Loading...
R-11-09-08-10D2 - 9/8/2011RESOLUTION NO. R -11-09-08-10D2 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Waeltz & Prete, Inc. for the Chandler Creek 1 (CC -1L) Lower Phase Wastewater Improvement Project, and WHEREAS, Waeltz & Prete, Inc. has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 1 with Waeltz & Prete, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 1 to the Contract with Waeltz & Prete, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of September, 2011. ATTEST: SARA L. WHITE, City Secretary O:\wdox\SCClnts\0112\ 110CMUNICIPAL 1600DOGrmc City of Round Rock, Texas c�rlo s T t t has , Mayor 7. -re -v).4 • [• EXHIBIT STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WAELTZ & PRETE, INC. ("Engineer") ADDRESS: 3000 Joe Maggio Blvd., #72, Round Rock, Texas 78665 PROJECT: Chandler Creek 1 (CC -1L) Lower Phase Wastewater Ianarovement This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Waeltz & Prete, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 4t1i day of March, 2011 for the Chandler Creek 1 (CC -1L) Lower Phase Wastewater Improvement Project in the amount of $18,153.23; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $58,797.00 to a total of $76,950.23; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. II. Article 2. Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $58,797.00 the lump sum amount payable under the Contract for a total of $76,950.23, as shown by the attached Addendum to Exhibit D. Supplemental Contract Rev. 12/01/08 0199.7161;230237 84275 \VwOI cc l low IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. WAELTZ & PRETE, INC. By: Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Alan McGraw, Mayor Stephan L. Sheets, City Attorney Date Supplemental Contract R0/.12(01/08 0199.7161;230237 84275 Ww•Olcc1low 2 ADDENDUM TO EXHIBIT A City Services The following services shall be provided by the City of Round Rock for this project at no cost to the consultant or their sub -consultants: 1. The City will assign a Project Manager that will serve as a point of contact for the consultant for the duration of the contract. The Project Manager will assist the consultant with: requests for information; processing of periodic pay requests; and, answering consultant inquiries as they pertain to the analysis, design and/or construction of the project. 2. The City will assist the consultant with "Right of Entry" (ROE) to properties, as required. 3. A valid and current Tax Exempt Resale Certificate issued from the City of Round Rock for the purchase of taxable land surveying services as a component of their deliverables. A copy of this certificate will be forwarded to Inland Geodetics, LP in lieu of incurring sales tax charges for the boundary surveying portion of this proposal. 4. The City will make available to the consultant all information held by the City that the City in its sole discretion believes is germane to the project and will assist the consultant in the provision of his services. The City will provide one copy of said information to the consultant in a format deemed appropriate in the City's sole discretion. However, the City is not obligated to perform extensive research of its files or archives, and the information supplied to the consultant will be limited to readily retrievable and easily copied as determined by the City in its sole discretion. ADDENDUM TO EXHIBIT B Engineering Services PHASE II: FINAL DESIGN, BIDDING, & CONSTRUCTION 1. PROJECT COORDINATION & MEETINGS: a. Coordinate and meet with the project Surveyor for items such as schedule, horizontal/vertical controls, set survey limits, coordination of easement documents, and identify survey deliverables. b. Coordinate and meet with the project Geotechnical Engineer for items such as schedule, boring locations, types of recommendations needed for the design work, and deliverables. c. Project coordination meetings with the City of Round Rock throughout the design process (Assumes 4 meetings: 30%, 60%, 90%, 100%). 