Loading...
CM-2018-1619 - 1/26/2018aouuoaau+ rev, 01 16 Department: Project Name: City Project ID Number Vendor 3 ustification Paget oft Contract Quantity Adjustment/Change Order 23000 Play for All Abilities Expansion Fence Project _ Date: 11/30/17 Change Order/Quantity Adjustment No. 1 Swift Corporation 3585 Rocking J Rd. 512-470-7575 Company Name Address Phone No. adjustments In the field made to the park plan required changes to the fence plan Including: installation of (4) additional gates, relocation of (1) existing gate, relocation of —100 linear feet of 4' tall fence, and installation of -75 linear feet of 6' tall fence, SUMMARY Amount % Change Original Contract Price: $48,426.10 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): $48,426,10 Previous Change Order(s): $0.00 0% This Change Order: $6,710.00 14% Total Change Order(s) To Date: $6,710.00 19% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $55,636.10 Difference between Original and Adjusted Contract Prices: $6,710.00 Original Contract Time: 45 days Time Adjustment by previous Quan. Adj./Change Order_ N/A Time Adjustment by this Quan, Adj./Change Order: none New Contract Time- 45 days Submitted for Approval Prepared BY: _T9NTk==Katie Baker, Park Development Manager,City of Round Rock 11/30/17 Signature Printed Name, Title, Company Date Approvalls Contractor. Mario Vasquez, CEO, Swift Corp 12/16/17 Signature Printed Name, Title, Company Date City Project Manager. QacJti.1 Morris 1 S - ak t2 2t7 ti"f Signature Manager/City -� �� Printed Name, Title Px0tK5 6M rt -4. �' xT.C�(•7 L! DateMayor / + cm'. 2t7 / 7 City of Round Rock ROUN{ TEXAS oac Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Swift Corporation for the Play for All Abilities Expansion Fence Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 1/26/2018 Dept Director: Rick Atkins, Director Cost: $6,710.00 Indexes: General Self -Financed Construction Attachments: LAF - Change Order #1 - Swift Corporation (PARD).pdf, Change Order Swift (signed).pdf Department: Parks and Recreation Department Text of Legislative File CM -2018-1619 Consider executing Quantity Adjustment/Change Order No. 1 with Swift Corporation for the Play for All Abilities Expansion Fence Project. Adjustments in the field made to the park plan required changes to the fence plan including: installation of (4) additional gates, relocation of (1) existing gate, relocation of --100 linear feet of 4' tall fence, and installation of --75 linear feet of 6' tall fence. This Change Order netted a $6,710.00. The overall Play for All Expansion Project included: additional parking, lighting, realigning the entry drive, the addition of three (3) new play pods, and expansion the five (5) existing play pods. Additional perimeter fencing was necessary to make these additions to the park safe. The Play for All Expansion Project is a joint collaboration between the City and the Play for All Foundation. The Foundation raised over $500,000 to help fund the project. Cosh $6,710.00 Source of Funds: General Self -Financed Construction Cityof Round Rock Page i PNnted on InFU2018