VI N V A co Total Subs 1�4'y '' t, G9 0 N 69 0 69 O 69 W 69 -• 1 $ 23,724 $ 50 Expenses G1 IQ Co W CO $ 1,216,112 $ 2,192,067 $ 443,764 $ 333,463 • •� q _ u' f j Eo co N 0 $ 25,109 I y, coV W O $ 1,390 $ 18,177 $ 3501 $ 16,455 Eo N co W 69 I O 5 87,702 $ _ 28,457 Total Services m m m Z m cn c M m o vm C r mCo m ADDENDUM TO EXHIBIT E (Page 2) Fee Schedule BCRUA FLOATING INTAKE AND RAW WATER PIPELINE (Phase 1) Dec -09 HOURLY SUMMARY Table 2 of 3 — RAW COST Employee Hours Salary Direct Labor Cost Category PM 9 $71 $639 Sr. PE 25 $66 $1,650 PE 78 $52 $4,056 Struct/Elect PE 56 $57 $3,192 Landscape Arch. 12 $50 $600 CADD Designer 72 $43 $3,096 RPLS 24 $55 $1,320 Field Party — 2 man 11 $48 $528 Field Party — 3 man 64 $60 $3,840 Survey CAD Tech 40 $31 $1,240 Clerica]IAcct 4 $24 $96 Phase Subtotal $20,257 MAXIMUM COST Table 3 of 3 - LABOR COST Labor Overhead Total -Labor Fixed Fee- Total Cost Percent Plus Overhead Percent Phase 2 — Deep $20,257 135% $47,604 12% $53,316 Intake Due Diligence DIRECT COST Expense Rate Quantity Total Sub Consultants $89,342 1 $89,342 Expenses Miscellaneous $200 1 Job $200 Permitting Fees $23,224 1 Job $23,224 Printing $330 1 Job $330 Travel $0.55 400 miles $220 Total Expenses $23,974 Total Direct Costs $113,316 Total Maximum Costs $166,632 Page 2 of 2 DATE: January 21, 2010 SUBJECT: City Council Meeting—January 28, 2010 ITEM: 10E1. Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 4 with Jacobs Engineering Group, Inc. regarding the Raw Water Barge and Pipeline for the Cedar Park/Round Rock/Leander Regional Water System Project. Department: Staff Person: Justification: Water and Wastewater Utilities Michael Thane, Director of Utilities This Supplemental Agreement No. 4 is for additional services associated with the Raw Water Barge and Pipeline project for the Brushy Creek Regional Utility Authority. These additional services include performing a Seismic Survey, various permitting fees, revisions to Raw Water Pipeline Contract 2 documents separating the Construction Contract into two separate Construction Contracts, a Radio Path Survey and Analysis, Floating Intake and Electrical Building modifications, and other necessary professional services. The total cost of Jacobs Engineering's contract, including this Supplemental Agreement No. 4, would be $3,135,926 which is 6.4% of the estimated construction cost of $49,000,000. The costs are allocated to the Cities based on their capacity in the pipeline. Round Rock's share would be $1,209,213.03 which is 38.56% of the total contract cost. Supplemental Agreement No. 4 cost is $166,632. Strategic Plan Relevance: Public Health and Safety Strategic Initiative Goal No. 27.0 Ensure there is an adequate, affordable and safe water supply. Funding: Cost: $166,632 (Round Rock's share is $64,253.30) Source of funds: Regional Water Fund Outside Resources: Jacobs Engineering Group, Inc. City of Cedar Park City of Leander Public Comment: N/A EXECUTED DOCUMENT FOLLOWS STATE OF TEXAS § COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: JACOBS ENGINEERING GROUP INC. ("Engineer") ADDRESS: 2705 Bee Cave Road, Austin, Texas 78746-5688 PROJECT: Raw Water Barge and Pipeline for the Cedar Park / Round Rock / Leander Regional