R-11-08-25-9E4 - 8/25/2011RESOLUTION NO. R -11-08-25-9E4 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with SKE Construction, LLC for the Greenslopes A/C Waterline Replacement Project — Phase II, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with SKE Construction, LLC for the Greenslopes A/C Waterline Replacement Project — Phase II, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 25th day of August, 2011. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary O:\wdox\SCCInts\0112\ 1104\MUNICIPAL\00230284. DOC/rmc Contract Quantity Adjustment/Change Order ROCK TEXAS rev, 06/11 Department: Utilities & Environmental Services Project Greenslopes A/C Waterline Name: Replacement Project - Phase II City Project ID Number WL02ASB2009 Justification EXHIBIT "A„ Date: Page 1 of 3 8/4/2011 Change Order/Quantity Adjustment No. C.O. #1 Because of recent waterline breaks on Greenlawn Boulevard, it is necessary to replace existing asbestos cement pipe with new HDPE pipe and add new gate valves at intersections. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: City Staff: Jeff Bell, Project Manager Printed Name, Tide $0.00 $187,030.00 $187,030.00 0.00% 22.82% 22.82% $187,030.00 150 Calendar Days Calendar Days 30 Calendar Days 180 Calendar Days Date 4 -Aug -11 For Contractor: For City of Round Rock: P SN LLY Arge-kwor/ceo Signature Printed Name, Title Date Signature Printed Name, Title Date ROUND ROO(, TEXAS MARI. mamas. P1033•11,31,‘ rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Greenslopes A/C Waterline Replacement Project - Phase II Quan. Adj./Change Order No.: C.O. #1 Item # Item Descri ' tion Chan . e Order Data Unit Price Amount Page 2 of 3 Time Adjustment (Days) 1 2 re -c orma -• pipe •u ing o existing 8 inch asbestos cement waterline, replace with 8 inch HDPE DR 13.5 waterline. L.F. 8 inch Gate Valves Ea. 1874 $95.00 $178,030.00 30 6 $1,500.00 $9,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $187,030.00 30 HOUND ROCK, TEXAS rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Greenslopes A/C Waterline Replacement Project - Phase II Quan. Adj./Change Order No.: C.O. #1 uanti Ad'ustment Data Bid Item # Item Descri • tion Amount Page 3 of 3 Time Adjustment (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0:00 $0.00 $0.00 $0.00 TOTALS: $0.00 0 ROUND ROCK, TEXAS PURPOSE. PASSION, PROSPERITY Agenda Item No. 9E4. City Council Agenda Summary Sheet Agenda Caption: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 1 with SKE Construction, LLC for the Greenslopes A/C Waterline Replacement Project — Phase II. Meeting Date: August 25, 2011 Department: Utilities and Environmental Services Staff Person making presentation: Michael Thane, P.E. Utilities Director Item Summary: This project continues the City's Asbestos -cement A/C pipe replacement program that began November 2007 and is in the second phase of the Greenslopes area. The second phase includes the replacement of 8,475 feet of eight -inch A/C waterlines in the Greenslopes subdivision. This program will continue annually throughout the City to replace A/C waterline pipe as necessary. Continuing water main breaks on Greenlawn Blvd. has made it necessary to replace an additional 1,874 feet of existing A/C waterline pipe south from Logan Street. Replacing this additional portion of A/C waterline will lessen the amount of overtime accrued by the City's maintenance staff and minimize the inconvenience to our customers. SKE Construction, LLC of Alvin, Texas has been awarded the contract for this project. This Change Order raises the original contract of $819,688.00 by $187.030.00 for a total of $1,006,718.00. This is a 22.8 percent increase in the contract amount. Cost: $187,030.00 Source of Funds: Self -Financed Water Construction Date of Public Hearing (if required): N/A Recommended Action: Approval EXECUTED DOCUMENTS FOLLOW rev, 06/11 Contract Quantity Adjustment/Change Order Department: Utilities & Environmental Services Project Greenslopes A/C Waterline Name: Replacement Project - Phase II City Project ID Number WL02ASB2009 Justification Date: Page 1 of 3 8/4/2011 Change Order/Quantity Adjustment No. C.O. #1 Because of recent waterline breaks on Greenlawn Boulevard, it is necessary to replace existing asbestos cement pipe with new HDPE pipe and add new gate valves at intersections. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Jeff Bell, Project Manager 4 -Aug -11 Printed Name, Title Date Approvalls, City Staff: ignatu 1 Amount $819,688.001 $0.00 $0.00 $0.00 $819,688.001 $0.00 $187,030.00 $187,030.00 $1,006,718.001 $187,030.00 150 Calendar Days 0/0 Change Calendar Days 30 Calendar Days 180 Calendar Days For Contractor: For City of Round Rock: Pri ted • ntracto ompa S#Ea..4 AERNAE-r� Sign� A Printed Name, Title Signature U�-O —2S —J A all M W4Ali Printed Name, Title Da e 6.? / 1 Date rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Qua n. Adj./Change Order No.: Greenslopes A/C Waterline Replacement Project - Phase II C.O. #1 Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) ti .. 1 Pre -chlor mated pipe bursting of existing 8 inch asbestos cement waterline, replace with 8 inch HDPE DR 13.5 waterline. L.F. 1874 $95.00 $178,030.00 30 2 8 inch Gate Valves Ea. 6 $1,500.00 $9,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $187,030.00 30 rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: Greenslopes A/C Waterline Replacement Project - Phase 11 C.O. #1 Quantity Adjustment Data Page 3 of 3 Bid Item # Item Description Unit r Qty. Unit Price Amount $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 tontract Time Adjustment (Days) TOTALS: $0.00 0