R-11-06-23-10C9 - 6/23/2011RESOLUTION NO. R -11-06-23-10C9 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Page Southerland Page, LLP for the Main Street Infrastructure Improvements Between San Saba Street and Blair Street — Implementation Based on Southwest Downtown Master Plan Project, and WHEREAS, Page Southerland Page, LLP has submitted Supplemental Contract No. 2 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 2 with Page Southerland Page, LLP, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 2 to the Contract with Page Southerland Page, LLP, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of June, 2011. v)-1 ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: '01)1,44A-. t4071M- SARA L. WHITE, City Secretary O:\wdox\SCCInts\0112\ 1104\MUNICIPAL\00224887.DOC/rmc EXHIBIT „A„ STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PAGE SOUTHERLAND PAGE, LLP ("Engineer") ADDRESS: 400 W. Cesar Chavez, Suite 500, Austin, Texas 78701 PROJECT: Main Street Infrastructure Improvements between San Saba Street and Blair Street — Implementation based on Southwest Downtown Master Plan This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Page Southerland Page, LLP hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 27th day of August, 2009 for the Main Street Infrastructure Improvements between San Saba Street and Blair Street — Implementation based on Southwest Downtown Master Plan Project in the amount of $374,699.95; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on November 12, 2010 to amend the scope of services and to increase the compensation by $4,552.86 to a total of $379,252.81; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $49,902.00 to a total of $429,154.81; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set' forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $49,902.00 the lump sum amount payable under the Contract for a total of $429,154.81, as shown by the attached Addendum to Exhibit D. Supplemental Contract Rev.12/01/08 0199.7121; 00224080.doc 84275 STO7DTST 1 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. PAGE SOUTHERLAND PAGE, LLP By: Date Page Southerland Page, LLP. Partner By: PSP Architect �,-�,�Engineers, Inc. Its: . 1 Partoe Its: Principal CITY OF ROUND ROCK APPROVED AS TO FORM: By: Alan McGraw, Mayor Stephan L. Sheets, City Attorney Date Supplemental Contract Rev.I2/01/08 0199.7121; 00224080.doc 84275 STO7DTST 2 ADDENDUM TO EXHIBIT B Engineering Services Scope: Added Scope of Services to the City of Round Rock SWDT Main Street Project (PSP # 109034). The added design scope is for ROW and utilities on Harris Street between Main Street and Liberty Street to include: 1. Full 80' ROW improvement with sidewalk pavers and new street plan and profile to curb returns at least on Harris. PSP will check to see if a fit can be made is to the existing curb return on Liberty on the east side of the street and go to that curb return, if possible. 2. Street Light Poles (and associated electrical) 3. Street Trees and Grates 4. Handicapped Accessibility -Texas Dept. of Licensing and Regulation (TDLR) consultant review fees are by the City 5. 12 -inch water main (full block plan and profile), 6. No WW in this street, 7. Storm drain (half a block plan and profile), 8. E2 duct bank (half block plan and profile), and 9. Runoff collected in Harris Street is accounted for at the Senior Activity Center (SAC) Pond — TCEQ WPAP permit # 03100706, 12/05/2003. The latest TCEQ Water Pollution Abatement Plan (WPAP) modification to the above permit resulted in permit # 05032802C, 06/16/2010 for the Main Street project. It already includes this part of Harris Street. PSP has checked with TCEQ regarding the proposed addition to the existing Main Street project. TCEQ's initial response is that no further permitting is required and the information provided to notify them of the proposed project is sufficient; therefore no TCEQ water quality control permitting services are proposed. Basic Civil Engineering Design Services: The Scope of our Fee Proposal for the Harris Street Addition includes Basic Civil Engineering Design for improvements within the above defined LOC. The proposed preparation of modified and additional construction plan sheets is based on the approved Master Plan documents and includes Basic Civil Engineering Design services as follows: 1. Demolition in the LOC 2. Grading in the LOC 3. Plan and Profile for Harris Street in the LOC. 4. Roadway sections will match those defined by the Approved Civil Masterplan 5. Roadway and Pavement sections will be based on Geotech recommendations provided by the City 6. Analysis and Design of the Stormwater runoff collection and conveyance to an existing Regional Water Quality facility at Baca Center — no new permitting. 