R-10-10-14-9F2 - 10/14/2010RESOLUTION NO. R -10-10-14-9F2 WHEREAS, the City of Round Rock wishes to enter into a Reimbursement Agreement with Atmos Energy Corporation ("Atmos") for the relocation of a gas pipeline owned by Atmos in connection with the Chisholm Trail Improvements Project, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City said Reimbursement Agreement with Atmos Energy Corporation, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of October, 2010. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary O:\wdox\SCC1nts\0112 \ 1005\MUNICIPAL\00204417.DOC/rmc ATMOS energy August 25, 2010 Mr. Bill Stablein City of Round Rock 212 Commerce Cove Round Rock, Texas 78664 EXHIBIT Re: Round Rock Distribution Atmos Pipeline Relocation Improvements on Chisholm Trail Round Rock, Williamson County, Texas Dear Mr. Stablein Attached is a proposed Reimbursement Agreement covering the relocation of approximately 661 feet of 6 -inch steel pipeline by directional bore method; abandonment in place of approximately 611 feet of existing 6 -inch steel pipe to accommodate proposed Improvements to Chisholm Trail by the City of Round Rock. The estimated cost of these alterations is $331,285.92. The portion of the actual costs of this relocation for which the City would be responsible is 54.78 % (86 feet of existing pipe outside existing road right of way divided by 157 feet of existing pipe within proposed road right of way), estimated to be $181,478.92. This estimate is subject to review after 60 days. This contract is along the same lines as previous contracts with the City of Round Rock. Approval of the proposed pipeline route shown on the attached drawing is necessary prior to the start of construction by Atmos Energy. Approval shall include confirmation that existing and proposed features along the proposed pipeline route are shown completely and correctly. Proposed and existing features shown, including land usage, grades, streets, drainage structures, water lines, storm sewers, etc., along the proposed pipeline route are based on the best information available to Atmos Energy. If the features shown are incorrect or new information is available, please advise as soon as possible so plans can be revised accordingly. Please have the enclosed agreement executed by the appropriate party on behalf of the City and return two originals to this office for Company execution. When this authorization is received, scheduling of the work can proceed and one fully executed Atmos Energy Corporation 5420 LT PRIVY, Dallas TX 75240 original will be returned to you. Upon completion of the alteration work, you will be furnished an itemized invoice as to the actual cost incurred. If you have any questions concerning our cost estimates and plans, I will be happy to discuss this matter in greater detail with you at your convenience. Sincerely, C /17 Thomas E. Holley Right of Way Representative Atmos Energy Corporation 5420 LBJ Freeway, Suite 1800 Dallas, TX 75240 (214) 206-2937 Office (214) 276-6402 Fax Email: thomas.holley@ atmosenergy.com Enclosures REIMBURSEMENT AGREEMENT This Reimbursement Agreement ("Agreement') made this day of , 2010, by and between ATMOS ENERGY CORPORATION, a Texas and Virginia corporation, having a business address at 5420 LBJ Freeway, Suite 1800, Dallas, Texas 75240 ("Atmos") and the CITY OF ROUND ROCK, a Texas home -rule municipal corporation, having a business address at 221 East Main Street, Round Rock, Texas ("CORR"). WITNESSETH: WHEREAS, CORR is widening Chisholm Trail Road (the "Project"); and WHEREAS, Atmos has a gas lines that are in conflict with the CORR's project; and WHEREAS. CORR has requested that Atmos relocate or cause to be relocated their gas lines to accommodate the proposed improvements; and WHEREAS, Atmos has agreed to