R-11-01-27-14B2 - 1/27/2011RESOLUTION NO. R -11-01-27-14B2 WHEREAS, the City of Round Rock has previously entered into an Advanced Funding Agreement ("Agreement") with the Texas Department of Transportation ("TxDOT") for the FM 1460 (A. W. Grimes North) — Old Settlers Boulevard to University Boulevard Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Agreement in accordance with the attached Construction Contract Change Order No. 14, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Construction Contract Change Order No. 14 to the Agreement with TxDOT for the FM 1460 (A. W. Grimes North) — Old Settlers Boulevard to University Boulevard Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of January, 2011. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary O:\wdo x\SCCInts\0112\ 1104\MUNICIPAL \00211771.DOC/rmc TEXAS DEPARTMENT OF TRANSPORTATION CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 014 Third Party Funding Notification Sheet This form is used when the subject change order involves funding by a source other than TxDOT/U.S. DOT, and involves third parties who are providing funding under an Advance Funding Agreement or Donation Agreement. 1. Outside funding provided by: City of Round Rock (Outside Entity's Legal Name) 2. Type of outside funding agreement for this change: FT Existing R. Amended [ Check one) E New 3. Indicate the type and amount of funding: I-' Fixed Price (Lump Sum) (Estimated Amount $113,31937 fg Actual Cost (a) Contract Items (Bid Items): $113,31937 (b) E&C*: (a) x 0 0 enter % (c) Indirect Cost": (a + b) x 0 = 0 enter % Date TOTAL l f3r314. 37 CCSJ: 2211-02-021 Project: STP 2009(866)ES Highway: County: District: FM 1460 Williamson Austin Contrail 08093008 Number: Use as needed: I hereby acknowledge notification of the modifications covered by this Change Order. By Typed/Printed Name Typed/Printed Title "The percentage (%) for E&C (Engineering and Contingencies) charges varies from project to project depending on the contract amount of the project. Projects with a higher contract amount will have a lower rate of E&C charge. For a specific project E&C rate (96) can be derived from the cost of "Engineering and Contingencies" in the "Estimated Cost" of the project. "" Use the statewide district rate as established by Finance Division each year. This line 3(c) Is for Service Project only, unless otherwise specified in the Advance Funding Agreement. See Stand Alone Manual Notice 98-2 for instructions. Funding for this Change Order has been arranged: TxDOT Representative Typed/Printed Name: Date TXDOT Form 2146-AFA (Rev. 7/2007) Page 1 of 1 EXHIBIT „A„., // /� Contact/Help Print Form: ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY Agenda Item No. 14B2. City Council Agenda Summary Sheet Agenda Caption: Consider a resolution authorizing the Mayor to execute Construction Contract Change Order No. 14 with TxDOT for the FM 1460 (A.W. Grimes North) — Old Settlers Boulevard to University Boulevard Project. Meeting Date: January 27, 2011 Department: Infrastructure Development and Construction Management Staff Person making presentation: Tom Word, P.E. Chief of Public Works Operations Item Summary: On May 14, 2009 the City Council executed an Advanced Funding Agreement (R -09-05-14-9G7) with the Texas Department of Transportation regarding the funding and construction of FM 1460/A.W. Grimes Boulevard between University Boulevard and Old Settlers Boulevard. In reviewing the construction plans for this project, the City has identified areas in which additional work will increase the operational efficiency of two intersections within the limits of the A.W. Grimes Boulevard project. This work involves the intersections of A.W. Grimes Boulevard/University Boulevard and A.W. Grimes Boulevard/County Road 112. Work to be conducted includes the restriping of these intersections, along with the addition of some pavement to the east of these intersections to allow the use of turn lanes on A.W. Grimes Boulevard. This work will allow for the final lane alignment at these intersections. Completing these improvements as a part of this project will have the dual benefit of saving the city future costs and inconvenience to the public, as these improvements will be necessary when any work is undertaken on either University Boulevard or CR 112 east of A. W Grimes Boulevard. Funding for the A.W. Grimes Boulevard project (including change orders) was approved by the Round Rock Transportation System Development Corporation and the City Council on April 10, 2008 (R -08-04-10-11B1); however, upon final accounting additional funds may be required for this