7. Plan and Profile drawings for the construction of Water (Fire) Mains 12" diameter and larger in the LOC as defined in the Approved Civil Master Plan. The City of Round Rock has provided pipe sizes based on the City's water distribution model for the district fire water demands. This is based on water service from the City's supply and excludes the design of new water supply facilities. 8. Excludes new wastewater services, mains, disposal systems and lift stations. 9. Plan and Profile Drawings for Dry Utilities Duct Bank in the LOC. 10. Contract Administration for civil engineering services 11. Coordination associated with the City of Round Rock and Texas Commission on Environmental Quality (TCEQ) Edwards Aquifer Protection Program (EAPP) Water Pollution Abatement Plan (WPAP). No new TCEQ permitting. 12. Updates to the Main Street Construction documents 13. Construction Phase Assistance 14. Provide administrative services associated with the above mentioned work 15. Project Close Out Services Not Included: The following services are not included in the scope of the Basic Design Services. It is anticipated these services; are not required, are additional services, or will be provided by others: 1. Zoning and Re -Subdivision. 2. Environmental Assessments. 3. Preparation of easement dedication/vacation exhibits (by Licensed Surveyor) 4. Storm Water Detention Facilities (previously determined to not be required due to proximity to lower Lake Creek). 5. FEMA Flood Plain Analysis / Revisions Geotechnical Analysis/Reports and supplemental information (provided by Owner). 6. Transportation Studies or Traffic Impact Analysis (provided by Owner). 7. Tree, Topographical and Boundary Survey (provided by Owner). 8. Landscape & Irrigation Design/Site Furnishings/Site Lighting/Signage& Graphics. 9. Changes or Additions to the Basic Design Services or Approved Civil Master Plan initiated by the Owner. 10. Changes or Additions to the Basic Design Services or Approved Civil Master Plan resulting from unforeseen field conditions encountered during construction. 11. Permitting associated with the following Jurisdictions: TCEQ, USF&W. 12. TAS/TDLR registration and review (Provided by Owner). 13. Off -Site Roadway Improvements not described above. 14. Off -Site Drainage Studies (areas not located within the Approved Civil Master Plan Area). 15. Design of Retaining Walls (Structural Design required). 16. Pavement section recommendations. (Provided by Owner's Geotechnical consultant). 17. City, State or other Governing Agency Fees. 18. Preparation of Mylar Record Drawings. ADDENDUM TO EXHIBIT C Work Schedule Anticipated schedule when the plans can be issued — approximately 5 weeks. ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page ADDENDUM TO EXHIBIT D City of Round Rock Project Name Sheet 1 of 4 LABOR COSTS BY FUNCTION CODE : P.C. 110 ROUTE AND DESIGN STUDIES F.C. 120 ENVIRONMENTAL STUDIES F.C. 130 RIGHT OF WAY PLANS F.C. 150 FIELD SURVEYS / MAPPING. F.C. 160 ROADWAY DESIGN CONTROLS F.C. 161 DRAINAGE F.C. 162 SIGNING, MARKINGS, AND SIGNALIZATION F.C. 163 MISCELLANEOUS (ROADWAY) F.C. 164 MANAGING CONTRACTED PROF. SERVICES F.C. 165 TRAFFIC MANAGEMENT SYSTEMS F.C. 170 BRIDGE DESIGN F.C. 190 PROJECT MANAGEMENT F.C. 191 SUPPORT SERVICES F.C. 310 CONSTRUCTION PROJECT SUPERVISION P.C. 320 CONSTRUCTION INSPECTION F.C. 330 CONSTRUCTION JOB CONTROL TOTALS DIRECT COSTS: EXPENSES: mise unreimbursed Final Mylar Plots Reproduction Mileage Amine Flights Per Diem Mad & Deliveries rfi sg; 0110 dt UNIT DIRECT LABOR 13,601.00 1,932.00 1,932.00 5 17.466.00 OVERHEAD • 160.00% 20,401.50 2,898.00 2,898.00 26,197.60 LABOR+OVH 34,002.50 4,830.00 4,830.00 