Loading...
R-11-06-23-10C10 - 6/23/2011RESOLUTION NO. R -11-06-23-10C10 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction for the Southwest Downtown Infrastructure Improvements (Main Street) Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Cash Construction for the Southwest Downtown Infrastructure Improvements (Main Street) Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of June, 2011. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary O:\wdox\SCClnts\0112\ 1104\MUNICIPAL \00224892. DOC/rmc Contract Quantity Adjustment/Change Order ROUND ROCK. TEXAS rev, 09/10 Department: Transportation Department Project Name: Southwest Downtown District Infrastructure Improvements (Main Street) City Project ID Number TX02AREA Justification Date: Change Order/Quantity Adjustment No. Page 1 of 5 6/23/2011 2 This is to complete construction of the 200 block of Harris Street to final competition. The SWDT (Main Street) project is replacing the Harris Street utilities to all underground and completing the required storm sewer. The additional work will complete a 12" water main and connection to Liberty Street, extending an E-4 duct bank and the surface street scape. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract lime with All Approved Change Orders: City Staff Approval: ignature City Offici Approv. : Amount % Change $3,191,202.00 11111111111 - $16,970.00 $0.00 - $16,970.00 $3,174,232.00 $111,982.00 $431,096.10 $543,078.10 $3,717,310.10 270 3.51% 13.51% 17.02% 276 350 Todd Keltgen, Public Works Ops. Mgr. Printed Name, Title and Company BJ Cash, Project Manager Cash Construction Co. Printed Name, Title and Company Todd Kelt en Public Works Ops. M r. Printed Name, Title Days Days Days 5/31/2011 Date 6/1/2011 Date 5/31/2011 Date Signature Printed Name, Title Date EXHIBIT „A„ rR...-- .0 rev, 09/10 Contract Quantity Adjustment/Change Order Page 2 of 5 cnan i e Oraer Data Bid Item # 1 Item Descri .tion and Chan . e Street Excavation, complete in place (Plan Quantity). Unit CY I 1250 Unit Price $16.00 Amount $20,000.00 Contract Time Adjustment (Days) 2 Remove P.C. Concrete Curb and Gutter and Disposal, complete in place per lineal foot, LF 450 $4.00 $1,800.00 3 Remove P.C. Concrete Sidewalk and Driveway and Disposal, complete in place per square foot SF 2217 $1.30 $2,882.10 4 Trench Safety Plan and Trench Safety (all depths), complete in place. LF 600 $1.00 $600.00 5 Reconstruct Concrete Sidewalks to 4 Inch Thickness, including removal of existing sidewalk; SF , 100 $6.00 $600.00 6 Hot Mix Asphaltic Concrete Pavement, 2 inches, Type D, complete in place per square yard, SY 1360 $8.00 $10,880.00 7 10.5" Asphalt -Stabilized Base (CH Subgrade Area), complete in place. SY 1610 $40.00 $64,400.00 8 Sidewalk Concrete Paving Unit (2-3/8" thick) with 1" Sand, 6" Cement Stabilized Crushed Limestone, and 6" Compacted Subgrade, complete in place per square foot, SF 7667 $5.00 $38,335.00 9 Sidewalk Ramp Concrete Paving Unit with 1" Sand, 6" Cement Stabilized Crushed Limestone, and 6" Compacted Subgrade, , complete in place per square foot, SF 90 $7.00 $630.00 12 P.C. Concrete Driveway, complete in place. SF 1287 $5.00 $6,435.00 13 P.C. Concrete Curb & Gutter, complete in place. LF 659 $16.00 $10,544.00 14 P.C. Concrete Valley Gutter, complete in place. SF 300 $10.00 $3,000.00 15 P.C. Concrete Retainer Curb Type "A", complete in place. LF 520 $13.00 $6,760.00 18 Filter Inlet Protection (Includes area inlets, curb inlets, and trench drains), complete in place. EA 3 $70.00 $210.00 rev, 09/10 Contract Quantity Adjustment/Change Order Page 3 of 5 Bid Item # 20 Item Descri i tion and Chan . e Traffic Signs (24" Stop), Including "ALL WAY" or "4 WAY", 'TWO WAY LEFT TURN", "KEEP RIGHT' and STREET NAMES SIGNS, complete in place. Unit EA • . 