the relocation it facilities as shown on the plans attached hereto as Exhibit "A" and made a part hereof ("Relocation Services") and has prepared a good faith cost estimate set forth on Exhibit "B" attached hereto and made a part hereof ("Estimate"); and WHEREAS, CORR agrees to reimburse Atmos for the actual expenses incurred by Atmos related to the Relocation Services requested by CORR. NOW, THEREFORE, in consideration of mutual promises contained herein, the parties agree as follows: 1. Atmos agrees to provide the Relocations Services to install approximately 661 feet of 6 -inch steal pipeline know and designated as Line L40, abandon approximately 611 feet of existing 6 -inch steel gas pipeline. The starting date will be fixed by mutual agreement of the parties hereto and Atmos shall use commercially reasonable efforts to complete the Relocation Services in accordance with the Schedule, subject however, to delays caused by persons or events outside the reasonable control of Atmos. 2. The actual cost of the relocation is estimated to be $ 331,285.92. CORR agrees to reimburse Atmos the actual costs of the Relocation Services, an amount estimated to be $181,478.92. Atmos shall submit to CORR a detailed written report itemizing the total costs incurred, including all supporting information documenting all amounts incurred for which reimbursement is claimed and verifying that the Relocation Services are in accordance with the requirements of this Agreement and that any change orders increasing the cost for the Relocation Services above the threshold described below were submitted and approved by CORR prior to incurring such additional costs. Upon Completion of the Relocation Services, Atmos shall present CORR with a detailed invoice of the actual Relocation Services performed and CORR agrees to make, within thirty (30) days from the date of the properly detailed invoice, a one-time reimbursement payment of the actual costs. In the event, after actual solicitation of bids, the estimated costs of the Relocation Services exceed the Cost Estimate by 10% or more, then, prior to incurring such additional expense, Atmos shall submit the additional costs to CORR for approval, which approval shall not be unreasonably withheld, delayed, or conditioned. Any request for approval made by Atmos in writing and not specifically approved or disapproved within 5 business days shall automatically be deemed approved by CORR. Neither enhancement nor betterment costs shall be reimbursed by CORR. 3. The obligation of CORR to make a cost reimbursement payment under this Agreement does not constitute a general obligation or indebtedness of CORR for which CORR is obligated to levy, pledge or collect any form of taxation. 4. The parties agree to exercise all due caution while causing any work to be done near the gas line in order to prevent damages to the gas line. 5. Not withstanding any other provisions of this Agreement, in no event shall either party be liable to the other for any indirect, consequential or incidental damages, including but without limitation, loss of revenue, loss of customers or loss of profits arising from the Agreement and the performance or non- performance of obligations hereunder. 6. Atmos agrees to indemnify and hold harmless CORR, its agents and employees, against and from any and all liability, loss and expense and shall defend all claims, resulting from the loss of life or damage or injury to persons or property directly or indirectly resulting from the work performed by Atmos to the extent such loss, damage or injury, is caused by the negligence or willful misconduct of Atmos or its agents or arises out of or in connection with the Relocation Services. As a necessary condition for such indemnity to be enforceable against Atmos: (i) Atmos shall be notified in writing promptly of any and all claims, liability, loss and expense for which CORR seeks indemnification from Atmos, and (ii) Atmos shall have sole control of the defense of any and all claims, liability, loss and expense and all negotiations for their settlement of compromise. 