FIXED FEE 12.00% 5 $ $ $ $ 4,080.30 $ $ $ $ $ $ 579.60 $ 579.60 $ $ TOTAL COST RATE SUB -CONTRACTS: TOTAL DIRECT COSTS E TOTAL COST $ 1,000.00 $ 49,902.00 COMPANY NAME MANHOUR SUMMARY Sheet 2 of 4 Project Name City of Round Rock FC 110 ROUTE AND DESIGN STUDIES Manhours Rate Direct Labor Project Engineer 0 $42.79 $ Engineer 0 $35.10 $ Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ Sub -total 0 $ FC 120 ENVIRONMENTAL STUDIES Manhours Rate Direct Labor Project Engineer 120 $42.79 $ 5,134.80 Engineer 0 $35.10 $ Senior Civil Designer 309 $27.40 $ 8,466.60 Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ Sub -total 429 $ 13,601.40 FC 130 RIGHT OF WAY PLANS Manhours Rate Direct Labor Project Engineer 0 $42.79 $ Engineer 0 $35.10 $ Senior Civil Designer 0 $27.40 - $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ Sub -total 0 $ FC 150 FIELD SURVEYSIMAPPING Manhours Rate Direct Labor Project Engineer 0 $42.79 $ Engineer 0 $35:10 $ Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ Sub -total 0 $ COMPANY NAME MANHOUR SUMMARY Sheet 3 of 4 Project Name City of Round Rock FC 160 ROADWAY DESIGN CONTROLS Manhours Rate Direct Labor Project Engineer 0 $46.00 $ Engineer 0 $46.00 $ Senior Civil Designer 0 $42.00 $ Civil Designer 0 $42.00 $ Junior Civil Designer 0 $38.00 $ Administrative Assistant 0 $34.00 $ Sub -total 0 $ FC 161 DRAINAGE Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 162 SIGNING, MARKINGS AND SIGNALIZATION Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 163 MISCELLANEOUS (ROADWAY) Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech 111 0 $34.00 $ Sub -total 0 $ FC 170 BRIDGE DESIGN Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer Ill 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ COMPANY NAME MANHOUR SUMMARY Sheet 4 of 4 Project Name City of Round Rock FC 164 MANAGING CONTRACTED PROF. SERVICES Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech 111 0 $34.00 $ Sub -total 0 $ FC 165 TRAFFIC MANAGEMENT SYSTEMS Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech IIl 0 $34.00 $ Sub -total 0 $ FC 190 PROJECT MANAGEMENT Manhours Rate Direct Labor Engineer V 42 $46.00 $ 1,932.00 Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer 1 .0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 42 $ 1,932.00 FC 191 SUPPORT SERVICES Manhours Rate Direct Labor Engineer V 42 $46.00 $ 1,932.00 Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer! 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 42 $ 1,932.00 FC 310 CONSTRUCTION PROJECT SUPERVISION Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer! 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Agenda Item No. 10C9. City Council Agenda Summary Sheet Agenda Caption: Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 2 with Page Southerland Page, LLP for the Main Street Infrastructure Improvements between San Saba and Blair Street — Implementation based on the Southwest Downtown Master Plan Project. Meeting Date: June 23, 2011 Department: Infrastructure Development and Construction Management Staff Person making presentation: Michael Thane, P.E. Director of Infrastructure Management Item Summary: The original Professional Services Contract with Page Southerland Page for the Southwest Downtown District Infrastructure Projects (Main Street) was approved by the City Council on August 27, 2009 for the amount of $374,699.95. The original agreement included Main Street from San Saba Street to Blair Street. The scope of work included all items necessary to successfully design this project, including infrastructure and surface improvements for Main Street between San Saba and Blair Streets as well as infrastructure and surface improvements for Main Street intersections with San Saba, Harris, Brown, and Blair Streets. This also included the design for the Blair Street Storm Sewer. This request for Supplemental Agreement No. 2 with Page Southerland Page is for additional work associated with the Southwest Downtown District Infrastructure Project (Main Street). The scope of work includes improvements to Harris Street between Main Street and Liberty Street. This work includes improvements to the water line, 1/2 Block E2 Duct Bank, storm sewer, ROW and street work in