R-11-03-10-10C5 - 3/10/2011RESOLUTION NO. R-11-03-10-1005
WHEREAS, the Round Rock Transportation System Development Corporation ("RRTSDC")
has previously adopted a Transportation Capital Improvement Plan ("Plan"), and
WHEREAS, the RRTSDC wishes to amend said Plan, and
WHEREAS, the bylaws of the RRTSDC require that said amendments to the Plan be approved
by the City Council, and
WHEREAS, the City Council wishes to approve said amendments to the Plan, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the amendment to the Transportation Capital Improvement Plan approved by the Round
Rock Transportation System Development Corporation, which is attached hereto as Exhibit "A", is
hereby approved.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 10th day of March, 2011.
ALAN MCGRAW, Mayor
City of Round Rock, Texas
ATTEST:
SARA L. WHITE, City Secretary
O:\wdox\SCClnts\O 1 12\1104\MUNICIPAL \00215741 .DOC/rmc
Addhlonat
Corporation FumRng
This Amendment 126
\
#
[
)
.
\
§
a
/
\
\ }
'
i
,§
)
»� <
§
_
§
;§k$
\k\
\
§
7
4
j
§
\
§
2
#
49
§
\
#
\
§
49
4
}
#
/
k
Other Pundthg
.C1190,
##;
j_5
CO
§
\
9
-
2
/ Z
1\
�
$
$
&
\
f
#
a
#
:
§
;
$1,427,000
\
k
2&
§
\
§
-
)
\
;
#
i
#
;
#
k
.
{
».
'
-
)
!
Winter 2010
Winter 2006
en
§
: }
{
{
Spring 2009
(
2
Spring 2012
Spring 2012
TBD
Spring 2010
!
{
!
;
k
,
>
y
\lam \
�.
£
D
Preliminary engineering to establish alignment
and ROW requirements. P.S.B E. Construction of
Railroad overpass. Protective ROW purchase
Design, purchase right-ol-way and construct 4-
ane divided arterial
Design. purchase right-ot-way and construct 4- '
lane divided arterial
Acquire ROW for highway relocation and relocate
City utilities. Preliminary engineering and final
P.S.BE. Construction of MAD 4.
Construct railroad grade separation
Design and construct trailic signals
Miscellaneous consulting work in support oI
transportation programs and planning
Construct half of a 4 -lane divided roadway
Design and construct MAD 4
Design intersection improvements including turns
lanes, signal improvements and pedestrian
accomodations __..
!Design MAD 4
-}
}®
:�\
I luuign and con trucl Malin Sired to match new
consiruction in SWUI. h¢lutkx slums vacr tnt Blair
Street th,m Main Street In Florence Sims
Design the realignment of RR Avenue onto Libeny
Avenue. includes the design of a signal at the
Liberty/Mays intersection and the design of Main
Street between Blair and Mays Streets
_
/_
(\
/
t
j
\
)
e§
,.
D ?\
§
\ \
\/}k
From Joe DrMaggio Boulevard to 1000 leet south of
US 79
From Old Settlers Boulevard to approximately
Jetterey Way
From FM 1460 to CR 122
900' North of US79 to Old Settler's Blvd.
At Union Pacific Railroad
Various locations
7
]
.
§
ƒ
_
)
\
cc
0
|
P.
k
Tae
-m
\
E
3
Main Street eldension, IH 35 to San Saba
Main Street, San Saba to Blair Street with storm
sewer on Blair Street
Main Street. Blair to Mays Street and Liberty
Avenue, Irom Round Rock Avenue to Mays Street.
1900 feet nosh of Wolle Lane to Wolle Lane
Various locations
UPRR. between CR 172 and St. Williams
Kenney Fon Boulevard (Arterial A)
(North Mays Extension
Old Settler's Blvd./Klphen Road (CR 113)
)
}
IRM 620
}
Transportation Consulting
Wyoming Springs Drive
)
South Mays at Gattis School Road
FM 3406
Main Street Project 1
Main Street Project 2, 3 and 7
Round Rock Avenue/Liberty Avenue realignment
Chisholm Trail 3
2011 Major Maintenance Program
Railroad Quiet Zones
1!
z
0
1-
cc0
a.
cc
cc
0 U
O f.
¢z
aW
I-0
is
Z
W °
00
2
a
0)
J N
4 ''
ct.H�
Z
O
U Q
Z F
O Cc
CCz
z Y
CL CC
Q U
I—
CC
O
Hcc
0
z
cc
O
i
12
F
K
10/l'SOLS-
4...;
p
04
S
U p
g
de.
O
,�aj^
a
a
a
3<
W
3&
H Wa
s `'''
a
3, t3
s a
R
N
`m°
a
3,
N
3
a
3
E,,<
a
N
tl
�
a
3
N
1 3
t
t3f 83
N O
3'
•-
CI
t�3
W
a
3
a
0
9
2§
$
{iy3
a::a
,
a d
a0d.0v
3-c,';',
(5 0
$
m
e
d
§ §
$215,200,000 a
$26,000,000 0
(est)
CO
§
A
1
i
S
Q
o
''
.