7. This Agreement shall be enforceable in Round Rock, Williamson County, Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for the same shall lie in Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 8. No party may assign its rights and obligations under this Agreement without the prior written consent of the other party, which consent shall not be unreasonably withheld, conditioned, or delayed. Notwithstanding the foregoing, it is understood that Atmos intends to contract the Relocation Services work to a general contract, which will in turn may subcontract all or part of the Relocation Services. 9. This Agreement shall be binding upon and inure to the benefit of the parties to this Agreement and their respective heirs, executors, administrators, personal representatives, legal representatives, successors and assigns, subject to the provisions of Section 8. 10. In case any one or more of the provisions contained in this Agreement shall be held to be invalid, illegal, or unenforceable in any respect, such validity, illegality, or unenforceability shall not affect any other provisions of the Agreement, and this Agreement shall be constructed as if such invalid, illegal, or unenforceable provision had never been contained in the Agreement. Effective date of agreement as of date of approved by the City Council: CITY OF ROUND ROCK ATMOS ENERGY CORPORATION By: By: Alan McGraw, Mayor Robert R. Cook Vice President, Operations Mid Tex Division ATTEST: By: Sara White, City Secretary APPROVED AS TO FORM: By: Stephan L. Sheets, City Attorney MATERJA1. PROIECTCOST ESTIMATE Chisholm TM* Rad -una LAO (d') Round Rock TX(W9lammnCounty) Cvmp0tsd by: 090 d SWORN) Mende 947247) Abgnnt 17.2M10 Complete Project Ballpark Estimate Bads Prior to Construction Bids ati Me Dsisfkastu Unit Coat 720 feet Mee Steel. 6'x 0287 WT. X42POE (1416 mas), ARO (30-40INs) 1 2501 hoot 618,00720 40 he Pipe. SteSE V x0287 Wf, X42, ME (14-18 MM) $ 1304 Root 6521.60 4 each E1.L Weld 6.210 Wf, 45 Deg, 3R C3 WWII 6 30288 each 61,21152 14 oath PowaroretsJElm, IQ(214 6 305* leach 351228 1 each Stepp%Toga CSANSI 300TDW S 678976 Mach 51,769.75 Small DalerMalarial (.Mimaled at 7% ofIsted maadal and Indigos 50011 *1,101.12 smai do*artoms such m Cathodal Pmtecton, PA. Madera, Pipt Coa*ng, aha) Store, lowing 00014 50.00 SlippinorDsnaportarAn 4 0014 5924 94 Stats Sates Tau 825% 81,607.58 Materials Overhead 3.0011 877086 TOTAL HATE/6AI. COSTS 5211,734.76 CO0IPANY Ut800 j4X)NT-OF•WAY 221111011213021 CONTRACT EXPENSE OAS LOS% WWI 0111 00 sours (Mentions 5 70.00 Aqui $4,200.00 72 haus Frgkrwkgwl0nnn,clon Management 5 7000 /nom 55,040.00 48 Num RI91041-Way $ 7000 Mow 33,360.00 24 Mus Environmental -Reim/ and Mgt $ 70.00 fiat 11.680.00 TOTAL COMPANY LABOR COSTS 314,210.00 Olot Temporary Workspace -RelocaTon 6 • Rot 5000 pamdmemmly Damages 5 day Contract ROW Agee TOTAL R4.WCOSTS (paymofl odsmen) $ 500.00 May 12,50000 10 lot ease C stfar6'StoatConstruction(Approx 580,00000 Aa 810' our steel ptpeenaInstated bybon, kdade% bat not Wad b Uukgkq.welding. tonctims. boring.hymam6r0, back 61 and Oe- fr (Moms Oaahxion Management) 1.0 lot Topping and Pampa Swami 5 7.05500 Aot (Amiyx'Erg50e TOW) TOTAL CONSTRUCTION C057e (per seep of wod0 32,600.00 880.000.00 *7066.00 $93,05600 3 dad )1ray 3 1.33000 /day *4.060.00 70 spurs Project Mana6amma 6 120.00 Moor $6,400.00 220 hour 612idea 1n. 3 100.00 Mow 822300.00 120 hams Wean ° $ 52.50 Mow 50.500.00 13 Wel itehterlfteeWide PrOilfflete $ 60.00 Mow 11.17000 14 hours Endremnantal lospaeioo Ona5g/PoslCawbud $ 22000 Max 5301000 15 day 301 Party InspoctIon 8 661.00 May KIM 00 2 day Sulam (P,psfm9C amine Staking) 11.750.00 AMy 33,60000 TOTAL CONTRACT EXPENSE COSTS 562,016.00 1 lot Gas LassfAksmato Wl(suoroaa 201 to nee $ 51000 Pall MAO eater WACO Nmpaartyfor MAIM 70224. 