2 Unit Price $350.00 Amount $700.00 contract Time Adjustment (Days) 21 Reflectorized Type I Thermoplastic Pavement Markings; 4 inches in width, 100 mils in thickness per lineal foot LF 760 $2.00 $1,520.00 23 Reflectorized Type I Thermoplastic Pavement Markings; 24 inches in width, 100 mils in thickness white in color per lineal foot LF 15 $6.00 $90.00 25 Reflectorized Type I Thermoplastic Pavement Markings - "WHEEL CHAIR SYMBOL"; 60 inches in width, 100 mils in thickness white in color per each LF 1 $200.00 $200.00 27 Handicap Ramp to Structure (each 5' wide and 20' long with 5' x 5' landings at each end), complete in place. LF 50 $80.00 $4,000.00 28 Sodding , complete in place per square yard, SY 145 $4.00 $580.00 29 Type A Survey Markers with Adjustable Valve Box, complete in place per each, EA 1 $300.00 $300.00 30 E2 - Duct Bank (Gas, Electrical & Communications), complete in place. LF 170 $220.00 $37,400.00 38 Coordination of Gas Installation - ATMOS, complete in place. EA 0 $10,000.00 $2,000.00 45 Street Light Including Foundation, complete in place. EA 6 $6,000.00 $36,000.00 47 1" Dia. SCH80 PVC Street Light Conduit, complete in place. LF 350 $17.00 $5,950.00 48 2" Dia. SCH80 PVC Street Light Conduit, complete in place. LF 300 $35.00 $10,500.00 49 120V, 20A GFI Receptacle With Single Gang Back Box 2-3/4" and Single Gang Vertical In -Use Cover, complete in place per each, EA 6 $400.00 $2,400.00 50 Electric Pull Box, complete in place. EA 2 $2,500.00 $5,000.00 l'ilfr ROUND ROCJC. TEXAS PUMP. ...MOM MfiSMDfY rev, 09/10 Contract Quantity Adjustment/Change Order Page 4of5 Bid Item # 51 Item Descri s tion and Chan • e Street Lighting Electric Wiring, complete in place. c;nan • e Oraer Unit LS Data • • 0 Unit Price $25,000.00 Amount $8,250.00 on•a_ Time Adjustment (Days) 52 4" Sch. 40 PVC irrigation sleeve, including all fittings and appurtenances, complete in place. LF 720 $20.00 $14,400.00 53 Sch 40 PVC Irrigation Line including all fittings and appurtenances, complete in place. LS 0 $30,000.00 $9,900.00 54 2" Water Meter, including cast iron valve box, complete in place. EA 1 $2,000.00 $2,000.00 55 2" Backflow Preventer, including cast iron valve box, complete in place. EA 1 $3,000.00 $3,000.00 56 2" Gate Valve, including cast iron valve box, complete in place. EA 1 $500.00 $500.00 57 Irrigation Valves with Battery Operated Solenoid, including cast iron valve box, complete in place. EA 1 $2,000.00 $2,000.00 58 Tree Bubblers, including 4' of flex pipe, fittings and appurtenances, complete in place. EA 6 $200.00 $1,200.00 60 Installation of Tree Well w/ Tree Grate and w/ Mulch including excavations, concrete retainer curbs, weather-proof grounded electrical receptacle, grate retainer, and tree grate, installation of mulch (mulch provided by City of Round Rock), complete in place per each, EA 6 $4,000.00 $24,000.00 61 Installation of Tree Well w/ Mulch including excavations, concrete retainer curbs, weather-proof grounded electrical receptacle, installation of mulch (mulch provided by City of Round Rock), complete in place per each, EA 3 $4,000.00 $12,000.00 62 5' Curb Inlet, complete in place. EA 1 $2,200.00 $2,200.00 63 10' Curb Inlet , complete in place. EA 1 $3,200.00 $3,200.00 65 3'x3' Area Inlet, complete in place. EA (2) $1,800.00 -$3x600.00 66 PVC, 12" Dia., induding Excavation and Backfill, complete in place. LF 14 $65.00 $910.00 67 RCP, 18" Dia., induding Excavation and Backfill, complete in place. LF 100 $90.00 $9,000.00 79 10"x18' Trench Drain (Type B), complete in place. EA 2 $14,000.00 $28,000.00 82 12" PIPE (PVC AWWA C-900 Class 200, or DI AWWA C-100 Min. Class 200), complete in place. LF 275 $80.00 $22,000.00 rev, 09/10 Contract Quantity Adjustment/Change Order Page 5 of 5 Bid Item # 86 Item Descri • tion and Chan . e 1-1/2" Service Line, complete in place. Unit LF . 1 Unit Price $40.00 Amount $40.00 Contract Time Adjustment (Days) 87 Fire Hydrant Assembly (per detail), complete in place. EA 1 $3,000.00 $3,000.00 89 6" Gate Valve, complete in place. EA 1 $900.00 $900.00 91 12" Gate Vale, complete in place. EA 2 $2,000.00 $4,000.00 92 12"x12" Tapping Sleeve & Valve, complete in place per each, EA1 $7,000.00 $7,000.00 93 Ductile Iron Fittings 4 inch through 24 inch, complete in place per ton, _ TON 0 $10,000.00 $1,000.00 94 Single water service connection EA 1 ' $2,000.00 $2,000.00 106 Barricades , Signs, Traffic handling, complete in place EA 12 $40.00 $480.00 74 TOTALS: $431,096.10 74 ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. City Council Agenda Summary Sheet Agenda Item No. 10C10. Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 2 with Cash Construction for the Southwest Downtown District Infrastructure Agenda Caption: Improvements (Main Street) Project. Meeting Date: June 23, 2011 Department: Infrastructure Development and Construction Management Staff Person making presentation: Michael Thane, P.E. Director of Infrastructure Management Item Summary: The City Council awarded the Southwest Downtown Infrastructure Improvements (Main Street) project to Cash Construction on October 18, 2010, for $3,192,202. Quantity Adjustment/Change Order No. 1 in the amount of $111,982 was approved on June 9, 2011. This quantity adjustment/change order resulted in a 13.51% increase in the original contract. Quantity Adjustment/Change Order No. 2 is required to complete construction of the 200 block of Harris Street to final competition. The existing Southwest Downtown Infrastructure Improvements (Main Street) project is replacing the Harris Street overhead utilities to all underground, relocating the existing Atmos gas mains and service lines and completing the required storm sewer. This change order will complete a 12" water main and connection to the water main in Liberty Street, extending an E-4 duct bank to Liberty Street and the surface street scape for Harris Street. Quantity Adjustment/Change Order No. 2 in the amount of $431,096.10 brings the total change to the original contract to 17.02%. The contract amount will be increased to $3,717,310.10 with this change. Strategic Plan Relevance: 26.0 Construct major elements of the transportation and mobility systems as approved by council in the master transportation plan. Cost: $ 431,096.10 Source of Funds: 4B -Round Rock Transportation Corporation -Construction Date of Public Hearing (if required): N/A Recommended Action: Approval EXECUTED DOCUMENTS FOLLOW rev, 09/10 Contract Quantity Adjustment/Change Order Department: Transportation Department Project Name: Southwest Downtown District Infrastructure Improvements (Main street) City Project ID Number TX02AREA Justification Date: Change Order/Quantity Adjustment No. Page 1 of 5 6/23/2011 2 This is to complete construction of the 200 block of Harris Street to final competition. The SWDT (Main Street) project is replacing the Harris Street utilities to all underground and completing the required storm sewer. The additional work will complete a 12" water main and connection to Liberty Street, extending an E-4 duct bank and the surface street scape. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract lime with All Approved Change Orders: Prepared By: Contractor Approval: City Staff Approval: City Offici Approv • . ature I7 CyX`— Sign ture Signature Amount $3,191,202.00 -$16,970.00 $0.00 -$16,970.00 $3,174,232.00 $111,982.00 $431,096.10 $543,078.10 $3,717,310.10 270 0/0 Change 3.51% 13.51% 17.02% 276 350 Days Days Days Todd Kelt en, Public Works O•s. M Printed Name, Title and Company BJ Cash, Project Manager Cash Construction Co. Printed Name, Title and Company Todd Keltgen Public Works Ops. Mgr. Printed Name, Title Atti M� 1APE Oity°Sr. Printed Name, Title 5/31/2011 Date 6/1/2011 Date 5/31/2011 Date 4234( Date Contract Quantity Adjustment/Change Order ROUND ROCK TEXATS aivm� m<"swr—v.7ssviu rev, 09/10 Page 3 of 5 Bid Item # 20 Item Descri . tion and Chan . e Traffic Signs (24" Stop), Including "ALL WAY" or "4 WAY", "TWO WAY LEFT TURN", "KEEP RIGHT" and STREET NAMES SIGNS, complete in place. Unit EA • . 2 Unit Price $350.00 Amount $700.00 contract Time Adjustment (Days) 21 Reflectorized Type I Thermoplastic Pavement Markings; 4 inches in width, 100 mils in thickness per lineal foot LF 760 $2.00 $1,520.00 23 Reflectorized Type I Thermoplastic Pavement Markings; 24 inches in width, 100 mils in thickness white in color per lineal foot LF 15 $6.00 $90.00 25 Reflectorized Type I Thermoplastic Pavement Markings - "WHEEL CHAIR SYMBOL"; 60 inches in width, 100 mils in thickness white in color per each LF 1 $200.00 $200.00 27 Handicap Ramp to Structure (each 5' wide and 20' long with 5' x 5' landings at each end), complete in place. LF 50 $80.00 $4,000.00 28 Sodding , complete in place per square yard, SY 145 $4.00 $580.00 ' 29 Type A Survey Markers with Adjustable Valve Box, complete in place per each, EA 1 $300.00 $300.00 30 E2 - Duct Bank (Gas, Electrical & Communications), complete in place. LF 170 $220.00 $37,400.00 38 Coordination of Gas Installation - ATMOS, complete in place. EA 0 $10,000.00 $2,000.00 45complete Street Light Including Foundation, in place. EA 6 $6,000.00 $36,000.00 47 1" Dia. SCH80 PVC Street Light Conduit, complete in place. LF 350 $17.00 $5,950.00 48 2" Dia. SCH80 PVC Street Light Conduit, complete in place. LF 300 $35.00 $10,500.00 49 120V, 20A GFI Receptacle With Single Gang Back Box 2-3/4" and Single Gang Vertical In -Use Cover, complete in place per each, EA 6 $400.00 $2,400.00 50 Electric Pull Box, complete in place. EA 2 $2,500.00 $5,000.00 Contract Quantity Adjustment/Change Order ROUND ROCTEXAS iii iii 'r earl moikliiit rev, 09/10 Page 5 of 5 Bid Item # 86 Item Descri ' tion and Chan . e 1-1/2" Service Line, complete in place. Unit LF •,V . 1 Unit Price $40.00 Amount $40.00 contract Time Adjustment (Days) 87 Fire Hydrant Assembly (per detail), complete in place. EA 1 $3,000.00 $3,000.00 89 6" Gate Valve, complete in place. EA 1 $900.00 $900.00 91 12" Gate Vale, complete in place. EA 2 $2,000.00 $4,000.00 92 12"x12" Tapping Sleeve & Valve, complete in place per each, EA 1 $7,000.00 $7,000.00 93 Ductile Iron Fittings 4 inch through 24 inch, complete in place per ton, TON 0 $10,000.00 $1,000.00 94 Single water service connection EA 1 $2,000.00 $2,000.00 106 Barricades , Signs, Traffic handling, complete in place EA 12 $40.00 $480.00 74