Harris Street. The cost for this Supplemental Agreement is $49,902. Strategic Plan Relevance: 26.0 Construct major elements of the transportation and mobility systems as approved by council in the master transportation plan. Cost: $49,902 Source of Funds: 4B — Round Rock Transportation Development Corporation - Construction Date of Public Hearing (if required): N/A Recommended Action: Approval EXECUTED DOCUMENTS FOLLOW STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PAGE SOUTHERLAND PAGE, LLP ("Engineer") ADDRESS: 400 W. Cesar Chavez, Suite 500, Austin, Texas 78701 PROJECT: Main Street Infrastructure Improvements between San Saba Street and Blair Street — Implementation based on Southwest Downtown Master Plan This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Page Southerland Page, LLP hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 27th day of August, 2009 for the Main Street Infrastructure Improvements between San Saba Street and Blair Street — Implementation based on Southwest Downtown Master Plan Project in the amount of $374,699.95; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on November 12, 2010 to amend the scope of services and to increase the compensation by $4,552.86 to a total of $379,252.81; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $49,902.00 to a total of $429,154.81; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set. forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $49,902.00 the lump sum amount payable under the Contract for a total of $429,154.81, as shown by the attached Addendum to Exhibit D. Supplemental Contract Rev.12/O1/08 0199.7121; 00224080.doc 84275 STO7DTST E —1146- 23— t Oct IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. PAGE SOUTHERLAND PAGE, LLP By: Page Southeriand Page, L.L.P. By: PSP Architect - Engineers, Inc. Its: : = • • Partner Date Its: Principal CITY OF UND ROC APP ' 1 VED AS TO i ORM: By: ' " i &C:11.1. - Alan McGraw, Mayor Stephn L. Sheets, City Attorney C. .11 Date Supplemental Contract Rev.12/01/08 0199.7121; 00224080.doc 84275 STO7DTST 2 ADDENDUM TO EXHIBIT B Engineering Services Scope: Added Scope of Services to the City of Round Rock SWDT Main Street Project (PSP # 109034). The added design scope is for ROW and utilities on Harris Street between Main Street and Liberty Street to include: 1. Full 80' ROW improvement with sidewalk pavers and new street plan and profile to curb returns at least on Harris. PSP will check to see if a fit can be made is to the existing curb return on Liberty on the east side of the street and go to that curb return, if possible. 2. Street Light Poles (and associated electrical) 3. Street Trees and Grates 4. Handicapped Accessibility -Texas Dept. of Licensing and Regulation (TDLR) consultant review fees are by the City 5. 12 -inch water main (full block plan and profile), 6. No WW in this street, 7. Storm drain (half a block plan and profile), 8. E2 duct bank (half block plan and profile), and 9. Runoff collected in Harris Street is accounted for at the Senior Activity Center (SAC) Pond — TCEQ WPAP permit # 03100706, 12/05/2003. The latest TCEQ Water Pollution Abatement Plan (WPAP) modification to the above permit resulted in permit # 05032802C, 06/16/2010 for the Main Street project. It already includes this part of Harris Street. PSP has checked with TCEQ regarding the proposed addition to the existing Main Street project. TCEQ's initial response is that no further permitting is required and the information provided to notify them of the proposed project is sufficient; therefore no TCEQ water quality control permitting services are proposed. Basic Civil Engineering Design Services: The Scope of our Fee Proposal for the Harris Street Addition includes Basic Civil Engineering Design for improvements within the above defined LOC. The proposed preparation of modified and additional construction plan sheets is based on the approved Master Plan documents and includes Basic Civil Engineering Design services as follows: 1. Demolition in the LOC 2. Grading in the LOC 3. Plan and Profile for Harris Street in the LOC. 4. Roadway sections will match those defined by the Approved Civil Masterplan 5. Roadway and Pavement sections will be based on Geotech recommendations provided by the City 6. Analysis and Design of the Stormwater runoff collection and conveyance to an existing Regional Water Quality facility at Baca Center — no new permitting. 