Loading...
Contract - HDR Engineering, Inc. - 1/11/2018 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR ENGINEERING, INC. ("Engineer") ADDRESS: 810 Hesters Crossing, Suite 120,Round Rock,TX 78681 PROJECT: US 79 at Telander Drive Operational Improvements This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 26th day of May, 2016 for the US 79 at Telander Drive Operational Improvements Project in the amount of$465,972.95; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on September 14, 2017 to amend the scope of services and to increase the compensation by$423,610.38 to a total of$889,583.33; WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$93,220.00 to a total of$982,803.33; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. II. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C,Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Supplemental Contract Rev.06/16 0199.1619;00390651 84275 T--"l00 -6(0 D 1 III. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $93,220.00 the lump sum amount payable under the Contract for a total of $982,803.33, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199.1619;00390651 84275 2 HDR ENGINEERING,INC. B . Date Supplemental Contract Rev.06/16 0199.1619;00390651 84275 3 CITY OF ROUND ROCK AP R VE D AS FORM: By: / A 4 Crag orga , ayor Step n L. Sheets,City Attorney Date Supplemental Contract Rev.06/16 0199.1619;00390651 84275 4 ADDENDUM TO EXHIBIT A City Services The CITY will provide the following: a. City of Round Rock design criteria, standard details and standard specifications. b. Record drawings of the existing potable and reclaimed water pipelines. c. Submission of permit applications to TXDOT and Union Pacific Railroad, and payment of any applicable fees. d. Prompt review and comments on submittals. e. Coordinate approvals for geotechnical boring. ADDENDUM TO EXHIBIT B Engineering Services The work to be performed by HDR Engineering, Inc. (ENGINEER) for this work shall consist of providing additional engineering services for water line and reclaimed water line design to be included in the Plan, Specifications, and Estimate (PS&E) package for construction of an at-grade crossing of the Union Pacific Railroad (UPRR) at the Brushy Creek Plant entrance, including related intersection improvements on US 79. HDR will prepare drawings and specifications for the installation of approximately 350 linear feet of 16-inch water line and 12-inch reclaimed water line across Highway 79 and the Union Pacific Railroad at Harrell Parkway. All references to Telander Rd. in the original scope of services shall be Harrell Parkway. The detailed scope of services for this work is further described below. I. Water& Waste Water Utilities Design a. HDR will attend a project kick-off meeting to establish the scope of the project, including the proposed alignment for the new pipelines, connection points to the existing potable water and reclaimed water pipelines, and any applicable design standards, including standard details and/or specifications. One (1) meeting is assumed for budget purposes. b. Conduct a site visit after the kick-off meeting to confirm project extents. One (1) field visit is assumed. c. HDR will prepare final drawings and specifications indicating the scope, extent, and character of the work to be performed and furnished by a Contractor. Drawings • Drawings shall be formatted to print on 11 x 17 paper, at a horizontal scale of 1 inch equals 100 feet and a vertical scale of 1 inch equals 10 feet. • Only plan and profile sheets and standard detail sheets will be prepared, for inclusion with the roadway drawings. No additional cover sheet, standard notes, or traffic control sheets will be developed. • The following sheets will be part of the deliverable: 1. General Notes for Water and Wastewater Lines (1) 2. Plan and Profile Drawing — Potable Water(1) 3. Plan and Profile Drawing — Reclaimed Water(1) 4. Connection Details (2) 5. Standard Details (1) 6. Material quantities for inclusion on a roadway quantities sheet. Page 1 of 3 Specifications • Only technical specifications related to the pipeline relocation will be prepared, for inclusion with the roadway relocation specifications. d. HDR will furnish the bidding documents for review by the City, conduct a review meeting with the City, and revise the bidding documents to address the City's comments, as appropriate. e. HDR will provide technical criteria, written descriptions, and design data as necessary for the City's use in filing applications for permits from or approvals of TXDOT and Union Pacific Railroad. HDR will assist the City in consultations with such authorities; and revise the drawings and specifications in response to directives from such authorities. f. HDR will prepare an opinion of probable construction cost based on recent bid tabulations for similar work available to HDR and/or provided by the City. g. Modify roadway design plans to include the change in access for the Water Treatment Plant. h. Update drainage analysis and drainage plans to address the change in access for the Water Treatment Plant. I. Additional boring to verify conflicts for proposed water lines. j. Design security gate and camera system for the new access to the water treatment plant facility. k. Modification and additional traffic control plan sheets to accommodate the design changes. II. Illumination Design Provide engineering services for the removal and relocation of existing continuous illumination assemblies, upgrading the relocated illumination assemblies lamp types from HPS to LED, providing new underground infrastructure for the relocated illumination assemblies, providing new continuous illumination assemblies, providing new electrical service for the new continuous illumination assemblies, and providing new underground infrastructure for the new continuous illumination assemblies for the intersection improvements along US79. a. Contact the utility company for existing available voltage and connected loads of existing electrical services. Coordinate available voltage, location and connected loads of new electrical service. b. Conduct photometric analysis (project limits) for compliance with the required foot candle levels for continuous illumination. The photometric analysis