011411.038 COPS )TOTA1.080EC come 5510.00 5610.00 capon% Manama ([Aber, Cap 364 SU 360, (61UTTS) TOTAL WOIRECTCOSTS Franchise Fee Projects Reserves fa CAM andSUed.lwg Risks TOTALOTMER 0!4 15% 5199.094.761 *MOO 566,17918 $000 $43,211.21 543,211.21 `TOTAL ESTIMATED PROJECT COSTS 5331.286424 eluvautiOnitramth 1) No work* aosski(sand does nW du4 ante for Dust d5seoa t 2) Project mlaoe ed Ins:de odempAtnge Floats eseamra 71 CanfkucY,anasirmab polaris adaalCaabucapn 814: costs bub on Mad MIAs Enegy30510 win similar scopes of work 4) Commxi0n mil be hid as • bwbeyprimps/ toot mit coat 51CmoMg1-M pipe a n0w pared madhnMa maimed Mho Ottod 6) One gone* cangader kora Mapbon toamplagon mat Mom =agleam enavaaab8ya/mummer at am et award 7) Eseaals dem not %duatsoak for holdme'Module In ahem weather cona6ans 13 Candn.OknCOMM des not Ndndscosts armWldwihTadao Car#d and SWPPP 1) Ewaan8 Mae shag an abandoned in pian Prepared8y. CNshe a Tads tin 1.40 Cost Estimate Op6od 1-R e3C0mbated Ove4aadsxb CALCULATION OF ELIGIBILITY RATIO 89 feet of pipe on the proposed road right of way 47 feet of pipe on the proposed 18E +21 feet of pipe on the proposed 17E 157 feet of pipe on the project -71 feet of pipe on the existing road right of way 86 feet of pipe on private easement 86/157 = 54.78% reimbursable 71/150 = 45.22% at Atmos expense z a z 0 0 0 ISSUED FOR BID bI 3I tI�5E 11 13 MRdi.m..'�.lON4RM1vl4Lw910pAaq AM'�+V I.1 w1e Sid �YOnI iii e: s 6 i 1 .g s .€ 6 .g 5 aff .1 3 6 1 R 1 1 1 1 R 1 R 11 R 1 8 0 1 1 9d 5 5 S „I bxi it if gtits dig X X1 rig 11 11 11"Ibgg 11 WI; 41 6 ki 154 3kh i 1:94R 5 1 2 its 1g 11 5 IN 1P 11 14 1.1 14 or oll 1 %/1 le A* i't Pool in 15 .44 /5 IV gie IR5 $= Nal !gra r is If r X el N $ i d w ,. d i A hti! !ill 1115; ;b! eqii jk III �o x Ali 1Ill »!! 11 1 ;� �� ewe �ll! i IA d ! 'a 1 IN, vil! 0 al 411 8=4 "g 11 pep 14 i 7 ..- ei 1 1 bylg Agi ihrix 4 111,11 Iii 1 11 ill 4 4 4 d d a. d or d e '7 of f d J 7N1wpois7N 140s4suBM QIIw,wn444•4gamma. ISSUED FOR BID yr 0 tl N n n i01 OH1MHtld a � l I g F Nom ONf1OH d0 Al o g 3-91 1H3 gtl213 MOH O35OdO9d LLL 93 MOH UNU.5X3 v O-kWOiS tz 03SN' 1d Cl m NMI U32UdUad i2 I Goya tan a I a Id TI1HOZfHOH r N1Y210 NEWS 4.8f 03SOdOHd 1.• tl wYYte ' V 1QL.14 31.11 121.11 .41 9350408d 37 rx / oonn _ tl } N 0 N 8 aQi 8 1 8 ■ 2 E O ..ccn U W 2W 3 ROUND ROCK, TEXAS PURPOSE PASSION. PROSPERrrx Agenda Item No. 9F2. City Council Agenda Summary Sheet Agenda Caption: Consider a resolution authorizing the Mayor to execute a Reimbursement Agreement with Atmos Energy Corporation for the relocation of a gas pipeline required by the Chisholm Trail Improvements Project. Meeting Date: October 14, 2010 Department: Infrastructure Development and Construction Management Staff Person making presentation: Danny Ha!den, P.E. City Engineer Item Summary: Atmos has a single high pressure gas line that is in conflict with the proposed Chisholm Trail improvements. The City has requested that Atmos relocate their gas line to accommodate the proposed improvements. Atmos currently has an easement for its gas line except for the area within the old right-of-way of Chisholm Trail. Because Atmos' easement remains outside the old right-of-way boundaries of Chisholm Trail, the City is obligated to fund a pro rata share of the gas line relocation. Strategic Plan Relevance: 22.0 Foster transportation systems that would support the development of major density centers 26.0 Construct major element of the transportation and mobility system as approved by Council in the Master