7. Plan and Profile drawings for the construction of Water (Fire) Mains 12" diameter and larger in the LOC as defined in the Approved Civil Master Plan. The City of Round Rock has provided pipe sizes based on the City's water distribution model for the district fire water demands. This is based on water service from the City's supply and excludes the design of new water supply facilities. 8. Excludes new wastewater services, mains, disposal systems and lift stations. 9. Plan and Profile Drawings for Dry Utilities Duct Bank in the LOC. 10. Contract Administration for civil engineering services 11. Coordination associated with the City of Round Rock and Texas Commission on Environmental Quality (TCEQ) Edwards Aquifer Protection Program (EAPP) Water Pollution Abatement Plan (WPAP). No new TCEQ permitting. 12. Updates to the Main Street Construction documents 13. Construction Phase Assistance 14. Provide administrative services associated with the above mentioned work 15. Project Close Out Services Not Included: The following services are not included in the scope of the Basic Design Services. It is anticipated these services; are not required, are additional services, or will be provided by others: 1. Zoning and Re -Subdivision. 2. Environmental Assessments. 3. Preparation of easement dedication/vacation exhibits (by Licensed Surveyor) 4. Storm Water Detention Facilities (previously determined to not be required due to proximity to lower Lake Creek). 5. FEMA Flood Plain Analysis / Revisions Geotechnical Analysis/Reports and supplemental information (provided by Owner). 6. Transportation Studies or Traffic Impact Analysis (provided by Owner). 7. Tree, Topographical and Boundary Survey (provided by Owner). 8. Landscape & Irrigation Design/Site Furnishings/Site Lighting/Signage& Graphics. 9. Changes or Additions to the Basic Design Services or Approved Civil Master Plan initiated by the Owner. 10. Changes or Additions to the Basic Design Services or Approved Civil Master Plan resulting from unforeseen field conditions encountered during construction. 11. Permitting associated with the following Jurisdictions: TCEQ, USF&W. 12. TAS/TDLR registration and review (Provided by Owner). 13. Off -Site Roadway Improvements not described above. 14. Off -Site Drainage Studies (areas not located within the Approved Civil Master Plan Area). 15. Design of Retaining Walls (Structural Design required). 16. Pavement section recommendations. (Provided by Owner's Geotechnical consultant). 17. City, State or other Governing Agency Fees. 18. Preparation of Mylar Record Drawings. ADDENDUM TO EXHIBIT C Work Schedule Anticipated schedule when the plans can be issued — approximately 5 weeks. ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page ADDENDUM TO EXHIBIT Cityof Round Rock .. .. ... .....-.>,..,;..v.y.:(:.n?1 . .. .. Project Name Sheet1of4 ..,,_..._..�.,.. r. Y.\ . .:� > 5... ..�^.p .:tn : :.:�._. ...:. �.-•X>... •'a•9 .: �.. a+. �,r#..a1-:.f.'..: ,�•a_.:i,...."Z��Y.:r J.�v.d.:N._�:.f.a.�r!•F:::-�i�!_':>u:av`,->..:..1wA:.,aw,;',,:scTi:..'o.sA • �. �:.__..,:..,.. ..r, _:.;..-= J... {.-: :n4.''°_.::T ..�'�.r• -a=. :•si` r_:L.,.:.t w�:�.•:. .:�_ �•�-� ^.:.. .,.i.,;,...«.*.:c-•-;:.?:e.c!:T.yx:_..:n: �.�.__:. : ...�8�1%�"'�:' :r':n.:i•:.,:a` ta.:-�N^r.�P.Ci:r.>-vs'. .`:x� y., ,-,.{-�i. �r;..-:,. ^' [ �tiF.��.'S�3a}.Zs:+ :;;�i.Y,..,'i:w ,Tr::F.Y.e.a> '`�.-.,ur.�-';_A:'.,",F:�I.--fi?''y:-: r.'a-ir.:�a�^.,.:' -.i�..�iG.'fn�': - ii:M:a. :+:�� �z^s:'� mu...:.�3..'J..t�..r.-,fit : �r'�,,_s.n..'-Trc�.•:"T hc.`:?:.,.s.:a,,�3., .:<�=i�..'..'.C,"r.','•e:.?�:•5_.-,.;a:-:?.�'3:'itin.•s" ;'.� _ .fes - ..•..s%�i="i: .4.. 4a: . :1..4_.4•. _ 4'+, y,`^:'x�5`•y+ny'F ...1:.s.�..>. :, >ra*a�3. �:_..