will be utilized to determine the illumination assembly light distribution type only. Mounting height and spacing will be per existing illumination assemblies being relocated. c. Conduct voltage drop calculations for conductor and conduit sizes. Page 2 of 3 d. Conduct overcurrent protection and load analysis for circuits and electrical service sizes. e. Design continuous illumination utilizing TxDOT Roadway/Illumination Standards. f. Prepare illumination Layouts, Details, and Standards for inclusion in the plan set. III. Utility Coordination a. Pothole (4 locations) to identify depth of gas lines. This work will be performed by a sub consultant. b. Analyze potential utility conflicts based on survey and utility records with respect to engineering plans to determine if the conflict is clear, confirmed, or requires additional Subsurface Utility Investigations. c. Coordinate with SUE provider for SUE Quality Level A and B deliverables. Analyze the SUE deliverables for final conflict determination and resolution. d. Conduct individual meetings with utility companies to further coordinate utility conflicts and determine conflict resolutions to prevent project delays. Attend additional City utility coordination meetings for continued utility conflict resolution. IV. Project Management a. Project coordination, correspondence, and meetings. b. Prepare sub consultant agreements. c. Assist City during advertising of the project for bidding. SERVICES NOT INCLUDED a. It is assumed that sufficient topographic survey, subsurface utility engineering and geotechnical boring data has been collected for the pipeline design. b. No modeling and/or sizing of utilities will be performed for existing or future capacity analysis. c. No pipe material analysis will be performed. d. No easements will be prepared or acquired. e. HDR is not responsible for providing engineering technical review of utility relocation design plans for UAR compliance in State ROW, and confirmation of conflict resolutions. HDR is not required to coordinate and track the utility company relocations and schedules. Such work includes but is not limited to contacting utility companies for progress on design plan completions, work order submittals, material procurement, contractor attainment, relocation completions, abandonment and/or removal completions. HDR is not required to coordinate and respond to utility companies and contractor Requests For Information relating to utility construction and design changes. Page 3 of 3 ADDENDUM TO EXHIBIT C Work Schedule PS&E plans 100% - March 15, 2018 Bid Services — May, 2018 Construction Services— May 2018 to December 2019 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page Exhibit D Project US 79 at Telander Drive Operational Improvements Name: Consultant: HDR Engineering,Inc. Cost Component,Hours Total Hours Project Principal 0 Project Manager 50 Senior Engineer. 26 Design Engineer 136 Engineer-in-Training 298 Sr.Design Technician 0 CADD Technician 48 Clerical/Steno 18 Total Hours 576 Cost Component,Dollars Billing Totals Rate Project Principal $280 $0.00 Project Manager $256 $12,800.00 Senior Engineer $215 $5,590.00 Design Engineer $155 $21,080.00 Engineer-in-Training $110 $32,780.00 Sr.Design Technician $120 $0.00 CADD Technician $98 $4,704.00 Clerical/Steno $62 $1,116.00 Labor Dollars $78,070.00 Cost Component,Direct Expenses Total Travel Expenses(Mileage billed at IRS Standard Rate) $100 Printing $100 TOTAL DIRECT EXPENSES $200.00 PROJECT FEE SUMMARY Total HDR Costs $78,070.00 HDR Direct Expenses $200.00 Subconsultants: RTG Traffic Control Plans $5,000.00 Raba Kistner Pavement Testing&Design $350.00 Rios Utility Potholes $9,600.00 TOTAL FEE $93,220.00 Page 1 of 1 Project Name: US 79 at Telander Drive Operational Improvements HDR Engineering, Inc. Total Total Other TOTALS Task Labor Hours Loaded Labor Cost Direct Costs Subconsultants TASK I Water&Wastewater Utilities Design 288 $41,738.00 $0.00 $5,350.00 $47,088.00 TASK 11 Illumination Design 182 $21,818.00 $0.00 $0.00 $21,818.00 TASK III Utility Pot Holes 72 $9,180.00 $0.00 $9,600.00 $18,780.00 TASK IV Project Management 34 $5,334.00 $200.00 $0.00 $5,534.00 GRAND TOTAL: 576 $78,070.00 $200.00 $14,950.00 $93,220.00 Page 1 of 1 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-285870 HDR Engineering,Inc. Austin,TX United States Date Filed: 2 Name of governmental entity or state agency that G a party to the contract for which the form is 11/20/2017 being filed. City of Round Rock Date Acknowledged: g Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. US79@Telander Dr Improvements Professional Engineering Services 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary HDR, Inc. Omaha,NE United States X Little, George A. Omaha,NE United States X Keen,Eric L. Omaha,NE United States X Felker,Brent R. Davis,CA United States X O'Reilly,Charles L. Boston, MA United States X 5 Check only if there is44014 gd Party. fl S ✓ 6 AFFIDAVIT °'tt' Y pt'9�.`°s I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. r OF tti 0 "7rnExp CK�b`�ti`` Si,' of aut sized . nt contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said this the day of 20 l _,to certify which,witness my hand and seal of Dhice. M10 13 to�L- t &te�'c�rrro�6�.1 -Flu lel A Ve Sign ture of officer administering oath Printed ame of officer administering oath Title of officer administerin oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.3337 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-285870 HDR Engineering, Inc. Austin,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 11/20/2017 being filed. City of Round Rock Date Acknowledged: 12/28/2017 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. US79@Telander Dr Improvements Professional Engineering Services Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary HDR, Inc. Omaha, NE United States X Little, George A. Omaha, NE United States X Keen, Eric L. Omaha, NE United States X Felker, Brent R. Davis,CA United States X O'Reilly, Charles L. Boston, MA United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is and my date of birth is My address is , (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in County, State of on the day of 20 (month) (year) Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.3337