Transportation Plan Cost: $181,478.92 Source of Funds: 2002 General Obligation Bond Date of Public Hearing (if required): N/A Recommended Action: Approval EXECUTED DOCUMENT FOLLOWS REIMBURSEMENT AGREEMENT This Reimbursement Agreement ("Agreement') made this Wil day of 1y4 2010, by and between ATMOS ENERGY CORPORATION, a Texas and Virginia corporation, having a business address at 5420 LBJ Freeway, Suite 1800, Dallas, Texas 75240 ("Atmos") and the CITY OF ROUND ROCK, a Texas home -rule municipal corporation, having a business address at 221 East Main Street, Round Rock, Texas ("CORR"). and WITNESSETH: WHEREAS, CORR is widening Chisholm Trail Road (the "Project"); and WHEREAS, Atmos has a gas lines that are in conflict with the CORR's project; WHEREAS. CORR has requested that Atmos relocate or cause to be relocated their gas lines to accommodate the proposed improvements; and WHEREAS, Atmos has agreed to the relocation it facilities as shown on the plans attached hereto as Exhibit "A" and made a part hereof ("Relocation Services") and has prepared a good faith cost estimate set forth on Exhibit "B" attached hereto and made a part hereof ("Estimate"); and WHEREAS, CORR agrees to reimburse Atmos for the actual expenses incurred by Atmos related to the Relocation Services requested by CORR. NOW, THEREFORE, in consideration of mutual promises contained herein, the parties agree as follows: 1. Atmos agrees to provide the Relocations Services to install approximately 661 feet of 6 -inch steal pipeline know and designated as Line L40, abandon approximately 611 feet of existing 6 -inch steel gas pipeline. The starting date will be fixed by mutual agreement of the parties hereto and Atmos shall use commercially reasonable efforts to complete the Relocation Services in accordance with the Schedule, subject however, to delays caused by persons or events outside the reasonable control of Atmos. 2. The actual cost of the relocation is estimated to be $ 331,285.92. CORR agrees to reimburse Atmos the actual costs of the Relocation Services, an amount estimated to be $181,478.92. Atmos shall submit to CORR a detailed written report itemizing the total costs incurred, including all supporting information documenting all amounts incurred for which reimbursement is claimed and verifying that the Relocation Services are in accordance with the requirements of this Agreement and that any change orders increasing the cost for the Relocation Services above the threshold described below were submitted and approved by CORR prior to incurring such additional costs. Upon Completion of the Relocation Services, Atmos shall present CORR with 1Z-1D-to-1q--cI, Z shall present CORR with a detailed invoice of the actual Relocation Services performed and CORR agrees to make, within thirty (30) days from the date of the properly detailed invoice, a one-time reimbursement payment of the actual costs. In the event, after actual solicitation of bids, the estimated costs of the Relocation Services exceed the Cost Estimate by 10% or more, then, prior to incurring such additional expense, Atmos shall submit the additional costs to CORR for approval, which approval shall not be unreasonably withheld, delayed, or conditioned. Any request for approval made by Atmos in writing and not specifically approved or disapproved within 5 business days shall automatically be deemed approved by CORR. Neither enhancement nor betterment costs shall be reimbursed by CORR. 3. The obligation of CORR to make a cost reimbursement payment under this Agreement does not constitute a general obligation or indebtedness of CORR for which CORR is obligated to levy, pledge or collect any form of taxation. 