-h. '�c5:=_.''i,:s �;_�,s•4� LABOR COSTS BY FUNCTION CODE : DIRECT LABOR OVERHEAD : `: 160.00'/0 TOTAL : LABOR+OVH I FIXED FEE 12.00% TOTAL COST F.C. 110 F.C. 120 F.C. 130 F.C. 150 F.C. 160 F.C. 161 F.C. 162 F.C. 163 F.C. 164 F.C. 165 F.C. 170 F.C. 190 F.C. 191 F.C. 310 F.C. 320 F.C. 330 ROUTE AND DESIGN STUDIES ENVIRONMENTAL STUDIES RIGHT OF WAY PLANS FIELD SURVEYS / MAPPING. ROADWAY DESIGN CONTROLS DRAINAGE SIGNING, MARKINGS, AND SIGNALIZATION MISCELLANEOUS (ROADWAY) MANAGING CONTRACTED PROF. SERVICES TRAFFIC MANAGEMENT SYSTEMS BRIDGE DESIGN PROJECT MANAGEMENT SUPPORT SERVICES CONSTRUCTION PROJECT SUPERVISION CONSTRUCTION INSPECTION CONSTRUCTION JOB CONTROL TOTALS $ - $ - $ - $ - $ 13,601.00 $ - $ - $ - $ - $ - $ - $ 1,932.00 $ 1,932.00 $ - $ - $ - 5 - $ - $ - $ - $ 20.401.50 S - $ - $ - S - $ - $ - $ 2,898.00 $ 2,898.00 $ - $ - $ - $ - $ - $ - $ - $ 34,002.50 $ - $ - $ - $ - $ - $ - $ 4,830.00 $ 4,830.00 $ - $ - $ - $ - $ - $ - $ - $ 4,080.30 $ $ - $ - $ - $ - S - $ 579.60 $ 579.60 $ - $ - 5 - $ - $ - $ - $ - $ . ' :..38,082.80 S. :.: ': ' :::. - $ $ . .' '.: `. `: - S - $ - $ 5,409.60 $ 5,409.60 $ - $ - $ - $ 48,902.00 $ 17,466.00 $ 26,197.60 $ 43,662.60 $ 6,239.50 7mf tlY * i2' i �. .•�_,: <"--_7.--:,- Tf^, ,.,,,,, k." 1.. %:.( r ? -_ Yi' K '. .,` S-C. 5 --- DIRECT COSTS: •� � ����� ����� - ���� >A��'�. -.��:' •:'Y+'^< ,: ..... � rte• �:.::: -c;-�` .. 'xY ?yK g .a:f,,;v' �_� Y;.• .em.....-. M.;n�>q .x:'�ei:gx.= " :.,3�-s•. w^•„C.. >`� . S . �.�.';:•:h �5.:2Y....._ � G.: ';.his. - - EXPENSES: misc unreimbursed Final Mylar Plots Reproduction Mileage Airline Flights Per Diem Man & Delivenes : _..<..._.-i.<.�..__.. ... k.x._ r.d e , o: Jd�� a f :.> . ..k:.. ".a,.'. �'._.- )A1 � �4:..ss: "�" � "� _ .a,,. .:$.-... _, ..> 4_.�-s•"_ TOTAL EXPENSES l UNIT RATE QUANTITY :TOTAL n'+ .:...:a. t :... '^.'shay `'.�- ... '..ti�.�w-^4F:=-hr� ?:_..:: t..a'cr.,rr ."i: A?'� a;'_`+,.�.,`J:i:.. :�::.�.,�-.:: ,:;xx•�=^��a w - :.�.1•'.',.Y. Is SF 5 - EA $ - Mile $ 0.51 -:icy:..g::+•a\��^'-..,Y��:.:'_::--. EA> Day $ - EA S :.._....->.._ .-....:.:.s. _:._.:y.-_-_....,... ..__. _ _..,� _. .�. _. _. ... - - ' aC - _..a._ - - =':'r'.:_.:: .1.-%. _ - .Yb.-.n.: .�,�•:..._::.-._ten,.>:.c..:::.:::, n ..a- ,.>r ...'_ - ,g_:., r �.:._� .....sr.-�.-.::.� �-.'1,36i:: ...:c:e ... ->.,-. nr:::...:._ a .� _.... .�.:_...,. _...._ ......•..} .a::f,.a.r_..H'.,.-., _a: x.. :..a.. - Ks� _ - ::t^�'���; xa,�-r.b:-:�,�:k.,: '4i: .- ->•A6�:1: _,, 4>, u�°� :.� Q1�'� �,•`'�-'..-- � : P:_;a.- _x:r, �•f _ - .`.x� ,:EE:ti-+::.. : % ., 7w1 +..i'G n:ax:i5,..t1` - - � ca.': . F' •:Y ...::�4�'� S- ::tx:>.s Y9.52...&''.,.,•..y.,,. v�?:f..�'...:,n..: T:g :Y:.._ .. k_r`r'fi :c "vc«::r.�. 836.9 g _ 5 153.51 - __•< $ $ $ - ' :. $ 1,000.00 SUB-CONTRACTS: c.-n-.s:Yh ... ..t_ >. r. s .:: S(rjr% n ..., ..€�Yl!19,.__• ...PB._.Y.. .- .��k• •.;..C...y.:., _. .,:»_ ....y> tt....,.L._....:.., .� .,.s?._ r°=f..•::: Coim ..n ..Name:_,.-..;��.::�:�..�,.... ..:, ,_ .,.1�:.��.. a ..y:-, g.:.a.: }':. :.,,.r' .1:1.::iw • �j :i:»•!•:r... Go n : 8 • .>. mPa:, _I!E_mp _,,..... �.�•a .4..�._::Uft-tie�'.l *`T.s_:i..ii+.�n:.•S,-., ....:.a,,,.... r_....5"i :^; :.,._.. ,,.�.. -4�aa. x.'�[.. 7�>,..� ::_ .� :eek".;, . ,._...'`� •.:4o-'•.. 1... .-`Ic:'c .:� F.:......,:. _ .a....., : ;.:._...L-h.., � ...,.�.... ?.'_..... ....>...:.�......:..>n 3,-:_.: ,.._ ._,2..:._.. :.Y.=- _:t,� � - - a:�.3;i�iG':�:ii:=:iG�r'i .,.cp..s-.. :.: a,:v«•`�w.:.^::..:c �..�b.: :-':.: �... _%F.. .:.r.._.....: �:?`.>....:fi _"rs..:-,.-.,rr,:x,^`=�,::.: •._.. . :... _......._ •oa �.>a�n',.» v ,5 a'!C.::....;11:=..:....v,>u:• .„.: .. �L .�_ .': > (+.. .X ..__�-an..., �•ar:.:.,._,. ..,. :...�.u:.�'•Y-µ,,:•N:„.i"}u:`. . <: ...:::...- __oKc:�i-:eti ?.' a:.. -v-...... ..._ ._,v....x.�xa.=-:.,... ....ne3..Yhr+d:=. - --_-'i.A ..i:.s�. :->".��.,n {•-wF].>. T.,:.. _ u`^•v':1:.. =� �.a .c^..!,'�:'.. .:.. .r V .ti.g--..,-.:._.. . fx _ 'S:. e.. _ .: .. rca. .. d .:rs ....:A..a....'f>_. : .i._...v.: ...... .... .....fi�rr.. ... ... : ...,:�...•rt.�:c,_.-1: .,,a..,.y . .a,..1_--r.�:.:al-. . ?.:..,..•�,�.« n-..1w..y.. .:F�.Ys_:+•k�'Z_.. .:.: _.,4- .:-. .:......, : wn.;,a'i +:.<i:.:._... TOTAL SUB-CONTRACTS' :. . TASK •.-.:�: TOTAL ...t�_.>•:.a:.. �.._:.. _tna;!h: .Y.� :...> .......... . , ....... _._ -.: :... _Y.. : ; �:' _..A....:_.-- :.� - - _. r_t :^?._ ..:.: no.>.. , _..>,.> ... _: SSUN .S. $;. S Sir.. ,it,, ..>..:.✓. _ .�:.:,.:.-:i �: :....- c^':=_'� � ..su'K++..;T-.a..1.t.i��,?,,.5;?''� r?n`aX ,.,�'.- .. ....>.,.... .. , ro:....: ..-,+._ = ... :..__...., .. _ ..::F: •...: - .a. +r"i.P:7h.. K� -,F.:. 