CM-2017-1557 - 11/28/2017Page I of 3 Contract Quantity Adjustment/ Change Order Noo= M,03114 Department: Transportation Project Name: Creek Bend and Western Gateway - _ _ Date: 11/14/17 City Project Change Order/Quantity ID Number LDSCP-600-MVC Adjustment No. 1 Vendor DeNuad Constructors LLC 8310-1 Capitol of Texas Austin Texas 78731 Company Name Address Phone No. As the landscape project for Creek Bend and SWDT Phase 5A proceeds, several Items were identified as necessary wnrcn were not mciuc the original bid and/or were included but require quantity adjushnents. The detialed list which can be found in the actual contract forms, collectively account for an Increase to the contract of $16,608.56 Original Contract Prft: Previous Quantity Adjustrnent(s): This Quantity Adjustment; Total Quantity Adjustment(s): Total Contract Price with Quantity AdjusbneWs): Previous Change Order(s): Thls Change Order. Total Change order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjintment(s) Plus Change Orders* Difference between Original and Adjusted Contract Priors: Original Contract Time: lime Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: SubmNledlildr Apprb"I Prepared 8y Todd K a rations tram SignaWM Printed Name, Tilde, Company _ �� Contractor: r - �,..,,�t„ Pri S me, Title, Company city Project Manager: Todd Keltgen 1 tun: Printed Name, Mayor/CityJ J&Ati Manager Signature U Printed Name, elM,,UI --7— 16 Amount $805,726.50 $0.00 $0.00 $805,726.50 $16,608.56 $16,60856 F-$822.335.061 $16,608.56 120 0 10 130 % Change ger 11/15117 Date Date i er 11/15/17 Date 0% 2% 2% Contract Quantity Adjustnvent/Change Order ., nountl nam r i ..t.;r mw. S�SIS£ Project Name: Creek Bend and Western Gateway Quan. Adj./Change Order No.: Chance Order Data Pagc 2 ora Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Da is Installation of (1) ADD 90 -gallon Chinquapin Oak ADD Furnish and install outlets in view corridor tree wells Adjust manhole at Gazebo Adjust 2" conduit for Gazebo electrical needs Remove and replace water tower flagstone (ADA) ADD electrical at Gazebo Raise and re -coat manhole at walkway DELETE landscape area Round Rock Ave @ Brown Street. DELETE saw cutting of existing stamped concrete areas and installation of pavers at same. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 LS 1 $16,606.56 $16,608.56 10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTA ,60M 10 kd11NO N06C I 1 ii.:' nor.t�IFib Bid Item # Contract Quantity Adjustment/Change Order Project Name: Creek Bend and Western Gateway Quan. Adj./Change Order No.: 1 Item Unit Unit Price I Amount Page 3 ora contract Time Adjustment City of Round Rock f, fRouNORonc .. Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with DeNucci Constructors, LLC for the Creek Bend Extension and Western Gateway Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 11/24/2017 Dept Director: Gary D. Hudder, Transportation Director Cost: $16,608.56 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Partially executed CO-QA#1.pdf Department: Transportation Department Text of Legislative File CM -2017-1557 Consider executing Quantity Adjustment/Change Order No. 1 with DeNucci Constructors, LLC for the Creek Bend Extension and Western Gateway Project. The original contract was approved by City Council on July 27, 2017 awarding a construction contract for the Creek Bend Extension & Western Gateway project in the amount of $805,726.50. The project is in the setting of Southwest Downtown Infrastructure Improvements 5A project and the Creek Bend Extension project. The project includes provisions for landscaping, hard scape, irrigation and a Gateway Entrance sign in accordance to the proposed program scope items as directed by the City of Round Rock. The project will also incorporate the former wellhead and gazebo to accompany landscape plantings and associated improvements. The item up for consideration is for Change Order/Quantity Adjustment #1 and is for several items that were identified as necessary which were not included in the original bid and/or were included but require quantity adjustments. The items included in Change Order/Quantity Adjustment #1 include: the installation of (1) 90 gallon Chinquapin Oak for the Creek Bend roadway project; an addition of conduit, breakers, wire, outlets, and lights in the view corridor tree wells, manhole ring and cover adjustment at new gazebo area; adjustment of the electrical panel feed gutter at the First Baptist church for the Gazebo; remove and replace 200 SF flagstone at water tower areas to match new walkway; add Cityo! Round Rack Page f Printed on 11/21/2017 Agenda Nem Summary Continued (Chf-2017-107) outlet and future lighting circuits at gazebo; delete landscape area and concrete bands at Brown St, @ RR Ave. The original contract approved by City Council totaled $805,726.50, The item up for consideration in Change Order/Quantity Adjustment #1 totals $16,608.56. With the approval of this item, the adjusted total will be $822,335.06. This change results in a 2% increase in the original approved contract amount. Cost: $16,608.56 Source of Funds: RR Transportation and Economic Development Corporation City o/Round Rock Page 2 Pdnted on 11/21/2017