R-10-03-11-10B1 - 3/11/2010RESOLUTION NO. R -10-03-11-10B1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Fazzone Construction Co., Inc. for the remodeling of the City Business Center Complex, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 3 to the Contract with Fazzone Construction Co., Inc. for the remodeling of the City Business Center Complex, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. O:\wdox\SCC1nts\0112\1005\MUNICIPAL\00184745.DOC/rmc RESOLVED this llth day of March, 2010. ATTEST: SARA L. WHITE, City Secretary 2 ALAN MCGRAW, Mayor City of Round Rock, Texas Contract Quantity Adjustment/Change Order rev. 1:10 Department: Engineering and Development Services Project Name: Business Center Complex City Project ID Number: AA30AMAIN Justification Date: Page 1 of 3 2/9/2010 Change Order/Quantity Adjustment No. 3 The second floor roof top of the Business Center now has These are in plain view of the existing City Hall third floor will provide screening to integrate the equipment into the two large roof top heating and air conditioning systems equipment. north wall windows and not attractive to view. This change order building and not be as obstructive as the existing units. SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by: Contractor Approval: Signature Architect Approval: Signat e 057 444 -- City Official Approval: Amount $1,232,000.00 $1,232,000.00 $237,258.00 $31,815.00 $269,073.00 $0.00 $0.00 $0.00 $1,501,073.00 0/0 Change 19.26% 2.58% 21.84% 270 Calendar Days 300 Calendar Days 300 Calendar Days Signatures and Approvals Larry Madsen, Construction Manager - City of Round Rock Printed Name, Title and Company Bob Evans, Project Manager - Fazzone Construction Date Printed Name, Title and Company Date Keith A. Hickman, KA Hickman Architects Printed Name and Title Alan McGraw, Mayor 02/12/10 Date Signature Printed Name and Title Date 1 EXHIBIT „A„ rev. 01/10 Contract Quantity Adjustment/Change Order Change Order Data Page 2 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 The second floor roof top of the Business Center now has two large roof top heating and air conditioning systems equipment. These are in plain view of the existing City Hall third floor north wall windows and not attractive to view. This change order will provide screening to integrate the equipment into the building and not be as obstructive as the existing units. 1 1 $31,815.00 $31,815.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 o $0.00 $0.00 o $0.00 $0.00 o $0.00 $0.00 o $0.00 $o.00 o $0.00 $o.00 o $o.00 $0.00 0 $o.00 $0.00 o $o.00 $o.00 o $0.00 $o.00 o $0.00 $0.00 0 $o.00 $0.00 o $o.00 $0.00 o $o.00 $o.00 o $0.00 $0.00 o $o.00 $o.00 o $0.00 $0.00 o $0.00 $0.00 o $o.00 $0.00 o $0.00 $0.00 o $o.00 $0.00 o $0.00 $0.00 TOTALS: $31,815.00 0 rev. 01/10 Contract Quantity Adjustment/Change Order uantity Adjustment Data Page 3 of 3 TOTALS: $0.00 0 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 0 $0.00 $0.00 o $0.00 $0.00 0 $0.00 $o.00 o $0.00 $o.00 0 $0.00 $0.00 o $o.00 $o.00 o $0.00 $0.00 0 $o.00 $o.00 o $o.00 $0.00 o $0.00 $0.0o o $o.00 $0.00 o $o.00 $0.00 0 $o.00 $o.00 o $0.00 $0.00 o $0.00 $0.00 o $o.00 $0.00 o $0.00 $0.00 0 $0.00 $0.00 o $o.00 $o.00 o $o.00 $o.00 o $0.00 $o.00 o $0.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $0.00 $0.00 o $0.00 $0.00 o $o.00 $o.00 o $0.00 $o.00 o $o.00 $o.00 o $0.00 $o.00 0 $0.00 $0.00 TOTALS: $0.00 0 DATE: March 4, 2010 SUBJECT: City Council Meeting — March 11, 2010 ITEM: 1061. Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Changer Order No. 3 with Fazzone Construction Co., Inc. for the remodeling of the City Business Center Complex. Department: Engineering and Development Services Staff Person: Tom Word, P.E., Chief of Public Works Operations Larry Madsen, Construction Manager Justification: The second floor roof top of the Business Center has two large heating and air conditioning system units. City Zoning Ordinance requires that roof top units be screened. These are in plain view of the existing City Hall third floor north wall window and not attractive to view. This change order will provide screening to integrate the units into the building to comply with Zoning Ordinance. Strategic Plan Relevance: 20.0 Build and maintain the facilities needs to make the City attractive to businesses. Funding: Cost: Source of funds: 2002 GO Bonds & General Self Finance Construction $31,815.00 Outside Resources (if applicable): Fazzone Construction Public Comment (if applicable): N/A Amount % Change Original Contract $1,232,000.00 N/A Previous Change Orders $237,258.00 19.26% Change Order No. 3 $31,815.00 2.58% Revised Contract $1,501,073.00 21.84% Outside Resources (if applicable): Fazzone Construction Public Comment (if applicable): N/A EXECUTED DOCUMENT FOLLOWS Contract Quantity Adjustment/Change Order rev. 1/10 Department: Engineering and Development Services Project Name: Business Center Complex City Project ID Number: AA30AMAIN Justification Date: Page 1 of 3 2/9/2010 Change Order/Quantity Adjustment No. 3 The second floor roof top of the Business Center now has These are in plain view of the existing City Hall third floor will provide screening to integrate the equipment into the two large roof top heating and air conditioning systems equipment. north wall windows and not attractive to view. This change order building and not be as obstructive as the existing units. SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by• S' atur