Loading...
CM-2017-1588 - 12/18/2017STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FOR ON-CALL STRUCTURAL ENGINEERING SERVICES WORK AUTHORIZATION FIRM: AGUIRRE & FIELDS L.P. ("Engineer") ADDRESS: 12708 Riata Vista Circle, Suite A-109, Austin, TX 78727 This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Aguirre & Fields, L.P., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 13th day of November, 2014 for the On -Call Structural Engineering Services Project in the amount of $50,000.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. I on July 14, 2016 to amend the Contract to modify the scope of services, to modify the fee schedule, to extend the contract term to December 31, 2017, and to increase the compensation, and; WHEREAS, it has become necessary to amend the Contract to modify the fee schedule; and WHEREAS, it has become necessary to amend the Contract so that the contract term shall terminate at the close of business day on December 31, 2019; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Exhibit C. Fee Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 3. Contract Term shall be amended so that the contract term shall terminate at the close of business day on December 31, 2019. ekt--Z ot-7-1,<--ff Supplemental Contrail 0199 1467;00391305 Rev.06/16 84275 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [sigl7alttre pages follotiv] Supplemental Contract Rev.06/16 0199 1467.00391305 84275 AGUIRRE & FIELDS, L.P. AGUIRRE, LL - GENERAL PARTNER By: .—�— Oscar R. Aguirre. P.E., President December 11, 2017 Date Supplemental Contract Rev.06. 16 0199 1467.00391305 84275 CITY OF OUND ROCK APP O ED AS O FO -I: sy: � Laurie Hadley, City Manager0 Stepha L. Sheets, City Attorney 1211L -t-7 Date Supplemental Contract Rev.06/16 0127 1430, 00391096 84275 ADDENDUM TO EXHIBIT C Fee Schedule The table below provides fully loaded fee rates to be used to calculate the costs of services shown in Exhibit 8 "Engineering Services" that are selected and authorized by the City through a separate Work Order. Each separate Work Order shall delineate a maximum dollar amount that the Engineer may invoice the City for the services specified in the Work Order; and the amount of any invoice issued by the Engineer to the City shall be accounted for by the hours of the Engineer's personnel performing the services multiplied by the corresponding rates below: PERSONNEL RATE Senior Structural Engineer $200.00/hour Project Manager $200.00/hour Project Engineer (Field) $185.00/hour Construction Engineer $170.00/hour Structural Engineer $145.00/hour Structural Inspector $135.00/hour Senior Inspector $115.00/hour Engineer -in -Training (EIT) $105.00/hour Inspector $90.00/hour Technician $70.00/hour City of Round Rock ROUND ROCK Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 2 with Aguirre & Fields, L.P. for On -Call Structural Engineering Services Work Authorization. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/15/2017 Dept Director: Gary D. Hudder, Transportation Director Cost: $0.00 Indexes: Attachments., SC#2 w -Aguirre Fields - On -Call Structural Engineer Services.pdf Department: Transportation Department Text of Legislative File CM -2017-1588 This contract is to perform miscellaneous Geotechnical Engineering tasks on an "as needed" basis for immediate tasks deemed necessary by the CORR Staff, including but not limited to, geotechnical test borings, geotechnical field testing, geotechnical laboratory testing, geotechnical engineering reports, pavement thickness recommendations, review of geotechnical reports for conformance with CORR standards, slope stability analyses, subgrade treatment I stabilization recommendations, geotechnical retaining wall recommendations, review of plans and specifications, pavement condition surveys, review of material submittals, and consulting with the CORR staff on an as -needed basis. This work authorization contract supplement with Aguirre & Fields, L.P. is for an extension of the original 2 year period of time to now end on December 31, 2019. City of Round Rock Page 1 Panted on 12tl&2017