§
E
a
C.
w
E
e
,
3
s
«,
8
M
w
U,
E
8
EE
3
8
E
8
E
8
a
3
E
3
E
8
Spring 2007
E
8
0
E
8
o
(
Reprioritized
.a
Reprioritized
a
Reprioritized
�:
I
Construct 4 lane divided arterial
Construct frontage road turnarounds
Alternatives to alleviate congestion
B
a
Construct 4 -lane divided roadway
8
ss a
g
i
Assist City in interagency coordination for SH 45
B
o
d
_
PS8 E Design services; Construct 5 -lane section,
Bridge. Railroad crossing
Realign streets, widen streets. extend streets
g
E
m
=d
Reconstruct highway t0 4 lane divided highway
3
p
a
Construct 4 -lane divided highway
Relocate ramps, widen frontage road. and
construct frontage road turnaround
Construct Frontage road collector -distributor and
replace Hester's Crossing Bridge
Design intersection improvements including dual
left Sons tor all approaches, signal improvements
and pedestrian accomodations
Design MAD 4
!Design MAD 4
°a
P
Design MAD 4
Design MAD 4
Design MAD 4
Conduct preliminary engineering, develop right of
way map and acquire ROW for Arterial C at the
intersection of RM 620 and Deepwood Drive
0
c.w
<
COMPLETED PROJECTS
Forest Creek From Double Creek Dnve to 800' West of Forest
Ridge Subdivision
From Gattis School Rd to MKT ROW
(From US 79 to Lours Henna Blvd
From Louis Henna Blvd to IH 35 Frontage Road
FM 1325/Louts Henna/Hester's Crossing
14.358 RM 620 and IH 358 US 79
¢
O
H
E
From IH -35 to Oakmont Drive
From University Blvd to CR 112
v
3
a
b
o
From CR 123 to US 79
South Mays Street, Dell Way, Gattis School Road
Extension 8 Dellway/Boardwalk Connection
FM 1325/Louis Henna McNeil/1H 35/RM 620 US 79
o
3
o
Round Rock East City Limits to Round Rock West
City Limits
g€
p
E
horn Westinghouse Road to FM 1431
IH 35 @ Hester's Crossing
8
D
University Boulevard to Chandler Creek tributary
Chandler Creek tributary to Cypress Cove (includes
bridge)
From Arterial M to the north I4-35 frontage road
Cypress Cove extension to Paloma
Cypress Boulevard to Arterial M
From Louis Henna to the southern ETJ
From RM 620 to Sam Bass Rd
Double Creek Drive
AW Grimes Blvd (Arterial B)
Greenlawn Extension
?
c
N
2
Oakmont Drive (Arterial 'S')
Teravista
!Prime Strategies
Red Bud Lane (CR 122, Phases 1 8 2)
Red Bud Lane (CR 122. Phase 3)
South Mays Street Improvements
Traffic Signal Coordination
IH 35 Area Improvements
111135 Frontage Rd C -D and Hester's Crossing
Bridge Replacement
Arterial M (M-5)
Arlerial M (M-4)
N
Arterial M (M-3)
Cypress Cove Extension
S
E
U
ROUND ROCK, TEXAS
PI IRPOSF. PASSION. PROSPERITI.
Agenda Item No. 1005.
City Council Agenda Summary Sheet
Agenda Caption:
Consider a resolution approving the action of the Round Rock Transportation System
Development Corporation in amending the Transportation Capital Improvement Program
(TCIP).
Meeting Date: March 10, 2011
Department: Infrastructure Development and Construction Management
Staff Person making presentation: Tom Word, P.E.
Chief of Public Works Operations
Item Summary:
Public testimony is required prior to considering the following amendments to the TCIP:
A. Provide funding in the amount of $500,000 to design and construct traffic signals at various locations
throughout the City.
B. Provide funding for the South Mays at Gattis School Road intersection design project in the amount of
$27,628 for additional costs related to the design, public involvement and environmental analysis.
C. Provide funding for the design and construction of Chisholm Trail Phase 3 in the amount of $3,300,000.
The project limits are from approximately 1,900 feet north of Wolle Lane to Wolle Lane. This project will
provide access to the future Sports Complex and it will include a public road to access the facility from
FM 3406.
D. Provide funding for the 2011 Major Maintenance Program in the amount of $1,500,000. This project
will provide for major maintenance expenses related to arterial roadways.
E. Provide funding in the amount of $13,567 for the Union Pacific Railroad Quiet Zone between CR 172 and
St. Williams Drive. These funds will be used to supplement $452,270 in federal funding secured by
Congressman John Carter for this project.
F. Reduce funding for various completed or reprioritized projects in the TCIP in the amount of
-$12,894,756. Some of the reductions include:
1. A.W. Grimes (FM 1460) - $2,564,935
2. Hester's Crossing Improvements - $1,708,706
3. Red Bud Lane Phase 4 - $1,323,000
4. Arterial M - $1,279,294
This amendment will result in a net reduction to the TCIP budget of -$7,553,561
ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY
Council Agenda Summate Sheet
Strategic Plan Relevance:
21.0 - Identify and plan for future connectivity and mobility needs and options.
25.0 - Develop funding source mechanisms for mobility and connectivity options.
26.0 - Construct major elements of the transportation and mobility system as approved by Council in the Master
Transportation Plan.
The TCIP is the funding mechanism which ensures that the transportation elements of the Strategic Plan
(Transportation Master Plan, future connectivity needs, funding mechanisms, etc.) reach implementation.
Cost: -$7,553,561
Source of Funds: Round Rock Transportation System Development Corporation
Date of Public Hearing (if required): March 10, 2011 at the Transportation System Development Corporation
Recommended Action: Approval