Loading...
CM-2017-1566 - 12/8/2017Page i co Contract Quantity Adju Mmment/Change Order -7--- e..01116 Department: Transportation Project Name: 2017 Street Maintenance Program lh-Place Pavement- Resurfacing) Date: i1 1717 City Project Change Order/Quantity 1D Number Adjustment No. i Vendor Cutler Repaving, Inc. 921 East 27th St. Lawrence,. Kansas 66046 Company Name Address Phone No. - 7ustificabion As the2017 Street Maintenance Program for AW Grimes, Mc Mel Rd and Dell Way completed, several items were Identified as nea ary which were not Included In the original bid and/or were Included but require quarrtrty adjustments. The detlaled Est which can be found in the actual contract corms, collectively account for an Increase to the contract of $45,013.47 Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjus nmgs): Total Contract Price wNh Quantity Adjustrnent(s): Previous Charge Order(s): This Change Order: Total Change Order(s) To Date: AdPSW Contact Price (Original Contact Price Plus Quantity AdMtrnent(s) Plus Change OnWs)]: Oifiference between Original and Adjusted Contract Prices: Original Contract Time: lime Adimnent by prevbus Quan. AdJ JChange Order: Tlme Adjustment by this QuarL Adj./Change Order. New Contract Time: Amount % Chamgen 0% $33,430.99 2% $33,430.99 2% $1,632,793.47 $45,013,47 120 0 10 130 Todd Keltnen overatlons Manaaer 11/15/17 Contracts:L&dAUW-A-�Llzl�Wier Flop itykU Inc. Charles R. Veskerm Preskimt //' '024/ Sire i Printed Name, Title, Company Date MnagMaP , ' x.f✓ Todd KeUen Operations Manaqer 11/15/17 . Page 3 of 3 lt-- Contract Quantity Adjustment/Change Order rn UL : L! Project Name: 2017 Street Malnumnee Program (In -Place Pavement Rt sur adng) Quan. Adj./Change Order No.: Duantity Adiustment Data Bid Item # Item Description UnitEUMI Unit Price Time 7 Contract Amount Adj:� 1 In -Place Pavement Recycling S.Y. 6 7.2 $2.7017,920.44 2 Pavement Repair Ter, -14 .09 $111.00 -$164,067.99 3 Type D HMAC Surface Course Tcn 1148.94 S77.So $89,042.85 4 Rejuvenator Agent GAL 2422 63,30 ,4 3 Edge Milting S.Y. -529 SISp -$1 50 b Manhole Adjustment EA 11 $275.00 $3,025.00 7 Valve Can Adjustment EA 0 $150.00 $0.00 8 Remove and Replace Concrete Curb and Gutta L.F. 129 561.60 $7,946.40 9 Remove and Replace Reinromed Concrete Sidewalk S.F. 2188.8 $23.10 $5DS6128 10 Traffic Control MO S13,000.00 $0.001 $ $0. S11382.481 0 Contract Quantity Adjustnnent/Change Order P .. Project Mame: 2017 Street Maintenance Program (In -Place Pavement Resurfadng) Quan. Adj./Change Order No.: Order data item # 1 ]stem unit 11 ICenter I L5 Unit Price I Amount Page 2 of 3 Contract Time Adjustment City of Round Rock r ROUN T-AAS ROCK Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Cutler Repaving, Inc. for the 2017 Street Maintenance Program (In -Place Pavement Recycling) Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/8/2017 Dept Director: Gary D. Hudder, Transportation Director Cost: $45,013.47 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: CO -QA #1.pdf Department: Transportation Department Text of Legislative File CM -2017-1566 Consider executing Quantity Adjustment/Change Order No. 1 with Cutler Repaving, Inc. for the 2017 Street Maintenance Program (In -Place Pavement Recycling) Project. The City of Round Rock manages more than 1,150 lane miles of roadways within its jurisdiction. In order to preserve, and/or improve, the conditions of existing roadways, the City has developed a Street Maintenance Program (SMP). This program allows the City to monitor the state of it's roadways and systematically repair, and / or overlay our city streets. The 2017 Street Maintenance Program In -Place Pavement Recycling (IPPR ) Project will provide a long lasting and durable driving surface for the specific segments of A.W. Grimes Boulevard, McNeil Road, and Dell Way. This In -Place Pavement Recycling Project includes various curb and gutter, sidewalk and pavement repairs; pavement milling; and approximately 115,000 square yards of heating, scarifying and repaving existing roadways including a one - inch (1") HMAC overlay. On April 26, 2017 at 2:00pm, bids were submitted and opened for the above referenced project. One (1) responsive bid proposal was submitted with a total bid price of $1,587,780.00 by Cutler Repaving Inc. The engineer's opinion of probable construction cost was estimated at $1,500,000. Based upon the careful review of the Bid Tabulation, City al Round Rack Page i Printed an 12/8/1017 Aganda Item Summary Continued (CM -2017-1506) the Transportation Department recommends the City of Round Rock approval of award to Cutler Repaving Inc. in the amount of $1,587,780.00 The item up for consideration is for the 2017 Street Maintenance Program In-place Pavement Recycling (IPPR) Project is Change Order/Quantity Adjustment #1. This item is for a changer order and quantity adjustment for the project close out. The items under consideration are pavement repairs, curb and gutter remove and replace which were not included in the original bid quantities and for were included but will require quantity adjustments. The detailed list for these quantities can be found in the actual contract forms, which collectively account for the increase to the contract of $45,013.47. This brings the original contract price of $1,587,780.00 to the adjusted contract price of $1,632,793.47 with the quantity adjustments. Cost. $45,013.47 Source of Funds: RR Transportation and Economic Development Corporation CityolRoundRock Page 2 Printed on IZWO17