Loading...
R-11-09-08-10F3 - 9/8/2011RESOLUTION NO. R -11-09-08-10F3 WHEREAS, the City of Round Rock has duly advertised for bids for the Somerset Park Development Project, and WHEREAS, Fazzone Construction, Inc. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Fazzone Construction, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Fazzone Construction, Inc. for the Somerset Park Development Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of September, 2011. ATTEST: SARA L. WHITE, City Secretary O:\wdox\SCClnis\0112\ 1104\MUNICIPAL\0023I593.DOC/rmc AbAliPAGGRAW,Mayar City of Round Rock, Texas CaAciets T. Crtit vias 114 -)117r -P' -Te.M 'ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY City Council Agenda Summary Sheet Agenda Item No. 10F3. Consider a resolution authorizing the Mayor to execute a contract with Fazzone Agenda Caption: Construction, Inc. for the Somerset Park Development Project. Meeting Date: September 8, 2011 Department: Parks and Recreations Staff Person making presentation: Rick Atkins Parks and Recreation Director Item Summary: Somerset Park Development Project includes the demolition of existing park amenities and construction of a new playground, walking trail, basketball court and park pavilion. This project will also include picnic tables, grills, park benches and trash receptacles. This project was identified in Year 1 of the PARD Repair and Replacement Program. It also aligns with the Game Plan 2020: Parks and Recreation Master Plan and the City Strategic Goals under Places and Spaces. Cost: $168,638.06 Source of Funds: Parks Improvement & Acquisition Fund Date of Public Hearing (if required): N/A Recommended Action: Approval • bidtab/bidtab THE CITY OF ROUND ROCK PARKS & RECREATION DEPARTMENT BIDS EXTENDED AND CHECKED 301 West Bagdad BY : AFD Round Rock, Texas. 78664 DATE : 8/16/2011 (512) 218-5540 BID TABULATION SHEET OF 1 OF 1 FAZZONE WESTAR PATIN Bid Bond? Y Bid Bond? Y Bid Bond? Y Bid Bond? COST 888888888888888 c500000000000000 69 64 69 64 69 69 69 69 69 64 64 69 69 69 69 S 0 64 S 0 64 S 0 ER w , UNIT PRICE 888$$8880088888 669 9696466460960460960964609609609609609 69 UNIT PRICE COST 8 8 888 N bop 8 0 8 0 rr 64 $2,324.00 O 000 O O ON O N N O 8 `O 69 8 W 64 8 0000800 Vtfl 7 69p 8 696964 8 p S pp 8 00 .6. 6699p 8 6M9 $142,404.00 O ado 0 r 6969 O 0 VM1 S S r` Uri S O ef el 8.1p0 O 641 O 0 069 " 69 p 0 8 64696 p69 0 0 8 0 Ny 0O Na 8 0Na 8 6�41n O0 11666444 pp 0 0 69646469 0 0 .i 0 8 v5 0 0 M UNIT PRICEPRICE COST a88g8888$ 888 Vls.- r 69 0C 69 � .. 69 °�,8q,g888&0 N N 69 Ei o0 69 7 V1 6 64 88888 4.r} N. 69 tri 6469 -7 M 64 8 00 N Ch ER 88 88 M vD 69 V m 69 S s r` Ch 6R a 0 O� ti 64 O 888669'0 V'1 66966969 8 N O ^. N p 8 N p O CS X06469 64 p Op O - 69 8 W 8��MO oo ,- Iv1 69 Y� 0 64 O 0000 N7 64696 O p O NN 69M9 O 6 UNIT PRICE I COST 8882tnO�N-•1086086 . v.c1 696 . N . SOD SER .p M p0o0 �.. �0 N- 69 N 69 En: ER .. ND N YppHpp p 761 ��669 . r 000 p 8. V1- ER 604 - O 000 0- cV6M sti a N so O . pAp / ER 800 v�1 7 45 69 pp N N l� N 69 10569'0 T 69 V M 00 64 OrO N 64 06 00 69 �cV 74: 64 V - - 64 6006 rrj 69 6 r .5 69 88N 8 7\ 69 N N In --. 00 6r 4 o00.-6+ O- N 64 'V 60 69 APPR31 O ITEM I UNIT QTY. .-..-..r N - ^. -. pp 10 N N M T O �N k+1 N .-r .-..-. vi a COP ,. 4fz;Qdviiu; w a F4 t4 .-i ri ra ti'Q'vi ri ui w i2i)-S ..,! ui ;moi 11- Mobilization 12- Unclassified Excavation, subgrade prep g c Al h U 7) c 0 15- Temp. Conc. Washout area 6- curb inlet protection I7- Demoliton per plan 8- Concrete sandbox curb 19 -Concrete playcurb 10- concrete tlatwork sc . pvc s eeve 13- playground entry ramp = 15- picnic area 'Somerset Add/Alternate Items F z U F n A-2- Park pavilion (Total Somerset Park Add/Alternate Bid TOTAL BASE BID W. ADD/ALT. : bidtab/bidtab