Loading...
R-11-04-14-10C2 - 4/14/2011RESOLUTION NO. R -11-04-14-10C2 WHEREAS, the City of Round Rock has duly advertised for bids for the City Hall Plaza Improvements Project, and WHEREAS, Westar Construction has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Westar Construction, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Westar Construction for the City Hall Plaza Improvements Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of April, 2011. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary O:\wdox\SCClnts\0112\ 1104\MUNICIPAL\00218955. DOC/ttnc ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY City Council Agenda Summary Sheet Agenda Item No. 10C2. Consider a resolution authorizing the Mayor to execute a contract with Westar Agenda Caption: Construction for the City Hall Plaza Improvements Project. Meeting Date: April 14, 2011 Department: Parks and Recreation Staff Person making presentation: Rick Atkins Parks and Recreation Director Item Summary: This item will allow the City to work with Westar Construction on the development of the City Hall Plaza. The project will include decorative concrete plaza, interactive fountain, seatwalls, art screens, landscape, irrigation, and electrical improvements. If approved, Westar would start construction at the end of April/beginning of May and per the contract be substantially complete by the end of July. The contract does not include the shade structure over the plaza or the kugal ball (water feature) in the center walkway area. These items were bid as add/alternates and are outside of the project budget. The cost of the shade structure came in at $35,750 and staff recommends the shade structure be added into the contract as this was an amenity that was heavily requested during the public input process. Additionally, the shade structure would be extremely difficult to add into the plaza at a later date. The cost of the kugal ball (water feature) in the center walkway area came in at $325,000 and staff does not recommend this amenity be added into the contract since it can easily be added at a later date. Westar Construction has constructed numerous projects for the City of Round Rock and staff feels comfortable that Westar could deliver a quality project. Strategic Plan Relevance: The City Hall Plaza Improvements Project directly relates to all of the priority and endorsed goals of the Recreation, Arts and Culture Initiatives (Goals 33-37) in the Places and Spaces section of the Strategic Plan. Cost: $ 396,521.50 Source of Funds: 2007 General Obligation Bonds Date of Public Hearing (if required): N/A Recommended Action: Approval 0 0 0 0 to 3 070 0 3 iU CO (D 0 --.. TOTAL BID (BASE AND ADD/ALT):` mormemetwantene A.4 D W D N 1-, W 1-, 1.30 I-, IV IO I-, N 00 N N V FS IV 01 I-, N VI 1." N A FA N W Fs N N F, N F , 1.20 F+ N IO F, I-, 00 N I-+ V F, I-, 01 F, I-+ in ( F+ I--+ A F, I-, W I-, I-, N F, I-, I- FA I-, O F, lO Fs CO Fs N V F, Cr' F, (n F, LAI Fs F, N 1 ITEM # Piers - Cable Shade Structure Pier Caps Kugal Ball Fountain - hardscape/ compass feature Sod/Turf Landscaping Irrigation Mechanical Room Electrical Electrical Site Power Port Wall Washers - 2' length Wall Washers - 4' length Fountain - Install Pumps, Equipment, & Hardscape (plumb for kugal) 1Green Screen Panels (3 wall panels) Piers Green Screen Green Screen Panels (7 fee standing panels) Projector Anchors 1Christmas Tree Sleeve Rock Aggregate 6" 1Stone Seating Wall (28" at berms w/ veneer on one side) Stone Seating Wall (20" entry plaza