Loading...
R-10-09-09-11C2 - 9/9/2010RESOLUTION NO. R -10-09-09-11C2 WHEREAS, the City of Round Rock has duly advertised for bids for the Lakeside Subdivision Channel Improvements Project, and WHEREAS, Smith Contracting has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Smith Contracting, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Smith Contracting for the Lakeside Subdivision Channel Improvements Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of September, 2010. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SPni1.. Witte SARA L. WHITE, City Secretary 0:\wdox\scclnts\0112\1005\N ICIPAL\00201354.DOC/rmc ROUND ROCK, TEXAS PURPOSE. 1PURPOSE. PASSION. PROSPERITY Agenda Item No. 11C2. City Council Agenda Summary Sheet Agenda Caption: Meeting Date: Consider a resolution authorizing the Mayor to execute a contract with Smith Contracting for the Lakeside Subdivision Channel Improvements Project. September 9, 2010 Department: Infrastructure Development and Construction Management Staff Person making presentation: Danny Halden, P.E. City Engineer Item Summary: The bid opening for the Lakeside Subdivision Channel Improvements was held on August 6, 2010. Five sealed bids were received. The highest bid was $319,352 submitted by Myers Concrete Construction, LP. Lewis Contractors Inc. submitted the second highest bid of $305,899. The third highest bid was $261,935.25 by Muniz Concrete and Contracting Inc. The second lowest bid was submitted by Keystone Construction, Inc. in the amount of $226,211.15. The lowest bid of $209,346.50 was received from Smith Contracting Co., Inc. The goal of this project is to increase the capacity of the Lakeside Subdivision Channel. The work will include excavation, grading, retaining wall installation, and restoration/re-vegetation. The City's staff recommends the contract be awarded to Smith Contracting Co., Inc. Strategic Plan Relevance: Goal 28.0: Provide for effective management of storm water. Cost: $209,346.50 Source of Funds: Utility System Projects Date of Public Hearing (if required): N/A Recommended Action: Staff recommends City Council approval