project. Therefore, this change order is presented for the Council's consideration. Strategic Plan Relevance: 26.0 Construct Major Elements of the Transportation and Mobility System Cost: $113,319.37 Source of Funds: Round Rock Transportation System Development Corporation Date of Public Hearing (if required): N/A Recommended Action: Approval HUGGINS/SEILER & ASSOCIATES, LP Conrn/1in8 Er ineers Contract ID: 2211-02-021 (FM 1460) Project No.: STP 2009(866) ES Change Order No. 14 Summary of Quantity and Cost Changes - CoRR University Blvd. East ITEM ORIGINAL PROJECT QUANTITIES CHANGE ORDER QUANTITIES DELTA UNIT COST CO 14 AMOUNT 110-2001 0 CY 796 CY 796 $ 3.85 $ 3,064.60 132-2003 0 CY 2861 CY 340 $ 5.33 $ 15,249.13 247-2044 0 CY 1017 CY 1017 $ 17.13 $ 17,421.21 260-2027 0 SY 2033 SY 2033 $ 1.14 $ 2,317.62 310-2055 0 GAL 571 GAL 571 $ 3.14 $ 1,792.94 341-2011 0 TON 458 TON 458 $ 43.68 $ 20,005.44 341-2034 0 TON 305 TON 305 $ 45.78 $ 13,962.90 341-2047 0 TON 402 TON 402 $ 50.51 $ 20,305.02 Total $ 94,118.86 Summary of Quantity and Cost Changes - CoRR CR 112 East ITEM ORIGINAL PROJECT QUANTITIES CHANGE ORDER QUANTITIES DELTA UNIT COST CO 14 AMOUNT 110-2001 0 CY 3278 CY 3278 $ 3.85 $ 12,620.30 132-2003 0 CY 167 CY 167 $ 5.33 $ 890.11 247-2044 0 CY 85 CY 85 $ 17.13 $ 1,456.05 260-2027 0 SY 165 SY 165 $ 1.14 $ 188.10 310-2055 0 GAL 35 GAL 35 $ 3.14 $ 109.90 341-2011 0 TON 35 TON 35 $ 43.68 $ 1,528.80 341-2034 0 TON 25 TON 25 $ 45.78 $ 1,144.50 341-2047 0 TON 25 TON 25 $ 50.51 $ 1,262.75 Total $ 19,200.51 Grand Total - CoRR $ 113,319.37 EXECUTED DOCUMENT FOLLOWS TEXAS DEPARTMENT OF TRANSPORTATION CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 014 Third Party Funding Notification Sheet This form is used when the subject change order involves funding by a source other than TxDOT/U.S. DOT, and involves third parties who are providing funding under an Advance Funding Agreement or Donation Agreement. 1. Outside funding provided by: City of Round Rock (Outside Entity's Legal Name) 2. Type of outside funding agreement for this change: r Existing r Amended [ Check one ) r New 3. Indicate the type and amount of funding: r Fixed Price (Lump Sum) (Estimated Amount $113,31937 IR Actual Cost (a) Contract Items (Bid Items): $113,319.37 (b) E&C*: (a) x 0 0 enter % (c) Indirect Cost**: (a + b) x 0 = 0 enter% TOTAL t313/1. 37 CCSJ: 2211-02-021 Project: STP 2009(866)ES Highway: FM 1460 County: Williamson District: Austin Contract 08093008 Number: Use as needed: I hereby acknowledge notification of the modifications covered by this Change Order. Date 24.11 By //el. Typed/Printed Name 414 M t 1'Zj)j% Typed/Printed Title *The percentage (%) for E&C (Engineering and Contingencies) charges varies from project to project depending on the contract amount of the project. Projects with a higher contract amount will have a lower rate of E&C charge. For a specific project, E&C rate (%) can be derived from the cost of "Engineering and Contingencies" in the "Estimated Cost" of the project. ** Use the statewide district rate as established by Finance Division each year. This line 3(c) is for Service Project only, unless otherwise specified in the Advance Funding Agreement. See Stand Alone Manual Notice 98-2 for instructions. Funding for this Change Order has been arranged: TxDOT Representative Typed/Printed Name: Date TXDOT Form 2146-AFA (Rev. 7/2007) Page 1 of 1 2,11- Dk-'2 - � 2, Contact/Help; Print Form:? HUGGINS/SEILER & ASSOCIATES, LP Comulting EI ineers Contract ID: 2211-02-021 (FM 1460) Project No.: STP 2009(866) ES Change Order No. 14 Summary of Quantity and Cost Changes - CoRR University Blvd. East ITEM ORIGINAL PROJECT QUANTITIES CHANGE ORDER QUANTITIES DELTA UNIT COST CO 14 AMOUNT 110-2001 0 CY 796 CY 796 $ 3.85 $ 3,064.60 132-2003 0 CY 2861 CY 340 $ 5.33 $ 15,249.13 247-2044 0 CY 1017 CY 1017 $ 17.13 $ 17,421.21 260-2027 0 SY 2033 SY 2033 $ 1.14 $ 2,317.62 310-2055 0 GAL 571 GAL 571 $ 3.14 $ 1,792.94 341-2011 0 TON 458 TON 458 $ 43.68 $ 20,005.44 341-2034 0 TON 305 TON 305 $ 45.78 $ 13,962.90 341-2047 0 TON 402 TON 402 $ 50.51 $ 20,305.02 Total $ 94,118.86 Summary of Quantity and Cost Changes - CoRR CR 112 East ITEM ORIGINAL PROJECT QUANTITIES CHANGE ORDER QUANTITIES DELTA UNIT COST CO 14 AMOUNT 110-2001 0 CY 3278 CY 3278 $ 3.85 $ 12,620.30 132-2003 0 CY 167 CY 167 $ 5.33 $ 890.11 247-2044 0 CY 85 CY 85 $ 17.13 $ 1,456.05 260-2027 0 SY 165 SY 165 $ 1.14 $ 188.10 310-2055 0 GAL 35 GAL 35 $ 3.14 $ 109.90 341-2011 0 TON 35 TON 35 $ 43.68 $ 1,528.80 341-2034 0 TON 25 TON 25 $ 45.78 $ 1,144.50 341-2047 0 TON 25 TON 25 $ 50.51 $ 1,262.75 Total $ 19,200.51 Grand Total - CoRR $ 113,319.37