R-10-10-14-9F9 - 10/14/2010RESOLUTION NO. R -10-10-14-9F9 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with RGM Constructors, L.P. for the Wyoming Springs Drive Improvements Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 5, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 5 to the Contract with RGM Constructors, L.P. for the Wyoming Springs Drive Improvements Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of October, 2010. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: Ov444,. a1rVjv SARA L. WHITE, City Secretary O:\w do x\SCCInts\0l 12\ 1005\MUNICIPAL\002044I4.DOC/rmc rev. 1/10 Contract Quantity Adjustment/Change Order Department: Transportation Administration Project Name: WYOMING SPRINGS DRIVE IMPROVEMENTS City Project ID Number: TX04WY0 Justification Date: Page 1 of 3 9/8/2010 Change Order/Quantity Adjustment No. 5 IRRIGATION REPAIRS FOR COMMUNITY CITY, BLADE LAY ASPHALT FOR INTERSECTIONS (KEPT TRAFFIC OPEN TO THE PUBLIC) AND QUANTITY ADJUSTMENTS SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by: Contractor Approval: aty Staff Approval: City Official Approval: Signature Signature ignature Amount $2,050,016.90 $2,127,641.49 $132,988.35 $52,095.32 $185,083.67 $77,624.59 $96,104.05 $173,728.64 $2,408,829.21 1111111111111 280 318 318 6.25% 2.45% 8.70% MATT GOLD PROJECT MANAGER RGM CONSTRUCTORS, Printed Name, Tide and Company MATT GOLD PROJECT MANAGER RGM CONSTRUCTORS, Printed Name, Title and Company Mels. Printed Name and Title L.P. 9/7/2010 Date L.P. 9/7/2010 Date ^!7-ld Date Signature Printed Name and Title 4 EXHIBIT „ A„ • Date rev. 01/10 Contract Quantity Adjustment/Change Order Chan . e Order Data Page 2 of 3 Bid Item# 190 191 Item Descri • tion and Chan • e Unit LS TN IRRIGATION REPAIR TY A HOT MIX - INTERSECTIONS Unit Price Amount Contract Time Adjustment Da s 1 $4,075.32 $98.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 TOTALS: 490 $4,075.32 $48,020.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 miiimmii0.00 $0.00 mminem $52,095.32 0 rev. 01/10 Contract Quantity Adjustment/Change Order Page 3 of 3 Bid Item# 4 10 12 15 18 20 85 87 105 112 179 182 • uanti Ad'ustment Data Item Descri • tion and Chan e REMOVING CEMENT SIDEWALK TACK COAT HOT MIX ASPHALT PAV C 2" PC CONC SIDEWALK PC CONC DRIVEWAY ADJUST WATER METER CONDUIT (RM)(1") CONDUIT (PVC)(SCHD 80)(2")(BORE) CONDT (PVC)(SCHD 80)(3")(BORE) ELEC CODR (NO.08) BARE ONCOR GROUND BOXES ELECTRICAL WIRE (NO.08) INSUL Unit SF GAL TON SF SF EA LF LF LF LF EA LF Contract Time Adjustment Da s 10000 88 511.16 12557 1830 1 33 793 50 374 28 2458 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 29.50 23 393.50 31.00 1 550.00 1.05 392.70 495.66 13 878.48 2.70 6 636.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTALS: 0.00 96 104.05 0 ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY Agenda Item No. 9F9. ity Council Agenda Summary Sheet Agenda Caption: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 5 with RGM Constructors, L.P. for the Wyoming Springs Drive Improvements Project. Meeting Date: October 14, 2010 Department: Infrastructure Development and Construction Management Staff Person making presentation: Tom Word, P.E. Chief of Public Works Operations Item Summary: Change order No.5 is needed for this contract because of necessary irrigation repairs and buying of asphalt at intersections. Quantity adjustments to the contract were also necessary to account for additional quantities in line item in order to complete the work. Amount % Change Original Contract $2,050,016.90 N/A Previous Quantity Adjustments $77,624.59 N/A Quantity Adjustment No. 5 $96,104.05 N/A Previous Change Orders $132,988.35 6.25% Change Order No. 5 $52,095.32 2.45% Revised Contract Total $2,408,829.21 8.70% Strategic Plan Relevance: Goal No. 26.0: Construct major element of the transportation and mobility system approved by Council in the Master Transportation Plan. Cost: $148,199.37 Source of Funds: Round Rock Transportation Development Corporation Construction Date of Public Hearing (if required): N/A Recommended Action: Approval EXECUTED DOCUMENT FOLLOWS �kIAMU N(K:K, Ik%AS rev. 1/10 Contract Quantity Adjustment/Change Order Department: Transportation Administration Project Name: WYOMING SPRINGS DRIVE IMPROVEMENTS City Project ID Number: TX04WYO Justification Date: Page 1 of 3 9/8/2010 Change Order/Quantity Adjustment No. 5 IRRIGATION REPAIRS FOR COMMUNITY CITY, BLADE LAY ASPHALT FOR INTERSECTIONS (KEPT TRAFFIC OPEN TO THE PUBLIC) AND QUANTITY ADJUSTMENTS SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by: Contractor Approval: City Staff Approval: Amount $2,050,016.90 $2,127,641.49 $132,988.35 $52,095.32 $185,083.67 $77,624.59 $96,104.05 $173,728.64 $2,408,829.21 % Change 6.25% 2.45% 8.70% 280 318 318 Signature Signature MATT GOLD PROJECT MANAGER RGM CONSTRUCTORS, L.P. 9/7/2010 Printed Name, Title and Company Date MATT GOLD PROJECT MANAGER RGM CONSTRUCTORS, L.P.9/7/2010 Printed Name, Title and Company Date City Official Approval: ignature gnature ti ( Printed Name and Title NA 4lity Printed Name and Tide Date 1.0. I4- tL) Date rev. 01/10 Contract Quantity Adjustment/Change Order Page 2 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 190 191 IRRIGATION REPAIR TY A HOT MIX - INTERSECTIONS LS TN 1 $4,075.32 $4,075.32 490 $98.00 $48,020.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTALS: $52,095.32 0 "ROUND ROO( TEXAS rev. 01/10 Contract Quantity Adjustment/Change Order uantity Adjustment D Page 3 of 3 TOTALS: $96,104.05 0 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) , 4 REMOVING CEMENT SIDEWALK SF 10000 $1.25 $12,500.00 10 TACK COAT GAL 88 $3.10 $272.80 12 HOT MIX ASPHALT PAV (TY C) (2") TON 511.16 $53.00 $27,091.48 15 PC CONC SIDEWALK SF 12557 $0.32 $4,018.24 18 PC CONC DRIVEWAY SF 1830 $3.10 $5,673.00 20 ADJUST WATER METER EA 1 $425.00 $425.00 85 87 105 112 179 182 CONDUIT (RM)(1") CONDUIT (PVC)(SCHD 80)(2")(BORE) CONDT (PVC)(SCHD 80)(3")(BORE) ELEC CODR (N0.08) BARE ONCOR GROUND BOXES ELECTRICAL WIRE (N0.08) INSUL LF LF LF LF EA LF 33 $8.25 $272.25 793 $29.50 $23,393.50 50 $31.00 $1,550.00 374 $1.05 $392.70 28 $495.66 $13,878.48 2458 $2.70 $6,636.60 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTALS: $96,104.05 0