Water System Improvements This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the CITY OF ROUND ROCK, (hereinafter referred to as "Round Rock"), the CITY OF CEDAR PARK, (hereinafter referred to as "Cedar Park"), the CITY OF LEANDER, (hereinafter referred to as "Leander"), (all collectively referred to hereinafter as "Owners") and Jacobs Engineering Group Inc., (hereinafter called the "Engineer"). WHEREAS, the Owners and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 21st of December, 2006 for the Raw Water Barge and Pipeline for the Cedar Park / Round Rock / Leander Regional Water System Improvements Project in the amount of $1,216,112.00; and WHEREAS, the Owners and Engineer executed Supplemental Contract No. 1 on April 12, 2007 to modify the provisions for the scope of services and to increase the compensation by $2,192,067.00 to a total of $3,408,179.00; and WHEREAS, the Owners and Engineer executed Supplemental Contract No. 2 on September 13, 2007 to modify the provisions for the scope of services and to increase the compensation by $443,764.00 to a total of $3,851,943.00; and WHEREAS, the Owners and Engineer executed Supplemental Contract No. 3 on December 4, 2009 to modify the provisions for the scope of services and to increase the compensation by $333,463.00 to a total of $4,185,406.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $166,632.00 to a total of $4,352,038.00; and NOW THEREFORE, premises considered, the Owners and the Engineer agree that said Contract is amended as follows: Supplemental Contract 44 CORR Project AVA05TRVRAw 00179784/0199.4622 -El 1 QZ tO Rev. I0/08 84275 1. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Project Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Exhibit D, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit D. II. Article 4, Compensation and Exhibit E, Fee Schedule shall be amended by increasing by $166,632,00 the lump sump amount payable under the Contract for a total of $4,352,038.00, as shown by the attached Addendum to Exhibit E. IN WITNESS WHEREOF, the Owners and the Engineer have executed this Supplemental Contract. Supplemental Contract #4 CORR Project #WAO5TRVRAw 00179784/0199.4622-E1 [SIGNATURE PAGES FOLLOW] 2 Rev.10/08 84275 CITY OF ROUND ROCK, TEXAS By: Alan McGraw, Mayor ATTEST: By: Sara L. White, City Secretary Supplemental Contract #4 CORR Project #WAO5TRVRAW 00179784/0199.4622 -El 3 APPROVED AS TO FORM: Stephan L. Sheets, City Attorney Rev.10/08 84275 CITY OF CEDAR PARK, TEXAS APPROVED AS TO FORM: B y: � �d re7j �,� �✓�; Brenda Eivens, City Manager Charles Rowland, City Attorney ATTEST: LeAnn uinn, City Secretary Supplemental Contract #4 CORR Project #lWAOSTRVRAW 00179784/0199.4622 -El 4 12. -(0 -0L -2o- toe) Rev. 10/08 84275 CITY OF LEANDER, TEXAS APPROVED AS TO FORM: By: n Cowman, Mayor ATTEST: By: Deb )ie Haile, City Secretary 1:'.opp1en1fmtal ContrnEl.''; CORR Piojeet liWAO5TRVI:AW 0017978,1/0199.4622-E1 5 Barney Knight, Attorney :te,v g1275 JACOBS ENGINEERING GROUP INC. By: Kevin Nelson, ' ,E, Vice President Supplemental Contract #4 CORR Project #WAO5TRVRAW 00179784/0199.4622-E1 6 Rev.10/08 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: SCOPE OF WORK The objective of this