Loading...
R-10-08-26-10B1 - 8/26/2010RESOLUTION NO. R -10-08-26-10B1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with RGM Constructors, L.P. for the Meister Lane Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with RGM Constructors, L.P. for the Meister Lane Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of August, 2010. )c)1 ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SPw44, R,Uat SARA L. WHITE, City Secretary 0:\wdox\SCC1nts\0112\1005\MUNICIPAL\00200319.DOC/nnc ROUND ROCK. TOGS rev. 1/10 Contract Quantity Adjustment/Change Order Department: Transportation Administration Project Name: MEISTER LANE City Project ID Number: Justification Date: Page 1 of 3 7/27/2010 Change Order/Quantity Adjustment No. 1 NEW SIGNAL FOUNDATION - EXISTING FOUNDATION WOULD NOT ACCOMMODATE PROPOSED SIGNAL POLE. SLEEVES FOR FUTURE USE - REQUESTED BY CORR. ELECTRICAL MANHOLE ADJUSTMENT NOT SHOWN ON PLANS. EXTRA RIP RAP. BOX CULVERT HEADWALL - NO BID ITEM. T -BASE FOUNDATION. FINAL QUANTITY ADJUSTMENT SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by: Contractor Approval: City Staff Approval: City Official Approval: Signature ignaturej6°-11 Signature CJ Amount $846,046.85 $846,046.85 $0.00 $23,768.95 $23,768.95 $0.00 11111 $18,557.77 $18,557.77 $888,373.57 135 135 135 0.00% 2.81% 2.81% MATT GOLD PROJECT MANAGER RGM CONSTRUCTORS, L.P. Printed Name, Title and Company MATT GOLD PROJECT MANAGER RGM CONSTRUCTORS, L.P. Printed Name, Tide and Company 7/27/2010 Date 7/27/2010 Date ` Printed Na-inve. I 1 et b J-&, C 17 E rJl\n ea,r Date 7/2-7 7 /10 Signature Printed Name and Title Date EXHIBIT rev. 01/10 91 92 93 94 95 Contract Quantity Adjustment/Change Order Item Descri ' tion and Chan • e 36" DRILL SHAFT 6" SLEEVES FOR FUTURE USE 4" SLEEVES FOR FUTURE USE 7' X 4' HEADWALL T -BASES FOR FOUNDATION Chan . e Order Data Unit LF LF LF EA EA 13 Page 2 of 3 Unit Price Amount Contract Time Adjustment Da s $359.15 $4,668.95 300 $15.00 $4,500.00 300 $10.00 $3,000.00 1 $5,000.00 $5,000.00 12 $550.00 $6,600.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 0 0 0 0 0 0 X0.00 _ $0.00 TOTALS: $23,768.95 ROUND ROCK TEXAS rev. 01/10 Contract Quantity Adjustment/Change Order uanti Adjustment Data Item Descri • tion and Chan • e PRIME COAT HOT MIX ASPHALTIC CONC TY C MINOR MANHOLE ADJUSTMENT SILT FENCE FOR EROSION CONTROL RIP RAP (CONC)(5 IN) ROCK FILTER DAMS (INSTALL)(TY 2) REFL PAV MRK TY I (W) 8" SLD 090MIL REFL PAV MRK TY I (W) 12" SLD 090MIL REFL PAV MRK TY I (Y) 4" BRK 090MIL REFL PAV MRK TY I (Y) 4" SLD 090MIL REFL PAV MRK TY I (Y) 12" SLD 090MIL Unit GAL TON EA LF CY LF LF LF LF LF LF -875 Unit Price $3.65 Page 3 of 3 Amount -$3,193.75 216.73 $64.00 $13,870.72 1 $800.00 $800.00 27 $2.00 $54.00 12 $600.00 $7,200.00 4 $19.00 $76.00 24 $0.80 $19.20 44 $2.80 $123.20 15 $0.40 $6.00 -109 $0.40 -$43.60 -118 $3.00 -$354.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 0.00 Contract Time Adjustment Da s TOTALS: $18,557.771 0 T �l N R GATTIS SCHOOL RD m Cedar Ridge High School Z SH 45 LOUIS HENNA BL LOUISV HENNA BLVD SH 45 N w e Meister Lane ROUND ROCK,TEXAS_ PUNFOSE.fHSS�On PROS/Ekll'Y s ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY Agenda Item No. *1061. Ci Council A:enda Summar Sheet Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Agenda Caption: Order No. 1 with RGM Constructors, LP for the Meister Lane Project. Meeting Date: August 26, 2010 Department: Infrastructure Development and Construction