CM-2017-1557 - 11/28/2017Page I of 3
Contract Quantity Adjustment/ Change Order
Noo=
M,03114
Department: Transportation
Project
Name: Creek Bend and Western Gateway - _ _ Date: 11/14/17
City Project Change Order/Quantity
ID Number LDSCP-600-MVC Adjustment No. 1
Vendor DeNuad Constructors LLC 8310-1 Capitol of Texas Austin Texas 78731
Company Name Address Phone No.
As the landscape project for Creek Bend and SWDT Phase 5A proceeds, several Items were identified as necessary wnrcn were not mciuc
the original bid and/or were included but require quantity adjushnents. The detialed list which can be found in the actual contract forms,
collectively account for an Increase to the contract of $16,608.56
Original Contract Prft:
Previous Quantity Adjustrnent(s):
This Quantity Adjustment;
Total Quantity Adjustment(s):
Total Contract Price with Quantity AdjusbneWs):
Previous Change Order(s):
Thls Change Order.
Total Change order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjintment(s) Plus Change Orders*
Difference between Original and Adjusted Contract Priors:
Original Contract Time:
lime Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time:
SubmNledlildr Apprb"I
Prepared 8y Todd K a rations tram
SignaWM Printed Name, Tilde, Company
_ ��
Contractor: r -
�,..,,�t„ Pri S
me, Title, Company
city Project
Manager: Todd Keltgen 1
tun: Printed Name,
Mayor/CityJ J&Ati
Manager
Signature U Printed Name,
elM,,UI --7— 16
Amount
$805,726.50
$0.00
$0.00
$805,726.50
$16,608.56
$16,60856
F-$822.335.061
$16,608.56
120
0
10
130
% Change
ger 11/15117
Date
Date
i er 11/15/17
Date
0%
2%
2%
Contract Quantity Adjustnvent/Change Order
., nountl nam r i ..t.;r
mw. S�SIS£
Project Name: Creek Bend and Western Gateway
Quan. Adj./Change Order No.:
Chance Order Data
Pagc 2 ora
Item #
Item Description
Unit
Qty.
Unit Price
Amount
Contract
Time
Adjustment
Da
is
Installation of (1) ADD 90 -gallon
Chinquapin Oak
ADD Furnish and install outlets in view
corridor tree wells
Adjust manhole at Gazebo
Adjust 2" conduit for Gazebo electrical
needs
Remove and replace water tower
flagstone (ADA)
ADD electrical at Gazebo
Raise and re -coat manhole at walkway
DELETE landscape area Round Rock Ave
@ Brown Street.
DELETE saw cutting of existing stamped
concrete areas and installation of pavers
at same.
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
LS
1
$16,606.56
$16,608.56
10
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTA
,60M
10
kd11NO N06C I 1 ii.:'
nor.t�IFib
Bid Item #
Contract Quantity Adjustment/Change Order
Project Name: Creek Bend and Western Gateway
Quan. Adj./Change Order No.: 1
Item
Unit
Unit Price I Amount
Page 3 ora
contract
Time
Adjustment
City of Round Rock
f,
fRouNORonc
.. Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 1 with DeNucci
Constructors, LLC for the Creek Bend Extension and Western Gateway
Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 11/24/2017
Dept Director: Gary D. Hudder, Transportation Director
Cost: $16,608.56
Indexes: RR Transportation and Economic Development Corporation (Type B)
Attachments: Partially executed CO-QA#1.pdf
Department: Transportation Department
Text of Legislative File CM -2017-1557
Consider executing Quantity Adjustment/Change Order No. 1 with DeNucci Constructors,
LLC for the Creek Bend Extension and Western Gateway Project.
The original contract was approved by City Council on July 27, 2017 awarding a
construction contract for the Creek Bend Extension & Western Gateway project in the
amount of $805,726.50. The project is in the setting of Southwest Downtown Infrastructure
Improvements 5A project and the Creek Bend Extension project. The project includes
provisions for landscaping, hard scape, irrigation and a Gateway Entrance sign in
accordance to the proposed program scope items as directed by the City of Round Rock.
The project will also incorporate the former wellhead and gazebo to accompany landscape
plantings and associated improvements.
The item up for consideration is for Change Order/Quantity Adjustment #1 and is for
several items that were identified as necessary which were not included in the original bid
and/or were included but require quantity adjustments. The items included in Change
Order/Quantity Adjustment #1 include: the installation of (1) 90 gallon Chinquapin Oak for
the Creek Bend roadway project; an addition of conduit, breakers, wire, outlets, and lights
in the view corridor tree wells, manhole ring and cover adjustment at new gazebo area;
adjustment of the electrical panel feed gutter at the First Baptist church for the Gazebo;
remove and replace 200 SF flagstone at water tower areas to match new walkway; add
Cityo! Round Rack Page f Printed on 11/21/2017
Agenda Nem Summary Continued (Chf-2017-107)
outlet and future lighting circuits at gazebo; delete landscape area and concrete bands at
Brown St, @ RR Ave.
The original contract approved by City Council totaled $805,726.50, The item up for
consideration in Change Order/Quantity Adjustment #1 totals $16,608.56. With the
approval of this item, the adjusted total will be $822,335.06. This change results in a 2%
increase in the original approved contract amount.
Cost: $16,608.56
Source of Funds: RR Transportation and Economic Development Corporation
City o/Round Rock Page 2 Pdnted on 11/21/2017