supplemental agreement is to provide additional services for Raw Water System Construction Contract 1 (78 -inch pipeline), Contract 2 (36 -inch underwater pipeline) and Contact 3 (floating intake), which were not included in the original scope of services. Specific services included in this Supplemental Agreement No. 4 are described herein: A. Services Previously Performed 1. Seismic Survey. Perform seismic survey to determine silt depth and top of rock for location of underwater header for floating intake and underwater pipeline alignment. 2. Permitting Fees. Jacobs will pay the following permitting fees for permitting of the Phase 1, Contract 1 raw water system: a. Travis County Fees - $20,070.75 b. City of Austin Fees - $2,803.00 c. TCEQ Storm Water Fee - $350 3. Revisions to Raw Water Pipeline Contract 2 documents separating this construction contract into two separate construction contracts. The two construction contracts include: 1) A potential change order into the existing SJ Louis Contract (approx 1,200 I.f.) for the dry portion of the lake bed and 2) the remaining portion of Contract 2 will be an underwater pipeline from the terminus of the pipeline installed in the dry portion of the lake to the existing floating intake barge (approx. 2,000 I.f.) to be bid separately. 4. Additional Surveying Tasks a. Re-establish HorizontalNertical Control for Raw Water Pipeline Contract 1 Construction. b. Preparation of legal descriptions and exhibits for eight (8) additional easements for Contract 2 — 36 -inch Underwater Pipeline. B. Supplemental Design Services — Contracts 2 & 3 1. Radio Path Study. Perform radio path study from Cedar Park Water Treatment Plant (WTP) to the Cedar Park standpipe and then to the BCRUA Regional WTP. Provide draft and final report with final recommendations for equipment and tower requirements. Page 1 2. Floating Intake and Electrical Building Modifications. a. Perform re -design of the floating intake for a capacity of 17 MGD utilizing only the existing barge. Also, perform additional design of a new pumping system to serve the Twin Creeks Golf Course. b. Perform design modifications and additional design to accommodate the newly sized electrical building at a different location. Design includes structural design for a retaining wall, site work design, and minor electrical building modifications. Page 2 ADDENDUM TO EXHIBIT C Project Schedule The changes to the Project Schedule for this project are as follows: (Attached Behind This Page) i h 1" o,o • +QL5 1 1 4 4 ADDENDUM TO EXHIBIT D Work Schedule The changes to the Work Schedule for this project are as follows: (Attached Behind This Page) auiiadid a>fe;ui dasO - Z aseyd 3 0 N L0/S1/1.1 n41 fir SI i N 3 3 3 3 3Z-Wl uietry sueal t -WI wiry sued 8 weld ;uaw;eaal JateM ID 'ell tqi (")9> a A m33 O -; W Tr*R y i 3 c y o 5, O. c. i, D i. a _ o- o.O. <= 3. a o c 3 a 3 a f R j (2 N N (� in p fa W - O vaiu N N io m in 3 3 3 3 0 3 N 3 3 3 N' C 3 N' 0 4 4 3 3. 0 5 3 3 3 0 0 3. p3 g 3 3 0 N N • Y 6 (n o VI W 3 i G u � N a g r 90101iS PaM 8,j 8.d of �l 0, g2.1-1 a=1 m2.! mlL &I & ml UI a,1 3 n 3 - - W E E 07 l0 W o. z £. Fr;N o N � cOo o(3 3., 9 S' V o o 3. m m m m m o 0 m N a g, $ N @ u, • 0 N CD V E -4 _ 3 N14 6 3 r2 0. 0 W . Q 5 o m O a o O l y1 $ a 3 oJU ;ua6W uoi;ona;suo3 CO \! s 33 2) C m CO O D c 0 to ▪ 33 O. 01 sr c3 �° _m� 7 .6 V 41 o 7 p d n y cn fQy o 3 11 Via V'. CO V V P • N 3' 3 3'O 0 0 3 3 3 3 3 0 7 3• 'S 5 ! (2 (9 (3 u a 5 u u 5 J T o .5. d �. • r N Vf V a a a( J 0 R : 5 0. n A. N C' • may. a N ,(V o 3 o50— a V ▪ u R 2 f2N N $ m rn ZL/81/9 uoV c� CD L { s g 1vI L1 5 I L rg ADDENDUM TO EXHIBIT E Fee Schedule The changes to the Fee Schedule for this project are as follows: (Attached Behind This Page) oco 0 O CD CD SlX7986L -00 (Grand Total: Original Contract + Supp Agreement No. 1, 2, 3 & 4 Original Contract Amount Supp Agreement No. 1 Supp Agreement No. 2 Supp Agreement No. 3 G ,�$ u 7 ,5: s r;; o r ; 3 y. C I f yin c _T. F le Total Hours N � W Q w A W O Q v N_,. D, 1 Supplemental Item Description Sub -Total Hours Radio Path Study Floating Intake and Electrical Building Modifications (Contract 3) Supplemental) Design Services - Contracts 2 and 3 Sub -Total Hours Seismic Survey Permitting Fees Travis Co City of Austin TCEQ Stormwater Fee Contract 2 Design Revisions Additional Surveying Tasks Re-establish HorizontalNertical Control (Contract 1) Additional Easements (Contract 2) (Services Previously Performed t Agreement No. 4 y` CO N N $ 374 V A I N $ 1,308 Project Manager . t N V NN iD vl O A -P. W m Senior Project Engineer v N N $ 3,2851 1 54 CT A Project Engineer V }fv 40 A A O EA r a Structural Engineer - `$ 24001 O m M N 0 ER Electrical Engineer a � N N I _ co V Landscape Architect rq N co 1 56 1 $ 6,338 1 CI ADD Designer aA A i $ 2531 0 i n LI Eif $ 16,8451 fo o 69 . Eo Eo 69 Eo Eo Eo f M m jV w Surveying • - N Crof (Ji $ 1,242 $ 15,581 $ 16,824 j M v V N V M r W CO 0 M . a Of A N cm Eo . EA . Eo 69 . Eo t0 $ 36,4931 Total Jacobs Eo W I CO ' $ 37,9891 fR = I X Ls7'i 318`,5, N COM $ 23,867 M CH2M Hill $27,486 N Terrasond sN+. 4xlT 4,` $ 23,867 $ 37,989 -.• N (fl -EA (ii Efl Eo (o Eo . CA N V A co VI N V A co Total Subs 1�4'y '' t, G9 0 N 69 0 69 O 69 W 69 -• 1 $ 23,724 $ 50 Expenses G1 IQ Co W CO $ 1,216,112 $ 2,192,067 $ 443,764 $ 333,463 • •� q _ u' f j Eo co N 0 $ 25,109 I y, coV W O $ 1,390 $ 18,177 $ 3501 $ 16,455 Eo N co W 69 I O 5 87,702 $ _ 28,457 Total Services m m m Z m cn c M m o vm C r mCo m ADDENDUM TO EXHIBIT E (Page 2) Fee Schedule BCRUA FLOATING INTAKE AND RAW WATER PIPELINE (Phase 1) Dec -09 HOURLY SUMMARY Table 2 of 3 — RAW COST Employee Hours Salary Direct Labor Cost Category PM 9 $71 $639 Sr. PE 25 $66 $1,650 PE 78 $52 $4,056 Struct/Elect PE 56 $57 $3,192 Landscape Arch. 12 $50 $600 CADD Designer 72 $43 $3,096 RPLS 24 $55 $1,320 Field Party — 2 man 11 $48 $528 Field Party — 3 man 64 $60 $3,840 Survey CAD Tech 40 $31 $1,240 Clerica]IAcct 4 $24 $96 Phase Subtotal $20,257 MAXIMUM COST Table 3 of 3 - LABOR COST Labor Overhead Total -Labor Fixed Fee- Total Cost Percent Plus Overhead Percent Phase 2 — Deep $20,257 135% $47,604 12% $53,316 Intake Due Diligence DIRECT COST Expense Rate Quantity Total Sub Consultants $89,342 1 $89,342 Expenses Miscellaneous $200 1 Job $200 Permitting Fees $23,224 1 Job $23,224 Printing $330 1 Job $330 Travel $0.55 400 miles $220 Total Expenses $23,974 Total Direct Costs $113,316 Total Maximum Costs $166,632 Page 2 of 2