4. The parties agree to exercise all due caution while causing any work to be done near the gas line in order to prevent damages to the gas line. 5. Not withstanding any other provisions of this Agreement, in no event shall either party be liable to the other for any indirect, consequential or incidental damages, including but without limitation, loss of revenue, loss of customers or loss of profits arising from the Agreement and the performance or non- performance of obligations hereunder. 6. Atmos agrees to indemnify and hold harmless CORR, its agents and employees, against and from any and all liability, loss and expense and shall defend all claims, resulting from the loss of life or damage or injury to persons or property directly or indirectly resulting from the work performed by Atmos to the extent such loss, damage or injury, is caused by the negligence or willful misconduct of Atmos or its agents or arises out of or in connection with the Relocation Services. As a necessary condition for such indemnity to be enforceable against Atmos: (i) Atmos shall be notified in writing promptly of any and all claims, liability, loss and expense for which CORR seeks indemnification from Atmos, and (ii) Atmos shall have sole control of the defense of any and all claims, liability, loss and expense and all negotiations for their settlement of compromise. 7. This Agreement shall be enforceable in Round Rock, Williamson County, Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for the same shall lie in Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 8. No party may assign its rights and obligations under this Agreement without the prior written consent of the other party, which consent shall not be unreasonably withheld, conditioned, or delayed. Notwithstanding the foregoing, it is understood that Atmos intends to contract the Relocation Services work to a general contract, which will in turn may subcontract all or part of the Relocation Services. 9. This Agreement shall be binding upon and inure to the benefit of the parties to this Agreement and their respective heirs, executors, administrators, personal representatives, legal representatives, successors and assigns, subject to the provisions of Section 8. 10. In case any one or more of the provisions contained in this Agreement shall be held to be invalid, illegal, or unenforceable in any respect, such validity, illegality, or unenforceability shall not affect any other provisions of the Agreement, and this Agreement shall be constructed as if such invalid, illegal, or unenforceable provision had never been contained in the Agreement. Effective date of agreement as of date of approved by the City Council: CITY OF ROUND ROCK By: Alan McGraw, Mayor ATTEST: By: Sara White, City Secretary APPR By: D AS TO ' ORM: Step J n L. Sheets, City Attorney ATMOS ENERGY CORPORATION By: 1 �'o.ertR. ok e President, Operations Mid Tex Division 331,, j$0,94 MATERIAL PROJECT COST ESTIMATE Chisholm Trail Road -Una L-40 (8") Round Rock, TX (Williamson County) Completed by: David Bul (UEO (Conf g 947297) August 17, 2010 Complete Project Ballpark Estimate Basks Prior to Construction Bids gC Desafotion Unit Cost 720 feel Pipe, Steel, 8" x 0.280' WT, X42, FBE (14-18 mils), ARO (30-40 mils) $ 25 01 /foot 40 feet Pipe, Steel, 0" x 0.280' WT, X-42, FBE (14-16 mils) 818,007 20 4 each ELL Weld 8", .280 WT, 45 $ 02.84 /foot 5521.60 Dag, 3R CS WPB $ 302.86 each 51,211 52 14 each Powercrete J Epoxy Kit (2 Ib( $ 38 59 /each $512 28 1 each Stopple Tee 6 CS ANSI 300 TOW $ 1,78975 /each 51,789.75 Small Dollar Material (estimated at 7% of listed material and includes 5.OD% 51,101.12 small dollar items such as Cathodic Protection, P/L Markers, Pipe Coating, etc) Stores Loading 0 00% 50,00 Shipping/Transportation 4..00% $924.94 State Sales Tax 825% 61,907.68 Materials Overhead 3.00% 5778.88 TOTAL MATERIAL COSTS COMPANY LABOR RIGHT -OF -WA'( CONSTRUCTION CONTRACT EXPENSE. GAS LOSS Indirect Other 80 hours Operations 72 hours Engineering/Construction Management 48 hours Right -of -Way 24 hours Environmental - Review and Mgt. TOTAL COMPANY LABOR COSTS 0 lot Temporary Workspace - Relocation Ground/Properly Damages 5 70.00 /tour $ 70 00 /flour $ 70,00 /hour $ 70.00 Ihour • /101 526,734,75 $4,200.00 $5,040.00 $3,360.00 51,680.00 514,280.00 50.00 5 day Contract ROW Agent $ 500,00 /day 52,500.00 TOTAL RAW COSTS (payments to landowners) $2,500.00 1.0 lot Base Cost for 6' Steel Construction (Approx. 