Loading...
R-11-05-26-11C5 - 5/26/2011RESOLUTION NO. R-11-05-26-1105 WHEREAS, the City of Round Rock has duly advertised for bids for the Sam Bass Road/Chisholm Trail Modifications and Water -Wastewater Relocation Project, and WHEREAS, RGM Constructors, L.P. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of RGM Constructors, L.P., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with RGM Constructors, L.P. for the Sam Bass Road/Chisholm Trail Modifications and Water - Wastewater Relocation Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of May, 2011. Cp Yn /.___ ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary O:\wdox\SCClnts\0112\ 1104\MUNICIPAL\00222690.DOGrmc ROUND ROCK, TEXAS PURPOSE, PASSION. PROSPERITY. Agenda Item No. Ci Council A:enda Summar Sheet 1105. or to execute a contract with RGM Consider a resolution authorizing the May Constructors, LP for the Sam Bass Road/Chisholm Trail Modifications and Agenda Caption: Water/Wastewater Relocation Project. Meeting Date: May 26, 2011 Department: Infrastructure Development and Construction Management Staff Person making presentation: Michael Thane, P.E. Director of Infrastructure Management Item Summary: cation m The SamRBass Road/Chisholm Trail Modifications and Water-Wastewater includes the reconstruction will ct reconstruct Chisholm Bass Road from the IH 35 frontage road to Meadows Drive. The p 1 with approximately400 feet north of Sam Bass Road to provide for a fully functioning Chisholm from Sam Bass Road to a point replacement/realignment of existing water and wastewater Trail/Sam Bass intersection. These roads will be asphalt -surfaced, curb and gutter roadways, ro ect includes rep concrete driveways and sidewalks. Thep j infrastructure, most of which was constructed forty or more years ago. The project will include new signal ng d to a infrastructure,oss-s storm drainage infrastructure, a water quality facility, an therecontime struction on calendarGli days. The wider cross-section witconcrete o bidding was $4,100,000. ontract completion construction cost estimateprior onant 28, Design Group, has reviewed the bids, bids forth the construction of the project were received and openeddsApril 28, 2011. Upon tabulation of e bids, RGM Constructors. L.P. submitted the lowest bid. The City's con RGM's qualifications and recommends that RGM be awarded the contract. Strategic Plan Relevance: the development of major density centers. 22.0 - Foster transportation systems that would supportroved by Council the Master 26.0 - Construct major element of the transportation and mobility system as app Transportation Plan. Cost: Source of Funds: 2002 General Obligation Bond Date of Public Hearing (if required): N/A Recommended Action: Approval $3,920,141.61