R-11-08-11-8B2 - 8/11/2011RESOLUTION NO. R -11-08-11-8B2 WHEREAS, the City of Round Rock ("City") has previously entered into an Advance Funding Agreement ("Agreement") with the Texas Department of Transportation ("TxDOT") for the FM 1460 (A.W. Grimes North) — Old Settlers Boulevard to University Boulevard Project ("Project"), and WHEREAS, by Resolution No. R -09-05-14-9G7, the City Council approved the Agreement, and WHEREAS, by Resolution No. R -10-06-10-9D2, the City Council approved Amendment No. 1 to the Agreement, and WHEREAS, the City Council desires to enter into Amendment No. 2 to the Agreement with TxDOT to delete in its entirety Attachment A-1, Payment Provisions and Work Responsibilities of Amendment No. 1 and replace with Attachment A-2, Payment Provisions and Work Responsibilities, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Advance Funding Agreement Amendment No. 2 with TxDOT, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. O:\wdox\SCClnts\0112\1104\MUNICIPAL\00229046.DOC/rmc RESOLVED this 11th day of August, 2011. ATTEST: • SARA L. WHITE, City Secretary 2 ALAN MCGRAW, Mayor City of Round Rock, Texas STATE OF TEXAS COUNTY OF TRAVIS § CSJ # 2211-02-021 District # 14 - Austin Code Chart 64 # 36750 Project: FM 1460 from Old Settlers to University Blvd. Federal Highway Administration CFDA # 20.205 Not Research and Development ADVANCE FUNDING AGREEMENT AMENDMENT #2 THIS AMENDMENT is made by and between the State of Texas, acting through the Texas Department of Transportation, called the State, and the City of Round Rock, acting by and through its duly authorized officials, called the Local Government. WITNESSETH WHEREAS, the State and the Local Government executed a contract on the 21St day of May, 2009, to effectuate their agreement to construct the widening FM 1460 from a two-lane roadway to a four lane roadway from Old Settlers to University Blvd, within the City of Round Rock; and, WHEREAS, this Agreement was previously amended on the 17th day of June, 2010; and, WHEREAS, because of a change in Project funding, it has become necessary to amend that contract; NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties, the State and the Local Government do agree as follows: AGREEMENT 1. Description of Amended Items Attachment A-1, Payment Provisions and Work Responsibilities of Amendment #1 is being deleted in its entirety and replaced with Attachment A-2, Payment Provisions and Work Responsibilities contained herein. All other provisions of the original contract are unchanged and remain in full force and effect. 2. Signatory Warranty Each signatory warrants that the signatory has necessary authority to execute this agreement on behalf of the entity represented. AFA—AFA_Amend Page 1 of 4 Revised 04/08/11 CSJ # 2211-02-021 District # 14 - Austin Code Chart 64 # 36750 Project: FM 1460 from Old Settlers to University Blvd. Federal Highway Administration CFDA # 20.205 Not Research and Development THIS AGREEMENT IS EXECUTED by the State and the Local Government in duplicate. THE LOCAL GOVERNMENT Signature Typed or Printed Name Title Date THE STATE OF TEXAS Janice Mullenix Director of Contract Services Texas Department of Transportation Date AFA—AFA_Amend Page 2 of 4 Revised 04/08/11 CSJ # 2211-02-021 District # 14 - Austin Code Chart 64 # 36750 Project: FM 1460 from Old Settlers to University Blvd. Federal Highway Administration CFDA # 20.205 Not Research and Development ATTACHMENT A-2 Payment Provisions ARRA funds will be used towards eligible construction costs for the widening of FM 1460 from a two lane roadway to a four lane facility. Earmark funds in the amount of $459,593.53 are being transferred to this project from an adjacent federally funded project on FM 1460 (CSJ: 2221-02-015), for a maximum amount of $ 9,688,950.53 of Federal funds available. onstruction (by State) Earmark Funds onstruction Direct tate Costs 5.3% The funding CSJ for the Federal Earmark funds is 2211-02-022. Local Government's participation = 100% of project budget overruns and any non -Federal participating change orders requested by the Local Government. This is an estimate. The final amount of Local Government participation will be based on actual costs. It is further understood that the State will include only those items for the improvements as requested and required by the Local Government. AFA AFA Amend Page 3 of 4 Revised 04/08/11 Work Responsibilities Environmental Requirements CSJ # 2211-02-021 District # 14 - Austin Code Chart 64 # 36750 Project: FM 1460 from Old Settlers to University Blvd. Federal Highway Administration CFDA # 20.205 Not Research and Development A. The State shall prepare the appropriate environmental documentation