3:'Fk: : ..:.:_.�.:.:.,-v.-..�.-�. .. ::fi:._>•zEw•'-:` s.:.v •:..tom._ �.r.^.•>; _. :. :..ti ''''''.=.a::3-'R,...: : :.rs•._._. .-.>�7- .:. : x-F: i,•..�.. ,; vt:�,r.,._.: Sa :moi'« .:_3g� _ �-_��...,�-���. :S ;Le�e1.S.4.� - .�;���...�u..:.�..::.:��:; � ,, .:..c�=.::,- _ <:�; . ��>,. .You:..,- x . . va _ : r., . , - -'r.. 1 . >:. a: `:_vxl.:. �. - ir<-:.. .�p;,•�- • 4Sr:I`-:�.- :�._rj£-^!�,.a_....-r�.M.... a:5<:i'':- •v: �= tic: `yn.. .c....�...x:.:..::::,.'.ya._,s3,_L'r:.,=a=J.:ic:::;:':a::r:;o_z:r:.:^.: ...,:W-:.•,. :.. x-.y.i.. ....5:::='Y'+. :.. x..:w.:�:l:: ..:.: 'Y?s :E-a.dF `-� `.Q@ G... } .:.r>.- ..:_5.. jY. (]� ay tii{aao.- _ .�. - ;.} r.;�Ir�ii. _.$ISrtM�. .��n � v��w,.,.: :'="`: •�' . .... r...wr:,.......-.. .t-.i%.xr...... . _ :n'.s.-.._.. .. is .....!>.-.. .bs.. H... �t,..`3:;a •k . �'Ty..=.,5�•.:_:,y;...n5� � :*'x. _. >� _. .. r, [b, y'1 G - �Y;�� _... ... �.. r-. ..... .,.: .. .:: -.r.a :.,Ss:�y�, •R �%s:. M ^.: �.. .� . 'R.. ...� . E-.:�. +• R :!.t:.�Ti' r.. ic!c:.- �..dC � ..:w(,C � gi. � � � � .:: ... .., . _ e�- _. ...: .i; �,o �� ..� .:.,�•r_''->`.. .::>�;`:_`+•., _-�$.:. 's. �.^'e�k"�� :a:.:- ;p.... .-..� .?3..-. _ _ _ �:'i: .xo�•.-w...� � , � .+k.... .Y:. r.,�-.. a -� .is >-'.•:rl' y::M::C'�::atil:: ^vi<�.C.\i:�.-. :=.G.•2:^c a.:3'__ �M:^W S•L'�'t �:.4'�ic": 3''c' •,* - - ..�-•' :>a.a,r.-_ -mac':.$ . :..: ....i_r•:.�-� � _ _ _ i". ..v.+�, .� Y.•.. .:.::.t•?.° �:<c,,.... __ � �� 'd"-xv?.:.c•v:.'...�;-.�;a%? ',:�u� •,�F:.1.4::..�s`',` ^s � wa?a: _. ...s.; ....�..r-a "".,..rv.,v.-; ....�!F:9'' .._�,,._... _�._:.-,...�:c.._va;...--= .•-a,':_ , :t,.,r 2s.::. ..;7t:a.-flYa«sn,.•t. _ri. .,.+s.. .- . ,;!`-.,. �_..:c.:>. ...$ �' � :t;� -- ..G- F.>'- ..:. r.,... eF'•. a,, at.. t,,,a - .:.:+..•.: ra'. - �o �� - .'^i:.� - ir: `ti .i^_=y� m'+.>Y ..,t'S• v^{C-: �?.t.�..:a�t : •»'.r ,S�f .s i�`�'i_a 1.' �."X�Y:�-'�- -".�iC>qt]"c. 3.'-0.y '"� � C�.�. Sp{f .:.,.,.^•, , r.,ia�'..% � ma�y 1e�:• .CC. ..'. - �jr���K '-�Y.+':}` •a'iTi'..., a.. _� 4Y'`_:,� W::.. y�r r. N:>�.,_"'�"�K ,r•:`� 3:-. - a,- .:irJ: w .�1-Y--...�:.F.rt`-�•a �A•>`.-.� ..>e^.. �'.. `: ;ct...s....,.: _r:�.^v-:: - �¢ �, ..o+..• '�Ee� . - �� . � � : a+:. _ .. 'S i. .__a-• n.. -,-. a .;`^"•':G'•�1.::�:,lc°. ''"4.•L' - ..,lr.•l � 'S:c•.-. . . S.'. ,,,,, : j e ..'^,`4 [..G.=•;._ �,�s1:•• ,tnt, a.x.tic:Y. :..N' ,l�� � v� ��'.bw� r-:Y'=Y Ya •:i..:... ;:.�.. _ ':'�_ . �_,? h. '.#,.-. ,;:1� :: r.�4ae.'C+Y'�;�aC' %..�''.P��.:�.•�-' •s'�C.... }'.. � . 'r:!TytSV :�'�. s:.. :�; r'.. �$.. x.. g:r. �-�r. "���,,y x•3-.. ,�t�'� t.4�,.. �'t..�^l:,x�.,, ... . Yc�. "> .m...,.<:....�+.+°!v. � L....� i.:?'3r.1-r:: w z^u•-,. 41..K...w.,."s., i:'.S'�:_: • '�-b. >Y ••'n-T: -hS: _ ..'.'i•:S. , •Y �•�:: ':.�....,. ?3.;;c•: -,..'40.$ :+ F.Y..:., .�....__Y ..,9-,.•.M. - .s-1'^:v'.�: ':i�;. .vi'�- � r q�p ' �". ..C.. �.a..�:/^Y%�... •T^.,L'."' �;.. ,St�i'Y .....rih:! s':: �'3}' �;: 1Ji'.t :S l�%�•`.r%fi'LL..Lav_,t.a ""_'a:'�'e.'._� mss,. .?�a:. ... s.:ivif'���:`� � .ia r �•. .Cas ,. r•( w'n: _.V...::.-. V?": .� .:. . > '... .• Ca... Gr :.:.i-.. .F^r � .a��;..T, n.'.n.� :. ..... .:::: a�:nv': :- .'^si V'J'�+...J+ - �^.3'�'%G. +cfw•., t. ..w,.. .-`:-'S✓. - "aY4'�`�'+i� h.. u _.> ....sa yo, ._:.. r '+.aC' : .. .i ., f.. v. . ...3EW':•�'«: ..»:�' 'NKiya'�'r� �:i� y3�er V >! ..: .�. .,:....::.w..:.<a=x;-..-. ...,. i...:..:. ....n e. ....-t. it :..:.. .._. >. - . s• � y K-••K,S`. - _i.?sy. .P, 1,.._x..h`C-..: _ice. >: 4,:,..0,7,,,,,.. .s- .yy. -::.::-�-'�..:..y:::�1r,,: va V:� a c .::.:�' {... -,. .,, w-,as:. .. rZx__, _ ^':`,fr a. _ W�>ly.....: _ t_. a.:a.r��W: �'"� .C,... .. 2e:.._.... '''K; ..- `•,.:.4'�':5%ivi��' \>y� ..: .+••�,� ,. :.ij.,.... ._.-.:..:... r ns 4..' ... i:.n �:-. ....<.,•r.'+.^.�.ri. _.-...; .��' '.F:. :.... ,�=:,:.a ..h ..._ :'.. i.: ✓:_' >' __�: �.,*. .'sY.',�''4..... '����{:��Y;e.".. ..:..=s.:_ ....:Ti •n,,i-.v ...{.),;._.y.:'. _ ,.f;,T ❑9ri:'� . G,;..,;4:.�.>� tt.>.-:.do-:..-. c...w�a.•-•,-7÷-''''._,.:.oy�., }:.-�.c.... .-i+.�.. _:r:!. = 07,,:4--M'Sprx . ::'-.a:.c.z- ..L.... A._.n..a.:; _..:..�__ ti•-:_._:-:.__::5-ta:: �.A.r - ;.�ti:.. - - �=-�°��� _ . �:>-r _ �i:b:•:^ .... _ °Y- - .;f.:Y:r'.-•- _ �C•��J • r � �i:g':` �'...'�..�.>r-i�-:_ w,•.r.:..i - - � ::'s�>• _ , �'r.:,• �.1._.!:. :.:y>.