586,000,00 dot 588,000.00 640' of 8" steel pipeline installed by bore, includes, but not limited to stringing, welding, trenching, boring, hydrotesting, back fill and Ite- m) (Atmos Construction Management) 1.0 lot Tapping and Plugging Services 5 7,055.00 dot 97,055,00 (AnalysUEngineer/TD W) TOTAL CONSTRUCTION COSTS (per scope of work) 593,055.00 3 day X-ray $ 1,350.00 /day 70 hours Project Management $ 120,00 /hour 220 hours Engineering 5 100:00 /hour 120 hours Drafting $ 82.50 /hour 13 hours Assistance with Material Procurement $ 90.00 /hour 14 hours Environmental Inspection During/Post Construct $ 220.00 /hour 15 day 3rd Party Inspection $ 861.00 /day 2 day Survey (Pipeline Conteriine Staking) 5 1,750 00 /day TOTAL CONTRACT EXPENSE COSTS 1 lot Gas LossIAltemate Fuel (assumes line to be 5 510.00 not taken out of service temporarily for tie-ins) TOTAL GAS LOSS COSTS TOTAL DIRECT COSTS „ Corporate Overhead (Labor, Corp A&G, BU ABG, RHUTTS) TOTAL INDIRECT COSTS Franchise Fee Projects Reserves for Cost and Scheduling Risks TOTAL OTHER 0% 15% 54,050,00 58,400.00 922,000,00 59,900,00 51,170,00 53,080.00 99,915.00 $3,500.00 562,016.00 5510.00 5510.00 $88,979..98 588,979.96 50.00 543,211,21 543,211.21 TOTAL ESTIMATED PROJECT COSTS Assumalions/Commenls 1) No waterbody crossings and does not include costs for karst discovery 2) Project relocated inside existing Atmos private easement 3) Construction estimate prior to actual Construction Bids; costs based on recent Atmos Energy jobs with similar scopes of work 4) Construction will be bid as a tum -key once per foot unit cost 5) Crossings - All pipe under paved road/surface assumed lo be drilled 6) One general contractor from inception to completion and prices contingent on availability of contractor at time of award 7) Estimate does not include costs for holding schedule in extreme weather conditions 8) Construction Estimate does not include costs associated with Traffic Control and SWPPP 9) Existing pipe shall be abandoned in place Prepared By: Chisholm Trail Line L40 Cost Estimate Option 1 - Rev 3 Combined Overheads uds CALCULATION OF ELIGIBILITY RATIO 89 feet of pipe on the proposed road right of way 47 feet of pipe on the proposed 18E +21 feet of pipe on the proposed 17E 157 feet of pipe on the project -71 feet of pipe on the existing road right of way 86 feet of pipe on private easement 86/157 = 54.78% reimbursable 71/150 = 45.22% at Atmos expense I:1ATMM05\11595 Chisholm Tri line L -40111E1 Dwgs9FCR1UEI-947297-11595-1101.dwg, 8/192010 9:37:02 AM, 1:1 w w w £OE L -56S L L-L6ZL46-13f1 3113OL1d ONV NVId ZOZ L -56S L L-L6ZL46-13f1 VIVO 3d1d / S31ON 1VN3N30 LOL LS69 L 1.-L6ZL46-13f1 X30 NI / 133HS LI3A03 z 0 'X30NI DNIMVLIO Z m C1) V) m 0 -n0 00 0 I:WTMOS111595 Chisholm Trl Line L-401UEI DwgsOFCRWEI-947297-11595-1202dwg, 8/19/2010 9:36:49AM, 1:1 O 6 m 0HO -00 55TQ0 0 o Z a d1(DjoA co*- Z ° 'T1 .X01 mo mrQ> 0 o1F cg foi =m -� Zx DZF Oz do wt0 mE m-aN ZM TI X 01;0 C I -(>0 C j /41(n ON mm- • V4A rpn rrnzoaERI m m pc > 1 o > - -0 1 A 820:4 g04 mm mQ (Ax • 0, x x P N o F Cllne 01 a010VlL.N00 TO ELEVATIONS NOT DEPTH OF COVER. cwrcw0 Imo uicm Sm1m1Qn Sm•0 O v1 > Z n Ozpoff)u, SQ-z>z> mrap{C{� f*1 > C.. , Z oz m^vr z j O1 o x mpy'm0F 1`1m 000 MN 0m0 Sq o f Z - Z"� J Z z(mn0 2>mz 1 0 1 0.x) -`-11Z(,11 Z j 1x'1 m(A'1>0 W d *03 0CUl y �S° AfOn go>�x� ro*1 O(nFD-Mui Di -I:1 > 0 -1 13 Fz 6..12 u> N N O-4 0r--111.