and secure environmental clearance for the project. B. To the extent required to complete the project, the state will be responsible for the mitigation and remediation of any environmental problems associated with the development of the Project. Engineering Requirements The Local Government has completed all engineering plans. Construction Responsibilities A. The State shall advertise for the construction bids, issue bid proposals, receive and tabulate the bids and award and administer the contract for construction of the Project. Administration of the contract includes the responsibility for construction engineering and or issuance of change orders, supplemental agreements, amendments or additional work orders which may become necessary subsequent to the award of the construction contract. B. The State will use its approved contract letting and award procedures to let and award the construction contract. C. The Local Government will retain, at its own expense, a consultant engineer for construction phase services. Those services entail shop drawing review, preparation of any re -design, alternative design or additional design details needed during construction. The consultant engineer will also be available to respond to questions relating to the plans. AFA AFA Amend Page 4 of 4 Revised 04/08/11 ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Agenda Item No. 8B2. City Council Agenda Summary Sheet Consider a resolution authorizing the Mayor to execute Amendment No. 2 to the Advance Funding Agreement with TxDOT for the FM 1460 (A.W. Grimes North) — Old Settlers Agenda Caption: Boulevard to University Boulevard to University Boulevard Project. Meeting Date: August 11, 2011 Department: Transportation Staff Person making presentation: John Dean Transportation Planner Item Summary: The ongoing work on FM 1460/A.W. Grimes Boulevard consists of two projects: Project #1 is from Old Settlers Boulevard to US 79 (the "south" project), and Project #2 is from University Boulevard to Old Settlers Boulevard (the "north" project). On May 21, 2009 the Mayor executed an advanced funding agreement (AFA) with the Texas Department of Transportation (TxDOT) for the FM 1460/A.W. Grimes Boulevard North project. This agreement was subsequently amended on June 17, 2010 — this agreement addressed financial responsibilities for all parties involved with the project. During the summer of 2010, Congressman John Carter's office secured a federal earmark in the amount of $749,842 to be applied to FM 1460. Through an agreement with TxDOT, this earmark was designated to fund City requested change orders on the FM 1460 South project. The FM 1460 South project is nearing completion, and there is a surplus balance of $459,594 in earmark funds that have not been utilized. No further change orders are anticipated on the FM 1460 South project. Approval of this resolution will move these remaining earmark funds to the FM 1460 North project, where they will be used to fund City requested change orders and any other change orders which TxDOT may have initiated. Strategic Plan Relevance: Goal 21.0: Identify and plan for future connectivity and mobility needs and options. Goal 25.0: Develop funding source mechanisms for mobility and connectivity options. Goal 26.0: Construct major elements of the transportation and mobility system as approved by Council in the Master Transportation Plan. Cost: Source of Funds: N/A N/A Date of Public Hearing (if required): N/A Recommended Action: Approval EXECUTED DOCUMENTS FOLLOW STATE OF TEXAS COUNTY OF TRAVIS § CSJ # 2211-02-021 District # 14 - Austin Code Chart 64 # 36750 Project: FM 1460 from Old Settlems to University Blvd. Federal Highway Administration CFDA # 20.205 Not Research and Development ADVANCE FUNDING AGREEMENT AMENDMENT #2 THIS AMENDMENT is made by and between the State of Texas, acting through the Texas Department of Transportation, called the State, and the City of Round Rock, acting by and through its duly authorized officials, called the Local Government. WITNESSETH WHEREAS, the State and the Local Government executed a contract on the 218t day of May, 2009, to effectuate their agreement to construct the widening FM 1460 from a two-lane roadway to a four lane roadway from Old Settlers to University Blvd, within the City of Round Rock; and, WHEREAS, this Agreement was previously amended on the 17th day of June, 2010; and, WHEREAS, because of a change in Project funding, it has become necessary to amend that contract; NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties, the State and the Local Government do agree as follows: AGREEMENT 1. Description of Amended Items Attachment A-1, Payment Provisions and Work Responsibilities of Amendment #1 is being deleted in its entirety and replaced with Attachment A-2, Payment Provisions and Work Responsibilities contained herein. All other provisions of the original contract are unchanged and remain in full force and effect. 