Contractor Approval: Architect Approval: City Official Approval: )91( 6_04) iQnature "e Signatures and Approvals Signature L- W -02, -ll- I i=1 Amount $1,232,000.00 $1,232,000.00 $237,258.00 $31,815.00 $269,073.00 $0.00 $0.00 $0.00 $1,501,073.00 % Change 19.26% 2.58% 21.84% 270 Calendar Days 300 Calendar Days 300 Calendar Days Larry Madsen, Construction Manager - City of Round Rock " 9-6) Printed Name, Title and Company Date Bob Evans, Project Manager - Fazzone Construction Printed Name, Idle and Company Keith A. Hickman, KA Hickman Architects Printed Name and Title Alan McGraw, Mayor Printed Name and Title Date 02/12/10 Date 3 ll cv Date rev. 01/10 Contract Quantity Adjustment/Change Order Change Order Data Page 2 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 The second floor roof top of the Business Center now has two large roof top heating and air conditioning systems equipment. These are in plain view of the existing City Hall third floor north wall windows and not attractive to view. This change order will provide screening to integrate the equipment into the building and not be as obstructive as the existing units. 1 1 $31,815.00 $31,815.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 o0.00 $ $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $o.00 o $o.00 $o.00 o $0.00 $0.00 o $0.00 $0.00 TOTALS: $31,815.00 0 rev. 01/10 Contract Quantity Adjustment/Change Order uantity Adjust Page 3 of 3 TOTALS: $0.00 0 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $0.00 $0.00 o $0.00 $o.00 o $o.00 $0.00 o $o.00 $o.00 o $0.00 $0.00 0 $0.00 $0.00 o $o.00 $o.00 o $0.00 $0.00 o $0.00 $0.00 o $0.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $0.00 o $o.00 $0.00 o $o.00 $o.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $o.00 $0.00 0 $0.00 $0.00 TOTALS: $0.00 0 eivis org An affordable solution for equipment screening is finally here Envisor equipment screens now offer architects the flexibility to create affordable, elegant, customized screening solutions that integrate with their building design, all with no rooftop penetration. Our patented equipment screens also provide a viable solution for municipal screening code requirements on everything from HVAC units to 52" Louver Panels The Ohio State University Foundation - Columbus, Ohio chillers, air handlers, power exhausts, roof stacks, communication equipment, dumpsters - you name it! Customizing a screen to fit your needs is easy Simply choose between canted or vertical, decide on a panel design, select a top trim (optional), and pick a color. It's that simple! We can customize any feature to your particular design requirements, including custom panel designs, custom colors, and custom top trim designs. If you don't see what you need, tell us what you want. We'll build it for you. System Features • Vertical Screen • Louver Panel Design • Cove Top Trim • Panel Color: Oyster • Top Trim Color: Terra Corsa 11111111111.111111111111111111111., www.cityscapesinc.com U.S. Patent No. 5,664,484 FAZZONE January 28, 2010 To: CITY OF ROUND ROCK 2008 ENTERPRISE ROUND ROCK, TEXAS 78664 These are prices are submitted per the attachments & referenced items: ITEM Change Request Proposal # 23R Fazzone Construction Co., Inc. 2008 Wndy Terrace Cedar Park, TX. 78613 (512) 331-4484 Fax (512) 335-3711 Project: ROUND ROCK BUSINESS CENTER 231 EAST MAIN STREET ROUND ROCK, TEXAS 78664 Reference ASI RFP RFI CRP Qty Unit Rate Price Bond Ins OH/P TOTALS ADD ROOF SCREENS @ RTU 1&2 19 23R LS $28,080 $28,080 $365 $562 $2,808 $31.815 TIME EXTENSION REQUESTED: 0 DAYS Fazzone Construction Co., Inc. Robert N. Evans, Project Manager Architect: Owner $31,815 PLEASE CONSIDER THE FOLLOWING PROPOSAL: To: Address: Attn: Phone: Fax: Email: KAHickman Architects 1517 E Palm Valley Blvd, Round Rock, TX 78664 Mke Vermeeren (512) 255-9690 (512) 388-1843 *Proposal was created based upon your infonnalion received by P Date: Application: Round Rock Business Center November 20, 2009 Round Rock, TX 78664 Quantity Description Price Amount 2 70V Envisor System to fit Carrier 50A3B027 $8,170.00 $16,340.00 1 Top Tran Style 8 -Step Two **Color: Mfg. Std Color** $1,280.00 $1,280.00 **Style: Vertical Screen. Louver Panels. ** Subtotal $17,620.00 Optional Installation - Nonunion $6,570.00 Estimated Shipping and Handling $3,890.00 Total $28,080.00 **Freight: Less Than Load** **Criteria for installation:** Permits & Freight by others Access will be unhindered 120 volt electrical will be available near units Job to be completed utilizing nonunion labor Job to be completed within one trip Salesman: Dave Coggiola Prices quoted do not include State or Local Taxes Pricing is based upon manufacturers standard product (unless noted) and standard lead times. F.O.B.: Hilliard, Ohio Terms: Net 30 Days, with approved credit Susan Pieper This quotation covers only quantities and styles listed. Should your final requirements vary from these, we will be pleased to submit a a revised quotation for your consideration. This quotation is subject to the acceptance and approval of the individual manufacturer and also subject to the customer's acceptance within thirty (30) days from bid date and release within thirty (30) days after receipt of order. No back charges will be accepted. liability is limited to repair or reolacament of defective eauipmant Accepted By. Date: 4200 Lyman Court, Hilliard, OH 43026 Ph: 877-727-3367 Fax 800-726-4817 USD USD USD USD