- O -I (1 x0 � o D (/1 z ed Z aFF2-< en N ▪ O f0 o0OzM13-10m Z 0 LA 0;00>o zzp 2z Fr 0 N m=°1 1 8 O O A Z z I TA 0>N1 z{n1� 1mm rmNc1 tC ti 0 1 C C P1 0 Co^0 - Z N 0 u D Z O 1r�mm AR POm F,Cm z8m((�� mzo ,2. c Z;2 (Dnp° 211 y2 D=r' a 47x2 � C 0 mF ozp> Z -v( xm 00Z Zw0 xQ° x0 10 Com ,Co 62 D p 0 00 1 ; 0-1 >p Zpz 1.10 FA zz> m-< xr --1 m 1 x rn z13g2 PC v oz oA 1 xr Doo DVDID xD 1�' 0 �mrr >o FO Z > -r cpm c N z > O r Am m mi v> moj2oc,oc 'momo >om:olmakai o. nzNpzfE•�L z; x EM dO >; OM U> Om F2x Z Dv m z -( . z 41, p >o. 1> 0 g. 0 k-(z�z 00 > oxD1^c) ow ~RI ZOZX 1n m cz rrl i!rFDcmn C14- -1E73.2(620 44; Mmosco� C1mc- 28w -i' 0 x m m 4 o� > mm 0O rZnZ F-zOzmm c m 04(n=m z z :,1O 0Nmonv oi Op W Cm SLI Z Z MO 0 p m m r A W N > O O -C - z O OZ 002 (n opmz00 z z o z Nmdqz- u) m u 0 �,, Z>O-i 0 xzzN S�zz m >x� O<O N Om m z1{N OC>Z -ZOO caz22 mAc 74m 00 V Of OD V OI (/1 C0C-D ZQZM 0>0o m OO c O c zzz> v=vo (Fmz � m z zmZN 0 J z Mme �gw P -o0 1:173z Z 0 m .-I 28 D Cu) ZX cvc 0 OdZ 0 mz 0 ALL DISTANCES SHOWN ARE HORIZONTAL SURFACE DISTANCES. (n ? w 0 O0 xD 00mo m m 0-00 OMC op o m A m f1r Dmmo FA"moz mvo�2zm 5d 6 M0 z N g mZ„_D1 ,z, W:12o�� < a �w A;' -D'z-i�(-1i 2m soc� •< 0 71* [An 1 Z11A t) m D Cr;nmzolm'1z >530 m 10x2 En A>RZZZp pzz v;> ”=o wmzN >F 51.~fig p- m Izmm Inym m mo1 Kzm�o0z o> 0 omR-1 z • 0 -10 2xmm>r� zrl -i* 0�0 z '1O - m02 < 0 Z Oi . x iZZmm M�z o- m- com R> ZD 1�1wo m v m Z x 2V z m o m1; - rD z m D Dm2 -6 ZOmM>ZTICo O O n- 1 D° O 2z m.0 w- m 0 DEz;*-i_ 01--n rui • (n Z O C- TY -)1 mOF�*18oRm go 0,0,,," 0g1 ;mm5(m,10zci > m 1 dr! 001 5 HI z 3111 NIHLNA S313IH3A 2113111 )RIVd 01 N D ^ mzm 0Z m.mpm inmC 1l��1. �4zZ go v 1� 04mg ; m ci m m 1 C > 0( 1.prnDz 1 D ut 4- or2*mxD u)2 Q0 7"o i zi zI O ma F coo$ I 17,1 0 N xZ_.. Ro Z CA DrNe1ZOD p nr2 100 cx F 7•x'1'0 pg .g.2. o f -I \. y z "' A u 0>u) m a> $11 z6 ° g> Oa `yx4 0 O>4 I*1 m c c IQ m 1321.- 0 ❑D❑D ❑y 2 Z1zm0>ZM2xDDYmI OnZ �'mOu)MZmOpUD-( *9 d 0 »�Z Myy-1120 1 -<_.> Nto ;O ON >Vz3 mpm>A 0 o (fl im9m 2 D v1 0 - 2 :- Qzmoz �() m .. z .I(, Zmcn .4 —I m mr m m -I -1 x > 0 O = r,DD Aorto O c0'dm0 rmr(>nzD� f- �`>1 (mil.- o1pz 1 vZZjZ Zm�OO I0 1Dz"A' zo Om v dm O'1cm(n ` -I10,13m m> ..0 mz• 0z z m C z CITY OF ROUND ROCK GENERAL CONSTRUCTION NOTES: 0 (21D1OV3 NO11VONO171) (J) m 0 T • 1 0 coZ7 W C) OO co - m z r 9 z CA y 0 02 m kl> (? >0 A A z O g 53Z a 9 m OZ OrZ'1ZD0Z x0 oz SZzVVm $�dim >0 zmim8i"aa ?omo ,pri20xm A 0 1'1 v1 O(�nT1 D 2 0 Z N Z z A oQ ZOZ1)IZ 2,3 m -,E9(Ons 110 rxj> op >cz0m 4. sm mmzZ2 >= 0� oD mo z1� M zz mm m �$ ;gym -n oo �mmz4 m z Om V1N>>� R I 6> '-nzeRD > Vl � 00 sl>mc -oD ov' ><>` 90 Pm Z0= 0 �1tn 1z z 00 z4 c) cnc�x> mmx 0ry omm>z c{ E "11g m 1oN c x NOLLV3U ]d5 ONIQ13M O m N N T N U Of O v O 0 S 0, 3x� x O w A F U 4- tl r i a 91 0 53rZ 0,m 41ti N O N SIN3W381f10321 ONLLS31 XVII O 1 t S G =o 3118V18dad 1391S I:IATM051115g5 Chisholm TO Uri. L -011.1E1 OwpIVFCAYJEI•947227.115Y5 17W0wp, 523/!0103'35.53 PM, 1,1 W N O 0 0 0 0 0 0 0 fat PROPOSED 12" WATERLINE G4 0 DDI�TI[*1 mz D c 4 O 0 p m! tri HORIZONTAL PI FL=731.2 PROPOSED 36 STORM DRAIN 4' MINIMUM (41 FL=732.4 -PROPOSED-24' STORMLLDRAI 10.1' DEPTH 11,3 DEPT -'--T"EASEMENT17-E- (CITY OF ROUND ROCK) PROPOSED ROW CR 173 EXISTING ROW CR 173 { CL CR 173 FL=733.2 V O 0 13 U3 0 O m'm r0 z mm rn it N rn _4m m rz �O Q D A u X t -o m Z ((.J m r. S EXISTING ROW CR 173 -o PROPOSED ROW CR 173 0 0 EASEMENT 18-E N u) m rnCn r'� z O O D m rn I'1'I r4 z' o) 12 (CITY OF ROUND ROCK) / 0 fT1 / / / m u) z O O 0 c z 0 PARKING LOT 1.4 yrs y IX3/2i31N3 -MO EXISTING 50' GAS EASEMENT 10,0' (}10 LO --14163S 13.0 Mph 0350 S X3 j " Mo) 9N dopa 01 0350 0344o-- 30 -is IS ,0'Ot. CJ) (1) m -n0 0 co 0 C0 n -71