Management Staff Person making presentation: Tom Word, P.E. Chief of Public Works Operations Item Summary: QA/CO No. 1 is for a necessary change order and final quantity adjustments for Meister Lane. The change order items include a new signal foundation, sleeves for future use, and a box culvert headwall not included in the original plans. Various quantities are also being adjusted to account for as -built field conditions. Amount % Change Original Contract $846,046.85 N/A Previous Quantity Adjustments $ 0.00 N/A Quantity Adjustment No 1. $ 18,557.77 N/A Previous Change Orders $ 0.00 0% Change Order No 1. $ 23,768.95 2.81% Revised Contract Total $888,373.57 2.81% Strategic Plan Relevance: Goal No. 26: Construct major element of the transportation and mobility system as approved by Council in the Master Transportation Plan. Cost: $42,326.72 Source of Funds: General Self Finance Construction Funds Date of Public Hearing (if required): N/A Recommended Action: Approval EXECUTED DOCUMENT FOLLOWS rev. 1/10 Contract Quantity Adjustment/Change Order Department: Transportation Administration Project Name: MEISTER LANE City Project ID Number: Justification Date: Page 1 of 3 7/27/2010 Change Order/Quantity Adjustment No. 1 NEW SIGNAL FOUNDATION - EXISTING FOUNDATION WOULD FUTURE USE - REQUESTED BY CORR. ELECTRICAL MANHOLE CULVERT HEADWALL - NO BID ITEM. T -BASE FOUNDATION. NOT ACCOMMODATE PROPOSED SIGNAL POLE. SLEEVES FOR ADJUSTMENT NOT SHOWN ON PLANS. EXTRA RIP RAP. BOX FINAL QUANTITY ADJUSTMENT SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by: Contractor Approval: City Staff Approval: City Official Approval: Signature Signature 6A 1 r. Signature / Amount $846,046.85 $846,046.85 $0.00 $23,768.95 $23,768.95 $0.00 $18,557.77 $18,557.77 $888,373.57 0/0 Change 0.00% 2.81% 2.81% 135 135 135 MATT GOLD PROJECT MANAGER RGM CONSTRUCTORS, L.P, 7/27/2010 Printed Name, Title and Company Date MATT GOLD PROJECT MANAGER RGM CONSTRUCTORS, L.P.7/27/2010 Printed Name, Title and Company Date <AR>n;NJ Lynn l+ ( ., c, ��.,i - Printed Name and Title Signature �7J2 7//e Dat nvt M,= , MmtiaN 8.26-(v Printed Name and Title Date �NOUNO RfN:k, TIXAS rev. 01/10 Contract Quantity Adjustment/Change Order Page 2 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 91 92 93 94 95 36" DRILL SHAFT 6" SLEEVES FOR FUTURE USE 4" SLEEVES FOR FUTURE USE 7' X 4' HEADWALL T -BASES FOR FOUNDATION LF LF LF EA EA 13 $359.15 $4,668.95 0 300 $15.00 $4,500.00 0 300 $10.00 $3,000.00 0 1 $5,000.00 $5,000.00 0 12 $550.00 $6,600.00 0 0 $0.00 $0.00 0 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTALS: $23,768.95 0 ROUno ROCK, TEXAS rev. 01/10 Contract Quantity Adjustment/Change Order Page 3 of 3 TOTALS: $18,557.77 0 ------ - ----------- --- Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 16 17 23 36 39 46 58 59 63 64 65 PRIME COAT HOT MIX ASPHALTIC CONC TY C MINOR MANHOLE ADJUSTMENT SILT FENCE FOR EROSION CONTROL RIP RAP (CONC)(5 IN) ROCK FILTER DAMS (INSTALL)(TY 2) REFL PAV MRK TY I (W) 8" SLD 090MIL REFL PAV MRK TY I (W) 12" SLD 090MIL REFL PAV MRK TY I (Y) 4" BRK 090MIL REFL PAV MRK TY I (Y) 4" SLD 090MIL REFL PAV MRK TY I (Y) 12" SLD 090MIL GAL TON EA LF CY LF LF LF LF LF LF -875 $3.65 -$3,193.75 216.73 $64.00 $13,870.72 1 $800.00 $800.00 27 $2.00 $54.00 12 $600.00 $7,200.00 4 $19.00 $76.00 24 $0.80 $19.20 44 $2.80 $123.20 15 $0.40 $6.00 -109 $0.40 -$43.60 -118 $3.00 -$354.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTALS: $18,557.77 0 a) 2