w/ veneer on both sides) Concrete Retainer Curb Stage Area (concrete, handrails, stone veneer, backfill, structural) Colored Concrete Paving (Type II w/ sandblast) Colored Concrete Paving (Type II) Colored Concrete Paving (Type I) 1Sitework Conduit for Audio/Visual Storm Sewer Improvements Water Line Improvements Sanitary Line Improvements Construction Entrance 1Erosion/Sedimentation Controls K 0 0• a 0 ITEM DESCRIPTION m r > -n r- N to 11 G r to l- N r to m D m D m D m D m D 1- -11 m D m D m D In T r T r T m t" 1 D-< Vl T v) T Vl T r In m D r r r VI N N r In G+ r z Westar Construction I Fazzone Construction NJ N U1 O0I in. IA V1 (n N O U1 O O O O n 01 (n N 0 (I O O O O 0 0 11 $ 325,000.00 325,000.001 W 00 00 CO V1 0 U1 0 F, V1 I-, N V1 0 0 0 I-, if1 NJ U1 0 0 0 0 N V1 t0 U1 0 0 0 0 i-, V1 00 0 0 0 0 0 N IA W 0 0 0 0 0 A V1 F, 0 0 0 0 0 101 $ 1,900.00 1 F, V1 F, -! 0 0 0 0 0 W V1 F, l0 0 0 0 0 VI 0 V1 N 0 0 0 V V1 N V 0 0 0 0 W V1 F+ O 0 0 0 0 N •(A F, In 0 0 0 0 1471 $ 4.00 ID t0 V1 A 0 0 O 01 W V1 A 0 0 O 216 $ 13.00 1 $ 60,000.00 6371 $ 9.50 1,8851 $ 7.50 3,2351 $ 7.50 300 $ 10.00 1 $ 3,700.00 1 $ 1,200.00 1 $ 6,000.00 1 $ 2,600.00 11 $ 1,000.00 F• IA N p� 0 0 O O 1., V1 V 0 O O O QUAN I UNIT PRICE V w u1 01 V 0NJ N V V $J1 N 0 0 0 1-> t0 A A O O F, N to O O O 12,500.00 9,500.00 00 O 0 0 O O 3,000.00 4,000 00 l0 O 0 0 b O 00'000'LLi U7 V 0 O b 0 1-, O 0 O b 0 00 t0 0 O b 0 3,000. F' in 0 0 O O 588.001 3,960.00 N U1 N O O O O N O 00 0 0 O CO O O O O 01 O to 1, in O 14,137.50 24,262.50 W W V O 0 0 0 0 0 0 O O N 01 I--1 01 O N 0 0 0 0 0 0 0 0 0 O O O 1-, O 0 0 0 OIO 1,000.001 $ 867.84 V A 0 0 0 0 V1 NJ 01 00 N 01 t0 V COST I UNIT PRICE N N W p N 586.38 VV,J,.°,01,rri571 V1 U1 00 01 A I ° IA 0) V l0 O1 U1 01 tD 01 V t0 al In t�D $ 40,592.48 40,592.48 V1 O 01 U1 in V1 IA N N N W I-, V A t0 to t0 01 U1 1.0 N t0 O1 O 01 1-, V 00 {A A 01 00 I-, 01 N V $ 1,806.04 $ 187.64 IA F, 00 t0 ll) 00 01 $ 2,638.69 $ 238,406.47 In. 00 N O 1.0 $ 2,521.42 I$ _ 263.87 V1 01 N 01 O1 IO $ 2.35 1 $ 82.47 {A 00 N O tO $ 13.24 $ 35,268.77 $ 8.08 — V1 01 t0 0 V1 01 t0 0 V1 V1 00 l0 V F, I, O in O 01 t0 V1 V1 V1 A N W ID V N 01 U1 NJ O t0 to V Fa O A W V IA 01 O CO N V I, at 00 :p W , ,A07 V NV tri Lii Vi IV 01 tJi N 187.64 46,816.27 27,559.68 11,962.07 23,499.61 3 ( iA N U1 O 0 O V1 V O 0 O g N F, 00 O O 0 O l0 I-� C1 F, a 01 C1 .. to 1-+ F, 01 W 01 01 00 m V h: 1 }� co tO I- In A N W 01 V N 0 t0 01 V N O 5,082.71 867.84 N 01 00 01 W COST N A O O 0 0 V1 N O 0 0 IA N to O O O 0 0 V1 �l O O O 0 0 V O 0 0 O O V1 1, 0 O V1 1./1 V1 V1 V1 V1 O F, O A y,F, O O O O O (n O O O O O O 00 0000000 0 0 0 0 0 0 O O O O O O V1 - V1 O 0 O V1 N Ian O O 0 O V1 F, U1 O O 0 O V1 N in O O 0 O {A N O 0 O V1 N U1 b O 1 $ 400.00 V1 V1 0 O 0 F+ 0000000000 0 0 0 0 iA N 0 0 1f 1-, 0 0 V1 - 0 0 -CA in NJ O O F+ 0 0 0 0 iA V1 411 '• W VI A O In 00 O O O 0 0 0 0 0 0 1 $ 900.00 V1 F, N O O O O iA 000 b O O O O IUNIT PRICE 1 Patin Construction t0 A N W W 0 4,000.00 331 000.00 0' O 0 0 O O 285,000.001 01 0 N W W 0 0 3,888.001 6,000.00 15,000.00 64,000.00 50,000.00 11,000.00 20,000.00 1111 O 0 0 0 O 7, 500.00 185,000.00 3,500.00 1 N 01 0 O 0 0 U1 0 O 0 0 N in 0 O 0 0 N to A O 0 0 N A V V1 0 0 00'00Z'SZ O N b 1-, 0 O1 O O bb O O 6,370.001 0S0 00 U1 O bb O N w In O O 3,000.00 12,000.00 4,800.00 5,500.00 3.000.00 t0 0 0 0 0 I-, N 0 0 0 0 0A0 O 0 0 0 0 COST 1SO3 NOI1f Da1SNOD NOI.Lvlflavi am CITY OF ROUND ROCK - PARKS & RECREATION DEPARTMENT :NOIjyDO, SVX31'NDOa ONfOd O m CITY HALL PLAZA IMPROVEMENTS PROJECT co 0 D 0o C 0 z 0 30 m m