2. CONSTRUCTION PLANS: Waeltz & Prete, Inc. shall prepare detailed construction plans and specifications for the project. The scope includes: a. City of Round Rock & TCEQ general Construction Notes and Project Specific Notes. b. Overall Project Utility Plan. c. Erosion, Sedimentation, Tree Protection Plan. d. Dimensional Control Plan. e. Plan & Profiles for the wastewater improvements. f. Traffic Control Plan & Details, if required. g. Construction Details, as required. h. Prepare plan submittals at 30%, 60%, 90%, and 100%. i. Revise "Engineer's Opinion of Probable Construction Cost" for each plan submittal. 3. STORM WATER POLLUTION PREVENTION PLAN (SWPPP): a. Prepare a SWPPP for the project. b. Assist City of Round Rock/Contractor in filing Construction Site Notice and/or NOI's, as required. 4. PERMIT PROCESSING: a. Process plans for approval through the City of Round Rock and other governmental authorities that have jurisdiction. (Includes 2 submittals, response to comments, and plan revisions, as required.) 5. BIDDING: a. Preparation of the City of Round Rock's standard contract documents and specifications. b. Issue addendums/clarifications, if required. c. Attend and preside over the pre-bid conference & bidding opening. d. Prepare bid tabulations and assist the City of Round Rock with the evaluation of bids and recommendation of the Contractor. 6. CONSTRUCTION PHASE: a. Attend and preside over the preconstruction meeting. b. Attend bimonthly project progress meetings (assumes 6 months construction). c. Assist with pay application reviews and recommendations. d. Review of submittals, shop drawings, and samples. e. Respond to RFI's, if required. f. Periodic site visits (Assumes 4 per month). g. Preparation of final punch list. h. Issue "Engineer's Concurrence Letter" at project completion. i. Preparation of "Record Drawings". Waeltz & Prete will make changes to plans based upon Contractor's "mark-ups". 7. TOPOGRAPHIC SURVEY: Topographic surveying services to be provided by Inland Geodetics, L.P. as a sub - consultant to Waeltz & Prete, Inc. a. The project Surveyor shall survey within the proposed limits of construction, as identified in the Feasibility Report. The field survey shall include; benchmark system at 1,000 foot intervals along the project route, edges of pavement, centerline, curb and gutter, drainage structures, ditches, hard surfacing, driveways, visible utilities, gas lines, signs, mailboxes, sidewalk, passing and no passing zones, metal beam guard fence (MBGF), gas lines, gas meters, manholes, trees above 8", and other general improvements. b. The Surveyor shall process the collected information into a 1 foot contour DTM file in ACAD. c. Preparation of 2 - Field Notes & Sketches for required permanent and temporary easements. Front end documents are to be provided by the City of Round Rock. Page 2 of 3 8. GEOTECHNICAL INVESTIGATION: Geotechnical services to be provided by Raba-Kistner Consultants, Inc. as a sub - consultant to Waeltz & Prete, Inc. a. The project Geotechnical Engineer's scope of service shall include soil borings, geotechnical analysis and report of findings within the project limits identified in the Feasibility Report. 9. REIMBURSABLE EXPENSES: a. All copying, purchases of maps and documents, tax certificates, deeds, plats, printing of reports and plans, mailing, courier, express/overnight and other related expenses shall be charged at cost. EXCLUSIONS >Conflict Resolution >Legal Lot Determinations >Off -Site Designs of Any Nature ➢Wastewater System Modeling ➢Geotechnical Construction Testing Lab Services Environmental Studies, except as specified >Construction Phase Services, except as specified (End of Scope) >Traffic Impact Analysis >Gas, Tele/Comm, Electrical Design ➢Construction Staking Subsurface Utility Engineering >Governmental Fees & Fiscal >Assembly and Recording of Legal Documents >Preparation & Processing of Waivers, Variances or Exceptions Page 3 of 3 ADDENDUM TO EXHIBIT C WORK SCHEDULE PHASE II: FINAL DESIGN, BIDDING, & CONSTRUCTION • Council Approval 08/25/11 • Notice to Proceed 08/26/11 • Topographic Survey 08/29/11-09/16/11 • Geotechnical investigation 08/29/11-09/16/11 • 30% Construction Plans 09/19/11-09/30/11 • 60% Construction Plans 10/03/11-10/14/11 • 90% Construction Plans 10/17/11-10/28/11 • 100% Construction Plans 10/31/11-11/11/11 • Easement Preparation 10/31/11-11/11/11 • Bidding 11/14/11-12/06/11 o Advertise 11/17/11 & 11/24/11 o Accept Bids 12/06/11 • Council Approval 12/15/11 • Notice of Award — Contractor 12/16/11 • Construction Phase 12/26/11-04/24/11 o NTP 12/26/11 o Substantial Completion 04/24/11 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page Exibit D - FEE SCHEDULE: Project: Chandler Creek 1 (CC -1L) Lower Phase Wastewater Improvements Engineering Services Fee: PE = Project Engineer PD = Project Designer Task Description EA = Engineering Assistant ECT = Engineer CAD Tech SCT = Senior CAD Tech AOM = Administrative PE PD EA SCT ECT ADM D.1 - Project Coord & Mtgs 22 0 0 8 0 0 D.2 - Construction Plans 62 0 • 0 136 0 0 D.3-SWPPP 18 0 0 0 0 0 0.4 - Permit Processing 8 0 0 16 0 0 D.5 - Bidding 55 0 0 0 0 0 0.6 - Construction Phase 64 0 0 6 0 0 Total Hours Salary Rate 1 Flour Labor Cost Per Staff Total Labor Cost: Sub Consultant Fees: 229 0 0 166 0 0 $135.00 $100.00 $90.00 $85.00 $70.00 $60.00 $30,915.00 $0.00 50.00 $14,110.00 $0.00 50.00 D.7 - Inland Geodelics ( Surveying) D.8 - Raba-Kistner, Inc. (Geotechnical) Reimbursable Expenses: D.9 - Copying and Reproduction 545,025.00 59,522.00 53,500.00 5750.00 TOTAL FEE FOR BASIC SERVICES $58,797.00 ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY Agenda Item No. 10D2. City Council Agenda Summary Sheet Agenda Caption: Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 1 with Waeltz & Prete, Inc. for the Chandler Creek 1 (CC -1L) Lower Phase Wastewater Improvement Project. Meeting Date: September 8, 2011 Department: Utilities and Environmental Services Staff Person making presentation: Michael Thane, P.E. Utilities Director Item Summary: The original contract for the Chandler Creek 1 (CC -1L) Lower Phase Wastewater Interceptor Project with Waeltz & Prete, Inc. was for professional services to provide the City of Round Rock a Preliminary Engineering Route Feasibility Study. These services included a horizontal and vertical in-situ survey of two possible routes, potential easement requirements, service area, and addressed floodplain and possible environmental issues. The contracted amount was for $18,153.23. The Preliminary Engineering Route Feasibility study also recommended the "best route" and probable construction cost. The City Utility Staff reviewed and concurs with the Waeltz & Prete recommended "best route", as presented in their Preliminary Engineering Route Feasibility Study for the Chandler Creek 1 (CC -1L) Lower Phase Wastewater Interceptor. Therefore, based on the results of the original contract, this Supplemental Contract No. 1 is for final design, bidding, and general construction administrative services for the Chandler Creek 1 (CC -1L) Lower Phase Wastewater Interceptor. This Supplemental Contract No. 1 is for $58,797.00, which increases the total contract amount with Waeltz and Prete, Inc. to $76,950.23. Cost: $58,797.00 Source of Funds: Self -Financed Wastewater Construction Date of Public Hearing (if required): N/A Recommended Action: Approval EXECUTED DOCUMENTS FOLLOW STATE OF TEXAS COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WAELTZ & PRETE, INC. ("Engineer") ADDRESS: 3000 Joe DiMaggio Blvd., #72. Round Rock, Texas 78665 PROJECT: Chandler Creek 1 (CC -1L) Lower Phase Wastewater Improvement This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Waeltz & Prete, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 4t1i day of March, 2011 for the Chandler Creek 1 (CC -1L) Lower Phase Wastewater Improvement Project in the amount of $18,153.23; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $58,797.00 to a total of $76,950.23; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. II. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $58,797.00 the lump sum amount payable under the Contract for a total of $76,950.23, as shown by the attached Addendum to Exhibit D. Supplemental Contract Rev,12/01/08 0199.7161;230237 84275 wwO I cc i low T--' 11 M' Oelj' 1002- IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. WAELTZ & PRETE, IN By: 4. . �AwI.,.;, A . iPrcie, P. t . Date CITY 02OUND ROrTh APP ' VED S T 1 FORM: Stepha \ . Sheets, City Attorney By: =r4 -r. ' s ►'l as ,Marr 71,= fA,,,, �► '`e' l I Date Supplemental Contract Rev12/01/08 0199.7161;230237 84275 wwOlccI low 2 ADDENDUM TO EXHIBIT A City Services The following services shall be provided by the City of Round Rock for this project at no cost to the consultant or their sub -consultants: 1. The City will assign a Project Manager that will serve as a point of contact for the consultant for the duration of the contract. The Project Manager will assist the consultant with: requests for information; processing of periodic pay requests; and, answering consultant inquiries as they pertain to the analysis, design and/or construction of the project. 2. The City will assist the consultant with "Right of Entry" (ROE) to properties, as required. 3. A valid and current Tax Exempt Resale Certificate issued from the City of Round Rock for the purchase of taxable land surveying services as a component of their deliverables. A copy of this certificate will be forwarded to Inland Geodetics, LP in lieu of incurring sales tax charges for the boundary surveying portion of this proposal. 4. The City will make available to the consultant all information held by the City that the City in its sole discretion believes is germane to the project and will assist the consultant in the provision of his services. The City will provide one copy of said information to the consultant in a format deemed appropriate in the City's sole discretion. However, the City is not obligated to perform extensive research of its files or archives, and the information supplied to the consultant will be limited to readily retrievable and easily copied as determined by the City in its sole discretion. ADDENDUM TO EXHIBIT B Engineering Services PHASE II: FINAL DESIGN, BIDDING, & CONSTRUCTION 1. PROJECT COORDINATION & MEETINGS: a. Coordinate and meet with the project Surveyor for items such as schedule, horizontal/vertical controls, set survey limits, coordination of easement documents, and identify survey deliverables. b. Coordinate and meet with the project Geotechnical Engineer for items such as schedule, boring locations, types of recommendations needed for the design work, and deliverables. c. Project coordination meetings with the City of Round Rock throughout the design process (Assumes 4 meetings: 30%, 60%, 90%, 100%). 2. CONSTRUCTION PLANS: Waeltz & Prete, Inc. shall prepare detailed construction plans and specifications for the project. The scope includes: a. City of Round Rock & TCEQ general Construction Notes and Project Specific Notes. b. Overall Project Utility Pian. c. Erosion, Sedimentation, Tree Protection Plan. d. Dimensional Control Plan. e. Plan & Profiles for the wastewater improvements. f. Traffic Control Plan & Details, if required. g. Construction Details, as required. h. Prepare plan submittals at 30%, 60%, 90%, and 100%. i. Revise "Engineer's Opinion of Probable Construction Cost" for each plan submittal. 3. STORM WATER POLLUTION PREVENTION PLAN (SWPPP): a. Prepare a SWPPP for the project. b. Assist City of Round Rock/Contractor in filing Construction Site Notice and/or NOI's, as required. 4. PERMIT PROCESSING: a. Process plans for approval through the City of Round Rock and other governmental authorities that have jurisdiction. (Includes 2 submittals, response to comments, and plan revisions, as required.) 5. BIDDING: a. Preparation of the City of Round Rock's standard contract documents and specifications. b. Issue addendums/clarifications, if required. c. Attend and preside over the pre-bid conference & bidding opening. d. Prepare bid tabulations and assist the City of Round Rock with the evaluation of bids and recommendation of the Contractor. 