^+:.S:L' . ��... ���xt'%�•,3,.�,°,5:-.> :�:r-�...1. � . . •;:i'"- n`l*.: 1:.. ✓o'f:.�,.��aYi-' °+ m.:'nn. �i` . -+'" - :.^.:s.. -� ,..�w._ - 'T':,�;�":_,' e' �.�::�-: y�'a'i;Ra.. ..i;�•. �SLI:y_ i .: T3.S-�,,?T �•nW�•!ya,G. Vii: •'G. �C _ - ':, s:>r' a'ex�"�'•�F _ y�� (J...,Glo=i��iY-:ir' x:Tl'_X''NY.. .}�.� �a,�� ye .,..*Z'... ::_ ¢^�•. .u. �iT~.Ta � �.�'.�+C'n _ :..:max'::. _ .,.F >:.�5{� •-•3'x>.... c"_' -, .ri :!:is...,y. _ `�! $ - �tv� : ;yµ,,._}.y.r: Y:3: �,#+at�'a+•F,,.. 'Y•'�u.; Y -to '�.>:=.a:.'_ '"�•> _ _ � :•rr-.=; 'v. `,� -' . :a. ,�..- 'f_. ...i'.� r �.:,n"�: ;?:.�o::�:<• r. :> •:k>;1: _ ,a,,•w+.� '^Y'� 'f"-".:n .�_ .��• _ ,-.y_: .+n�� :?, ...� :. ~_'4._ .uv�+^.x :a"•'. P:k'�?'.:5,:5:.5:c::: `.-v:Sy:�.�!ye^i.�; .r . �51'Y... >s4.,•y..-v :tFv�a.+ - S-.ff Y -•t_� � �..�r.... 4.. . w�i.:q. �. �L'':;i>•..i_i`}••''y-.a -� `�:'%3'. Sc.6. _ y�:..c,:�,,,� �•.,..:•:a"' • ,.z:� �s:n'.✓.�:, =iY;?7?_•:a 'ui+••. .:�'::,''yk`��x�'ET, „-5•Y�i='/tJ:r%�:'`-'•-_• _ :_�� C^ •. `S _x. «,y .. �^s�?m - _ .:.' _ _ .��_:. _7�..`r.Yi+`.- .����'.✓��i•.4 +��g. �:nYNG:%• h_. 1n :.r::.-• ~.� -c' ":Xs". i '-'�� � a. .tx: ->;.. ',� ..! .. Y.:.�.r. :"i�'ii.. a >!">.A :�' �, c5.1ki'�,>:6-'.k'f':Y.i.�:. lewd'. . ti� '-w"S, r1 i'•. rvS:.w. � -�:Ly2 i .. .psi;: .�, _ .t+,_.1..,;. '•: .��.d�.:.' ? ,>�'..�..,�,.: - ;•• rrfi :: .L �.�"7 +n '1 � .^:tY„S:•" ' _ty'.v.?:.�^" i.w� .`n'•['`�'� :-'�'q�:Y� - i:��•A'.. �:Y.,�Sy ?y,,•i..'�.�.T::.2 ...:.• i)>'x',.P. ..L.ee� . `',.y�',c 1.",�,.,:t..�': ; ,:�•.. rd.G1>. '�'.�r>;a- ey'3 . •fd>i.• �4.y »:.'JE;_.i �'.�'.:'E:-x'+:�N,�. syn' rj.>-T. - � tFi•-.... �3 Y.... ..?-.:..c..� w:.,v.•r.:, ,�. , ..,:�....�, ,.•,r:�: ;..•w._ _.4 . `a��r�p� Sc'' e, 7.::.r_ {?„-:si',�";' G. :.a''G.X^: �"•:-�^9y%:y'�,��'�f�..s}�.. �.{ r�.�;}e�;�e�e;.:'�; �. .:•.-:. s. t .; ::=:r,:.'.�''::-: T A.' -q.'�' .7:::, TOTAL DIRECT COSTS $ 1,000.00 TOTAL COST I $ 49,902.00 COMPANY NAME MANHOUR SUMMARY Sheet 2 of 4 Project Name City of Round Rock FC 110 ROUTE AND DESIGN STUDIES Manhours Rate Direct Labor Project Engineer 0 $42.79 $ Engineer 0 $35.10 $ Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ Sub -total 0 $ FC 120 ENVIRONMENTAL STUDIES Manhours Rate Direct Labor Project Engineer 120 $42.79 $ 5,134.80 Engineer 0 $35.10 $ Senior Civil Designer 309 $27.40 $ 8,466.60 Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ Sub -total 429 $ 13,601.40 FC 130 RIGHT OF WAY PLANS Manhours Rate Direct Labor Project Engineer 0 $42.79 $ Engineer 0 $35.10 $ Senior Civil Designer 0 $27.40 - $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ Sub -total 0 $ FC 150 FIELD SURVEYS/MAPPING Manhours Rate Direct Labor Project Engineer 0 $42.79 $ Engineer 0 $35.10 $ Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ Sub -total 0 $ COMPANY NAME MANHOUR SUMMARY Sheet 3of4 Project Name City of Round Rock FC 160 ROADWAY DESIGN CONTROLS Manhours Rate Direct Labor Project Engineer 0 $46.00 $ Engineer 0 $46.00 $ Senior Civil Designer 0 $42.00 $ Civil Designer 0 $42.00 $ Junior Civil Designer 0 $38.00 $ Administrative Assistant 0 $34.00 $ Sub -total 0 $ FC 161 DRAINAGE Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 162 SIGNING, MARKINGS AND SIGNALIZATION Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech Ill 0 $34.00 $ Sub -total 0 $ FC 163 MISCELLANEOUS (ROADWAY) Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 170 BRIDGE DESIGN Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ COMPANY NAME MANHOUR SUMMARY Sheet 4 of 4 Project Name City of Round Rock FC 164 MANAGING CONTRACTED PROF. SERVICES Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 165 TRAFFIC MANAGEMENT SYSTEMS Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec Ill 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 190 PROJECT MANAGEMENT Manhours Rate Direct Labor Engineer V 42 $46.00 $ 1,932.00 Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ - Engineer I .0 $38.00 $ - Engr Tech III 0 $34.00 $ - Sub -total 42 $ 1,932.00 FC 191 SUPPORT SERVICES Manhours Rate Direct Labor Engineer V 42 $46.00 $ 1,932.00 Engr Spec V 0 $46.00 $ Engineer III V 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 42 $ 1,932.00 FC 310 CONSTRUCTION PROJECT SUPERVISION Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $