R-10-02-11-8D2 - 2/11/2010RESOLUTION NO. R -10-02-11-8D2 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Fazzone Construction Co., Inc. for the remodeling of the City Business Center Complex, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Fazzone Construction Co., Inc. for the remodeling of the City Business Center Complex, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. 0:\wdox\SCClnts\0112\1005\MUNICIPAL\00181962.DOC/rmc RESOLVED this llth day of February, 2010. ATTEST: //t44A/L. tAkict SARA L. WHITE, City Secretary 2 MCGRAW, Mayor City of Round Rock, Texas EXHIBIT I / rev. 1/10 Contract Quantity Adjustment/Change Order Department: Engineering and Development Services Project Name: Business Center Complex City Project ID Number: AA30AMAIN Justification Date: Page 1 of 3 1/22/2010 Change Order/Quantity Adjustment No. 2 This change order will provide for finish out of the four existing spaces totaling 6,075 square feet in the Business Center Project. Ceiling tile, flooring, lighting, wall boards, paint and air conditioning will be complete in Suites # 128, 129, 223 and 234. The cost comes out to $17.10 per square foot to finish out. SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Amount $1,232,000.00 $1,232,000.00 $133,334.00 $103,924.00 $237,258.00 $0.00 $0.00 $0.00 $1,469,258.00 270 Calendar Days 0/0 Change 10.82% 8.44% 19.26% 270 Calendar Days 300 Calendar Days Prepared by: Contractor Approval: Architect Approval: Signature Signature City Official Approval: Larry Madsen, Construction Manager - City of Round Rock / 22 -Z) 10 Pentad Name, Title and Company Date l- 22. -20ib Bob Evans, Project Manager - Fazzone Construction Printed Name, Tile and Company Keith A. Hickman, KA Hickman Architects Printed Name and The Alan McGraw, Mayor Date '---01-,A01Date 0 Signature Printed Name and Ttie Date rev. 01/10 Contract Quantity Adjustment/Change Order Chan e Order Data Page 2 of 3 Bid Item* Item Description and Cha Unit Unit Price Amount Contract Time Adjustment (Days 1 This change order will provide for finish out of the four existing spaces totaling 6,075 square feet in the Business Center Project.Og|ingU|e,Uoming,|�hb�� wall boards, pmtand»Urcondibcning will becomplete |nSuites #128,1294 223 and 234. The cost comes out to $o.1Vper square foot to finish out. 1 1 $103,924.00 $103,924.00 30 0 $0.00 $0.00 0 $O00 ' $O00 ' 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 D $0.00 $0.00 O $&OO $0.00 U $0.00 $0.00 U $0.00 $0.00 O $0.00 $0.00 D $0.00 $0.00 U $0.00 $0.00 O $0.00 $0.00 0 $0'00 $0.00 O $0'00 $0.00 0 $O.00 $0.00 U $0.00 $0.00 8 $0'00 $0.00 p $0.00 $O.00 O $0.00 $0.00 0 *D.DO $0.00 O $0.00 $0.00 O $0.00 $0.00 O $0.00 $0.00 O $0.00 $0.00 U ¢O'OD $0.00 O $0.00 $0.00 O $0.00 $0.00 0 $0.00 $0.00 TOTALS: $103,924^00 30 rev. 01/10 Contract Quantity Adjustment/Change Order uanti Page 3 of 3 TOTALS: 0 - ' . - -_- - - - - Bid Item# Item Description Unit ty. Unit Price Amount Contract Time Adjustment (Days) U $U.0O $O.O0 O $0.00 $O.00 O $Q'OQ $O.00 O $B.O8 $O.8O V sloo $0.O0 O $0.00 $O.0O O $o.o0 $O.00 o Vim $0.00 o $O.Oo $O.00 O $0.00 $U.00 O $0.00 $O.O0 D $0.00 $O.O0 U $0.00 $0.00 O $0.00 $8.U0 D Woo $0.00 O $0.00 $0.00 o $O'OQ $0.00 O $O'OO $O.O0 o $D'OO $0.00 D so.o0 $0.00 O $O.00 $O.O0 O *8'DQ s0.00 o $U'DD $0.00 U so.O0 $0.00 o $O'OO $O.00 o $D.oO s0.0O O $D'OO $0.00 O $O'DO $O.00 O $0'00 $0.O0 O $U.00 $0.UO O $O.UO TOTALS: 0 FAZZONE January 20, 2010 To: CITY OF ROUND ROCK 2008 ENTERPRISE ROUND ROCK, TEXAS 78664 These are prices are submitted per the attachments & referenced iterrrs: ITEM ASI Change Request Proposal # 35 Fauzone Construction Co., Inc. 2008 Windy Terrace Cedar Padc, TX. 78613 (512) 331-4484 Fax (512) 335-3711 Project ROUND ROCK BUSINESS CENTER 231 EAST MAIN STREET ROUND ROCK, TEXAS 78664 Reference RFP SUITE 128 DRYWALL & CEIUNG LABOR DRYWALL & CEIUNG MATERIALS RFI CRP Qty Unit Rate Price Bond Ins OH/P TOTALS 35 PAINTING 35 FLOORS & TILE SPRINKLER 35 35 MECHANICAL ELECTRICAL 35 35 35 SUITE 223 DRYWALL & CEILING LABOR DRYWALL & CEILING MATERIALS 35 35 726 1 1050 1 1 1 1 SF LS SF LS LS LS LS 1600 1 SF LS *1.10 $1,529 *1.50 $799 81 529 81 575 $2.683 8660 $2.219 $6,125 52,683 *660 $2,219 $6 125 *10 $20 820 $35 $16 *31 $32 8200 8382 *394 $1,025 $1.962 *2,021 $9 $29 *54 *13 *44 *268 $66 83.040 $748 8222 $2.514 81.10 $3.236 81.760 $3.236 $80 *123 *0 $613 $6,940 $23 $35 $440 *2,258 PAINTING FLOORS & TILE 35 35 SPRINKLER MECHANICAL 35 ELECTRICAL 35 35 1650 1 1 1 1 SF LS LS LS LS *1.50 $5,028 $1 540 84.006 $6.275 $2,475 $5.028 *1.540 $4.006 $6.275 $42 $32 $65 $20 852 $82 $65 $50 8101 $31 880 *126 $809 $619 *503 *154 $401 $4,152 83,175 $5.697 $1,745 $4,539 $628 $7,110 TIME EXTENSION REQUESTED: 0 DAYS Fauone Construction Co., Inc Robert N. Evans, Project Manager Architect t Owner $46,924 FA 77O TE 1 �► j Change Request Proposal # 18 Fazzone Construction Co., Inc. 2008 Windy Terrace Cedar Park, TX 78613 (512) 331-4484 Fax (512) 335-3711 November 18, 2009 To: CITY OF ROUND ROCK 2008 ENTERPRISE ROUND ROCK, TEXAS 78664 Project ROUND ROCK BUSINESS CENTER 231 EAST MAIN STREET ROUND ROCK, TEXAS 78664 These are prices are shed per the attachments & referenced items: Reference ITEM TYPE ASI RFP RFI CRP City Unit Rate Price Bond Ins OH/P TOTALS SUITE 129 DRYWALL & CEILING LABOR 18 1141 SF 51.10 51,255 16 25 314 51,610 DRYWALL & CEILING MATERIALS 18 1 LS 52,330.40 52,330 30 47 583 52,989 PAINTING 18 1572 SF 51.50 52,358 31 47 590 $3,025 FLOORS & TILE 18 1 LS $4,795.00 54,795 62 86 480 $5,433 SPRINKLER 18 1 LS $2,949.00 $2,949 38 59 295 53,341 MECHANICAL 18 1 LS 51,467.00 $1,467 19 29 147 51,662 ELECTRICAL 18 1 LS 56,188.00 56,188 80 124 619 57,011 SUITE 234 DRYWALL & CEUJNG LABOR 18 1807 SF 51.10 $1,988 26 40 497 $2,551 DRYWALL& CEILING MATERIALS 18 1 LS $3,63120 53,631 47 73 908 $4,659 PAINTING t. 18 1759 SF 51.50 52,639 34 53 660 $3,386 FLOORS & TILE 18 1 LS 56,726.00 $6,726 87 135 673 57,621 SPRINKLER 18 1 LS $3,455.00 53,455 45 69 346 $3,915 MECHANICAL- 18 1 LS 51,467.00 51,467 19 29 147 $1,662 ELECTRICAL 18 1 LS 57,181.00 $7,181 93 144 718 $8,136 TOTAL $48,429 5630 $969 $6,973 557,000 TIME fazzone Robert EXTENSION REQUESTED: 0 DAYS ACCEPTED: Consauc6on Co_, Inc. Arra Owner N. Evans, Project Manager DATE: February 4, 2010 SUBJECT: City Council Meeting— February 11, 2010 ITEM: 8D2. Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 2 with Fazzone Construction, Inc. for the remodel of the City Business Center Complex. Department: Engineering and Development Services Staff Person: Tom Word, P.E., Chief of Public Works Operations Larry Madsen, Construction Manager Justification: This change order will provide for finish out of the four existing spaces totaling 6,075 square feet in the Business Center Project. Ceiling tile, flooring, lighting, wall boards, paint and air conditioning will be completed in Suites # 128, 129, 223 and 234. The cost comes out to $17.10 per square foot for finish out. Strategic Plan Relevance: 20.0 Build and maintain the facilities needs to make the City attractive to businesses. Funding: Cost: $103,924.00 Source of funds: 2002 GO Bonds & General Self Finance Construction Outside Resources: Fazzone Construction Public Comment: N/A Amount % Change Original Contract $1,232,000.00 N/A Previous Change Orders $133,334.00 10.82% Change Order No. 2 $103,924.00 8.44% Revised Contract $1,469,258.00 19.26% Outside Resources: Fazzone Construction Public Comment: N/A EXECUTED DOCUMENT FOLLOWS Contract Quantity Adjustment/Change Order rev. 1/10 Department: Engineering and Development Services Project Name: Business Center Complex City Project ID Number: AA30AMAIN Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 1/22/2010 2 This change order will provide for finish out of the four existing spaces totaling 6,075 square feet in the Business Center Project. Ceiling tile, flooring, lighting, wall boards, paint and air conditioning will be complete in Suites # 128, 129, 223 and 234. The cost comes out to $17.10 per square foot to finish out. SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by: Contractor Approval: Architect Approval: /lfe4e.,y Signatures and Approvals S' ature City Official) /A Approval:00,0 Signature t2 - �U-��-t� �2-- Amount $1,232,000.00 $1,232,000.00 % Change $133,334.00 10.82% $103,924.00 8.44% $237,258.00 19.26% $0.00 $0.00 $0.00 $1,469,258.00 270 Calendar Days 270 Calendar Days 300 Calendar Days Larry Madsen, Construction Manager - City of Round Rock Printed Name, Title and Company Bob Evans, Project Ma .. , - Fazzone Construction Printed Name, The and ComPam, Keith A. Hickman, KA Hickman Architects Printed Name and The Alan McGraw, Mayor Printed Name and Title /-22-200 Date Date Hal--e/--?A0 I 0 Date 2.1(.2010 Date 4 Contract Quantity Adjustment/Change Order rev. 01/10 Page 2 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 This change order will provide for finish out of the four existing spaces totaling 6,075 square feet in the Business Center Project. Ceiling tile, flooring, lighting, wall boards, paint and air conditioning will be complete in Suites # 128, 129, 223 and 234. The cost comes out to $17.10 per square foot to finish out. 1 1 $103,924.00 $103,924.00 30 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $o.00 $0.00 0 $0.00 $0.00 0 $o.00 $0.00 0 $0.00 $0.00 0 $o.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 o $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTALS: $103,924.00 30 Contract Quantity Adjustment/Change Order rev. 01/10 Page 3 of 3 TOTALS: $0.00 0 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 0 $0.00 $0.00 0 $0.00 $0.00 o $0.00 $0.00 0 $0.00 $0.00 o $0.00 $0.