6. CONSTRUCTION PHASE: a. Attend and preside over the preconstruction meeting. b. Attend bimonthly project progress meetings (assumes 6 months construction). c. Assist with pay application reviews and recommendations. d. Review of submittals, shop drawings, and samples. e. Respond to RFI's, if required. f. Periodic site visits (Assumes 4 per month). g. Preparation of final punch list. h. Issue "Engineer's Concurrence Letter" at project completion. i. Preparation of "Record Drawings". Waeltz & Prete will make changes to plans based upon Contractor's "mark-ups". 7. TOPOGRAPHIC SURVEY: Topographic surveying services to be provided by Inland Geodetics, L.P. as a sub - consultant to Waeltz & Prete, Inc. a. The project Surveyor shall survey within the proposed limits of construction, as identified in the Feasibility Report. The field survey shall include; benchmark system at 1,000 foot intervals along the project route, edges of pavement, centerline, curb and gutter, drainage structures, ditches, hard surfacing, driveways, visible utilities, gas lines, signs, mailboxes, sidewalk, passing and no passing zones, metal beam guard fence (MBGF), gas lines, gas meters, manholes, trees above 8", and other general improvements. b. The Surveyor shall process the collected information into a 1 foot contour DTM file in ACAD. c. Preparation of 2 - Field Notes & Sketches for required permanent and temporary easements. Front end documents are to be provided by the City of Round Rock. Page 2 of 3 8. GEOTECHNICAL INVESTIGATION: Geotechnical services to be provided by Raba-Kistner Consultants, Inc. as a sub - consultant to Waeltz & Prete, Inc. a. The project Geotechnical Engineer's scope of service shall include soil borings, geotechnical analysis and report of findings within the project limits identified in the Feasibility Report. 9. REIMBURSABLE EXPENSES: a. All copying, purchases of maps and documents, tax certificates, deeds, plats, printing of reports and plans, mailing, courier, express/overnight and other related expenses shall be charged at cost. EXCLUSIONS >Conflict Resolution ➢Legal Lot Determinations >Off -Site Designs of Any Nature ➢Wastewater System Modeling >Geotechnical Construction Testing Lab Services ➢Environmental Studies, except as specified >Construction Phase Services, except as specified (End of Scope) ➢Traffic Impact Analysis ➢Gas, Tele/Comm, Electrical Design >Construction Staking ➢Subsurface Utility Engineering >Governmental Fees & Fiscal >Assembly and Recording of Legal Documents Preparation & Processing of Waivers, Variances or Exceptions Page 3 of 3 ADDENDUM TO EXHIBIT C WORK SCHEDULE PHASE II: FINAL DESIGN, BIDDING, & CONSTRUCTION • Council Approval 08/25/11 • Notice to Proceed 08/26/11 • Topographic Survey 08/29/11-09/16/11 • Geotechnical Investigation 08/29/11-09/16/11 • 30% Construction Plans 09/19/11-09/30/11 • 60% Construction Plans 10/03/11-10/14/11 • 90% Construction Plans 10/17/11-10/28/11 • 100% Construction Plans 10/31/11-11/11/11 • Easement Preparation 10/31/11-11/11/11 • Bidding 11/14/11-12/06/11 o Advertise 11/17/11 & 11/24/11 o Accept Bids 12/06/11 • Council Approval 12/15/11 • Notice of Award — Contractor 12/16/11 • Construction Phase 12/26/11-04/24/11 o NTP 12/26/11 o Substantial Completion 04/24/11 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page Exibit D - FEE SCHEDULE: Project: Chandler Creek 1 (CC -1L) Lower Phase Wastewater Improvements Engineering Services Fee: PE = Project Engineer PD = Project Designer Task Description EA = Engineering Assistant ECT = Engineer CAD Tech SCT = Senior CAD Tech ADM = Administrative PE PD EA SCT ECT ADM D.1 - Project Coord & Mtqs 22 0 0 8 0 0 D.2 - Construction Plans 62 0 0 136 0 0 D.3 - SWPPP 18 0 0 0 0 0 D.4 - Permit Processing 8 0 0 16 0 0 0.5 - Bidding 55 0 0 0 0 0 0.6 - Construction Phase 64 0 0 6 0 0 Total Hours Salary Rate / Hour Labor Cost Per Staff Total Labor Cost: Sub Consultant Fees: 229 0 0 166 0 0 $135.00 $100.00 690.00 $85.00 $70.00 $60.00 $30,915.00 $0.00 $0.00 $14,110.00 50.00 $0.00 D.7 - Inland Geodetics ( Surveying) D.8 - Raba-Kistner, Inc. (Geotechnical) Reimbursable Expenses: D.9 - Copying and Reproduction $45,026.00 89,522.00 $3,500.00 $750.00 TOTAL FEE FOR BASIC SERVICES $58,797.00