Loading...
R-10-10-28-10E3 - 10/28/2010RESOLUTION NO. R -10-10-28-10E3 WHEREAS, the City of Round Rock has duly advertised for bids for the 2007-08 Wastewater Collection System Rehabilitation of seven sub -basins, and WHEREAS, Enviro Remediation has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Enviro Remediation, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a construction contract with Enviro Remediation for the 2007-08 Wastewater Collection System Rehabilitation of seven sub -basins. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of October, 2010. yh. /L ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: 1/14AIL* 01/17tt SARA L. WHITE, City Secretary O:\wdox\SCCInts\0112\ 1005\MIINICIPAL\00205720. DOC/rmc ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY Agenda Item No. 10E3. City Council Agenda Summary Sheet Consider a resolution authorizing the Mayor to execute a construction contract with Enviro Agenda Caption: Remediation for the 2007-2008 Wastewater Collection System Rehabilitation Project. Meeting Date: October 28, 2010 Department: Infrastructure Development and Construction Management Staff Person making presentation: Danny Halden, P.E. City Engineer Item Summary: The bid opening for the 2007 — 2008 Wastewater Collection System Rehabilitation- Basins BC23-Z, LC18-Z, LC19-Z, 0C25 -Z, 0C26 -Z, 0C27 -Z, and 0C29 -Z was held on September 28, 2010. Two sealed bids were received. This project will correct wastewater system defects previously identified. The areas of rehabilitation include neighborhoods in the vicinity of Bowman Road, Sam Bass Road, RM 620, and McNeil Road. It is the recommendation of RJN Group, Inc. to award the contract to Enviro Remediation Strategic Plan Relevance: Goal 28.0 Protect public health and protect the environment through proper waste disposal. Cost: $716,552.20 Source of Funds: Self -Financed Wastewater Construction Date of Public Hearing (if required): N/A Recommended Action: Approval