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $0.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $0.00 $0.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $0.00 $0.00 o $o.00 $o.00 o $o.00 $o.00 o $0.00 $o.00 o $0.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 0 $0.00 $0.00 TOTALS: $0.00 0 FAZZONE November 18, 2009 To: CITY OF ROUND ROCK 2008 ENTERPRISE ROUND ROCK, TEXAS 78664 Change Request Proposal # 18 These are prices are submitted per the attachments & referenced items: ITEM Fazzone Construction Co., Inc. 2008 Windy Terrace Cedar Park, TX. 78613 (512) 331-4484 Fax (512) 335-3711 Project: ROUND ROCK BUSINESS CENTER 231 EAST MAIN STREET ROUND ROCK, TEXAS 78664 Reference TYPE ASI RFP RFI CRP QtY Unit Rate Price Bond Ins OH/P TOTALS SUITE 129 DRYWALL & CEILING LABOR DRYWALL & CEILING MATERIALS PAINTING 18 1141 SF $1.10 $1,255 16 25 FLOORS & TILE SPRINKLER 18 18 1 LS $2,330.40 $2,330 30 47 1572 SF $1.50 $2,358 31 47 18 1 LS MECHANICAL ELECTRICAL 18 18 1 LS $4,795.00 $2,949.00 $4,795 $2,949 62 38 96 59 1 LS $1,467.00 $1,467 19 29 314 583 590 480 295 18 1 LS $6,188.00 $6,188 80 124 147 619 $1,610 $2,989 $3,025 $5,433 $3,341 $1,662 $7,011 SUITE 234 DRYWALL & CEIJNG LABOR DRYWALL & CEILING MATERIALS PANTING 18 18 1807 SF $1.10 $1,988 26 40 1 LS $3,631.20 $3,631 47 73 FLOORS & TILE SPRINKLER 18 1759 SF $1.50 $2,639 34 53 18 1 LS $6,726.00 $6,726 87 135 MECHANICAL ELECTRICAL 18 1 LS $3,455.00 $3,455 45 69 18 1 LS $1,467.00 $1,467 19 29 497 908 660 673 346 18 1 LS $7,181.00 $7,181 93 144 147 718 $2,551 $4,659 $3,386 $7,621 $3,915 $1,662 $8,136 TOTAL TIME EXTENSION REQUESTED: 0 DAYS ACCEPTED: Fazzone Construction Co., Inc. Robert N. Evans, Project Manager $48,429 Architect: Owner $630 $969 $6,973 $57,000 FAZZONE Change Request Proposal # 35 Fazzone Construction Co., Inc. 2008 Windy Terrace Cedar Park, TX. 78613 (512) 331-4484 Fax (512) 335-3711 January 20, 2010 To: CITY OF ROUND ROCK 2008 ENTERPRISE ROUND ROCK, TEXAS 78664 Project: ROUND ROCK BUSINESS CENTER 231 EAST MAIN STREET ROUND ROCK, TEXAS 78664 These referenced are prices are submitted per the attachments & items: Reference ITEM ASI RFP RFI CRP Qty Unit Rate Price Bond Ins OH/P TOTALS SUITE 128 DRYWALL & CEIUNG LABOR 35 726 SF $1.10 $799 $10 $16 DRYWALL & CEILING MATERIALS 35 1 LS $1,529 $1,529 $20 $31 $200 31,025 PAINTING 35 1050 SF $1.50 $1,575 $35 $32 $382 $1,962 FLOORS & TILE 35 1 LS 32,683 $2,683 $35 $54 $268 $268 $3,040 SPRINKLER 35 1 LS $3,040 MECHANICAL 35 1 LS $2,219 $2,219 $29 $44 2 ELECTRICAL 35 1 LS $6,125 $6,125 $80 $123 $22213 $2,514 $613 $6,940 SUITE 223 $0 DRYWALL & CEILING LABOR 35 1600 SF $1.10 $1,760 $23 $35 DRYWALL & CEILING MATERIALS 35 1 LS 33,236 $3,236 $42 $65 $440 $2,258 PAINTING 35 1650 SF $1.50 $2,475 $32 $50 $809 $4,152 FLOORS & TILE 35 1 LS $5,028 $5,028$20 $131 $619 53 $3,175 SPRINKLER 35 1 LS $1,540 $1540 $52 $8 $1 $5 697 MECHANICAL 35 1 LS 34 006 84,006 852 $800 $04 $1,539 ELECTRICAL 35 1 LS 36,275 $6 275 $82 $126 34401 $4 539 $628 $7 110 TIME EXTENSION REQUESTED: 0 DAYS $46,924 Fazzone Construction Co., Inc. Architect Robert N. Evans, Project Manager