Loading...
CM-2014-542 - 10/3/2014City of Round Rock i RUUNO ROCK TexAs Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 3 with Patin Construction LLC for Sam Bass Road at Creek Bend Boulevard Turn Lane Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/3/2014 Dept Director: Gary D. Huddler, Transportation Department Cost: $0.00 Indexes: Attachments: LAF - Quantity Adjustment -Change Order #3 w- Patin Construction (00311984xA08F8), Signed Executed Copy of QA -CO #3 Department: Transportation Department Text of Legislative File CM -2014-542 On November 14, 2013 the City Council awarded the construction services contract for Sam Bass at Creek Bend Blvd to Patin Construction at a cost of $754,492. 00. The initial contract was for the construction of turn lane improvements and a signal installation at the intersection of Sam Bass Rd. at Creek Bend Blvd. This work was always anticipated as part of the Creek Bend Extension Project. Change Order/Quantity Adjustment #1 was required for an unforeseen Brushy Creek Municipal Utility District water transmission line relocation. This line was in conflict with the turn lane improvements on Sam Bass Rd. and resided in its own proprietary easement that was not defined in the original subsurface investigation. It was lowered in its existing location. This Change Order also addressed conflicts with trees that had to be removed which were also in conflict with the roadway improvements. The cost of Quantity Adjustment/Change Order No. i was $163, 400.00 Change Order# 2 was required to relocate a City of Round Rock 12" water main stub that was in conflict with the new signal pole foundation for the intersection improvements. The geometrics of the intersection would not allow the movement of the new signal pole foundation: therefore the water main had to be relocated. This work required a night time waterline shut down for the Creek bend neighborhood to minimize inconvenience to the residents. The cost of Quantity Adjustment/Change Order No. 2 is $13, 010.00, and will be funded out of the City's utility fund. crryorRoum Rock Po'.1 PrinW on 1WM014 AaenW Ihm Summary Conllau (CM -]0145x3) Change Order# 3 is required to adjust final quantities for the project closeout. This QA/CO #3 will result in a negative amount through the result from some additional item and some deductions. The cost of Quantity Adjustment/Change Order No. 3 is $(7,988.50), This deduction will result in an overall project cost of $922,913.50 Staff recommends approval Cost: $(7,988.50) CityorRound Rook Paye] Pnn1 on foWM4 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Sam Base Road or Creek Bend Boukvenl Tum Lene Department Name: Transportation Project Name: armovemeniz Project MgdResource: Todd Kengen ContractonVendor: Patin Consaactmn LLC Council Action: ORDINANCE RESOLUTION xx City Manager Approval CMA Wording Consider executing Quantity Adjustment/Change Order No. 3 with Patin Construction LLC for the Sam Bass Road at Creek Bend Boulevard Turn Lane Improvements Project. Attorney Approval QAttorney Date 0:\wdox\SCClnls\0199\1367\MISC\00311984.XLS Updated 613/08 Contract Quantity Adjustment/Change Order hange Order #3 is for final quantity ajustments for project close out. Date: 9/19/14 Change Order/Quantity Adjustment No. 3 SUMMARY / %Change r.0BM13 Department TRANSPORTAION Project SAM BASS ROAD AT CREEK BEND TURN Name: LANEIMPROVEMENTS City Project ID Number ST33CBDR Justification -$7,988.50 hange Order #3 is for final quantity ajustments for project close out. Date: 9/19/14 Change Order/Quantity Adjustment No. 3 SUMMARY Amount %Change Original Contract Price: $754,492.00 Previous Quantity Adjustmerri This Quantity Adjustment: -$7,988.50 Total Quantity Acijustment(s): -$7,988.50 Total Contract Price with Quantity Admencent(s): $746,503.50 Prevous Change Order(s): $176,410.00 0.24 This Change Order: $0.00 0.00 Total Change Order(s)To Date: '* $176,410.00 0.24 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)1: $922,913.50 Difference between Original and Adjusted Contract Prices: $168,421.50 Original Contract Time: 120 Time Ad)ustment by previous Quan. Adj./Change Order: 20 Time Adjustment by this Quan. Adj./Change Order: 2 New Contract Time: 142 Submitted for Approval Prepared By: Todd Keligen Transportation Operations Manager 9/19/14 SignaturePrinted Name, Tilde, Company Date Approvals P& conductor: R>w, 71 Z/ Signature Printed Name, Title, Company bi City Project Manager: n signature Printed Name, Title Date CM -76%14 - 15+Z Paee 2 of 3 Contract Quantity Adjustment/Change Order r Project Name: SAM BASS ROAD AT CREEK BEND TURN LANE IMPROVEMENTS Quan. Adj./Change Order No.: 3 Change Order Data Item Description to Page 3 of 3 �y Contract Quantity Adjustment/Change Order Project Name: SAM BASS ROAD AT CREEK BEND TURN LANE IMPROVEMENTS Quan. AdT/Change Order No.: 3 Ouantity Adiustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment $0.00 13 ASPH (TIER 1) GAL -1709 $6.00 -$10,254.00 14 AGGR (TIER I CY -36 $155.00 -$5,580.00 15 PLANE ASPH CONC PAV (0" TO P') SY 275 $1.50 $412.50 23 RC PIPE (CL III) (241N) LF -5 $170.00 -$850.00 25 INLET (COMP) (CURB) (TY 1I) (20') EA -1 $9,000.00 -$9,000.00 CONDT (PVC) (SCID 80) (2") LF 9 $10.00 $90.00 CONDT (PVC)(SCHD 80)(3") LF I57 $14.00 $2,198.00CONDT (PVC) (SCHD 80) (4") LF 10 $21.00 $210.00 M35 PED POLE ASSEMBLY EA 1 $2,100.00 $2,100.00 TEMPORARY SEDIMENT CONTROL FENCE INTLL LF -750 $2.00 -$1,500.00 103 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF -750 $0.20 -$150.00 105 DGR HMA (SQ) TY -C SAC -A PG70-22 TON 315 $93.00 $29,295.00 106 DGR HMA (SQ) TY -C PG70-22 TON -176 $85.00 -$14,960.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00- 0.00$0.00$0.00 $0.00- $0.00 $0.00 TA -$7,988. 0