2. Signatory Warranty Each signatory warrants that the signatory has necessary authority to execute this agreement On behalf of the entity represented. AFA-AFA_Amend 9.'11- 08- lSg2-- Page 1 of 4 Revised 04/08/1 CSJ # 2211-02-021 District # 14 - Austin Code Chart 64 # 36750 Project: FM 1460 from Old Settler to University Blvd. Federal Highway Administration CFDA # 20.205 Not Research and Development THIS AGREEMENT IS EXECUTED by the State and the Local Government in duplicate. THE LO GOVERN NT Signature p AASCIY4tA/ Typed or Printed Name Title 6.(1.11 Date THE STATE OF TEXAS ce is Mulienix irector of Contract Services Texas Department of Transportation iii..0,e AFA—AFA_Amend Page 2 of 4 Revised 04/08/11 CSJ # 2211-02-021 District # 14 - Austin Code Chart 64 # 36750 Project: FM 1460 from Old Sett!: to Universitv Blvd. Federal Highway Administration CFDA # 20.205 Not Research and Development ATTACHMENT A-2 Payment Provisions ARRA funds will be used towards eligible construction costs for the widening of FM 1460 from a lane roadway to a four lane facility. Earmark funds in the amount of $459,593.53 are being transferred to this project from an adjacent federally funded project on FM 1460 (CSJ: 2221-02-01 for a maximum amount of $ 9,688,950.53 of Federal funds available. The funding CSJ for the Federal Earmark funds is 2211-02-022. Local Government's participation = 100% of project budget overruns and any non -Federal participating change orders requested by the Local Government. This is an estimate. The final amount of Local Government participation will be based on actual costs. It is further understood that the State will include only those items for the improvements as requested and required by the Local Government. AFA-AFA_Amend Page 3 of 4 Revised 04/08/1 ppyy iµ gg ngineering ,b Local Govemment .0 •% 0 s% 0 •% ,"0 onstruction (by State) RRA Funds 9,229,357.00 100% 9,229,357.00 ■ .�, onstruction (by State) armark Funds 459,593.53 100% 459,593.53 i% ,.0 s% $0 s _3 Environmental Direct tate Costs rc '.0 u s% •'.0 •% ,.0 . i% 0 $ gg Right of Way Direct tate Costs 0 . i% 0 •% 0 s% 0 Engineering Direct State osts ,"0 s% '.0 •% 0 '% 0 Utility Direct State Costs 0 i % 0 s % 0 • % 0 onstruction Direct tate Costs 5.3% 513,514.38 • % 0 100% 513,514.38 i % 0 Indirect State Costs 6.2% 600,714.93 •% 0 100%.600,714.93 0 .x kt The funding CSJ for the Federal Earmark funds is 2211-02-022. Local Government's participation = 100% of project budget overruns and any non -Federal participating change orders requested by the Local Government. This is an estimate. The final amount of Local Government participation will be based on actual costs. It is further understood that the State will include only those items for the improvements as requested and required by the Local Government. AFA-AFA_Amend Page 3 of 4 Revised 04/08/1 Work Responsibilities Environmental Requirements CSJ # 2211-02-021 District # 14 - Austin Code Chart 64 # 36750 Project: FM 1460 from Old Settlen to University Blvd. Federal Highway Administration CFDA # 20.205 Not Research and Development A. The State shall prepare the appropriate environmental documentation and secure environmental clearance for the project. B. To the extent required to complete the project, the state will be responsible for the mitigation and remediation of any environmental problems associated with the development of the Project. Engineering Requirements The Local Government has completed all engineering plans. Construction Responsibilities A. The State shall advertise for the construction bids, issue bid proposals, receive and tabulate the bids and award and administer the contract for construction of the Project. Administration of the contract includes the responsibility for construction engineering and or issuance of change orders, supplemental agreements, amendments or additional work orders which may become necessary subsequent to the award of the construction contract. B. The State will use its approved contract letting and award procedures to let and award the construction contract. C. The Local Government will retain, at its own expense, a consultant engineer for construction phase services. Those services entail shop drawing review, preparation of any re -design, alternative design or additional design details needed during construction„ The consultant engineer will also be available to respond to questions relating to the plans. AFA AFA Amend Page 4 of 4 Revised 04/08/11