R-11-11-22-10C1 - 11/22/2011RESOLUTION NO. R-11-11-22-1OC1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with SKE Construction, LLC for the Greenslopes A/C Waterline Replacement Project — Phase II, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity AdjustmentlChange Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with SKE Construction, LLC for the Greenslopes A/C Waterline Replacement Project — Phase II, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of November, 2011. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Secretary O:\wdox\SCClnts\O1 12\ 1104\MUNICIPAL\00237696.DOC/rmc Iev, 06111 Department: Utilities & Environmental Services Contract Quantity Adjustment/Change Order Project Name: Greenslopes A/C Waterline Replacement Project - Phase II clty Project ID Number WLO2ASB2009 3ustification Date: Page 1 of 4 10/20/2011 Change Order/Quantity Adjustment No. QA #2 Quantity Adjustment No. 1 for the Greenslopes A/C Waterline Replacement Project is necessary due to unforseen drcumstanoes identified during construt*ion activities. The following bid item quantities were increased: pipe length, meter boxes, gate valves, corporation and curb stops, and concrete sidewaik and driveway repairs. The following blj Items were decreased: polyethelene water service tubing, fire hydrants, and wastewater deanout accemhlies The tntal nuantty adiuctment of t105 Rtfi fln raises the contract tntal fmm t1 M06 71R QA to t1 117 534 Q0. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustrnent(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)j: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: City Staff: Company NEime: —For Con For City of Round Rods: Signature Amount % Change $819,688.90 $0.00 $105,816.00 $105 816.00 $925,504.90 $187,030.00 $0.00 $187,030.00 20.21% 0.00% 20.21% $1,112,534.90 $292,846.00 180 Calendar Days 30 Calendar Days 0 Calendar Days 210 Michael Thane P.E., Director of Utilities Printed Name, Title Calendar Days Shelly A. Eberhart President/CEO Printed Name, Tide 10/27/2011 Date Signature Printed Name, Tide Date Date I.v. ow11 Project Name: Quan. Adj./Change Order No.: Contract Quantity Adjustment/Change Order Greenslopes A/C Waterline Replacement Project - Phase II QA #2 Change Order Data Page 2 of 4 .n.. Item # Item Desai. . . n Unit •U . Unit Price Amount $0.00 Time Adjustment Da $0.00 $0.00 *00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 *00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 .00 TOTAILS: SO.00 0 Project Name: Quan. Adj./Change Order No.: Contract Quantity Adjustment/Change Order Greenslopes NC Waterline Replacement Project - Phase II QA #2 uantity Adiustment Data Page 3 of 4 Bid Item # 2 Item Desalt. • on Coordinate & perform location and marking of all buried existing utilities not owned & maintainedby the City of Round Rods prior to commenting work (example: buried cables, fiber optics, gas lines, etc) Perform pre-cMorinated pipe bursting of existing 8" asbestos cement water line, replace with 8" HDPE DR 13.5 water line, complete, induding excavations, baddtll, installation of new service lines for use with existing corporation stop, hydrostatic pressure testing, post -bursting dosed dcuit tv inspection of all sanitary sewer service lines as described in 011100 Technical Spedfications Pipe Bursting of Potable Water Mains, Section 04-05, Inspection of Sanitary Sewer Lines of the plans & spedfications, construction staking, if required by Contractor, repairs & replacement of any and all damaged asphalt and base material, concrete driveways, concrete sidewalks, concrete curbing, storm water curb inlets, mailboxes, fendng, landscaping, revegation & other existing items Unit LF •y . 467 Unit Price $73.00 Amount $34,091.00 Time Adjustment Da 4 Remove & replace existing 8" in-line gate valve with Clow, or approved equal EA 20 $1,500.00 $30,000.00 7 Fumish & install 1 1/2" Ford, or approved equal, brass corporation stop, per plans & specs EA 8 $500.00 $4,000.00 9 Fumish & install 1 1/2" polyethylene water service tubing, per plans & specs EA -150 $12.00 -$1,800.00 10 Fumtsh & install 1" polyethylene water service tubing, per plans & specs EA -500 $5.00 -$2,500.00 11 Fumish & install 1 1/2" loddng brass angle meter or curb stop and U -Branch, per plans & specs EA -5 $500.00 -$2,500.00 12 Fumish & install 1" Ford, or approved equal, locking brass angle meter or curb stop, per plans & specs EA 70 $350.00 $24,500.00 13 Fumish & install 3/4" bronze non -rising stem gate valve, box & IId (property owners cut-off valve assembly outside meter box) EA -15 $150.00 -$2,250.00 14 Install plastic double meter box EA 38 $300.00 $11,400.00 15 Install plastic single meter box EA -2 $200.00 -$400.00 16 Fumish & Install 8"x6" ductile iron Clow fire hydrant, or approved equal, induding lead & FH vlave EA -3 $4,500.00 -$13,500.00 17 Fumish & install 8'x6" ductile iron flre hydrant tee EA -1 $1,000.00 -$1,000.00 18 Fumish & install 6" ductile iron pipe flre hydrant lead EA -1 $1,500.00 -$1,500.00 19 Piping Fumish & install cast iron adjustable valve box with Id & concrete collar EA -1 $500.00 -$500.00 20 Fumtsh & Install 6" SDR 26 PVC sewer pipingLF -178 $5.00 -$890.00 21 Fumish & install 6" wastewater dean -out assembly non -paved surface) EA -3 $500.00 -$1,500.00 Contract Quantity Adjustment/Change Order rev, 06/11 Page 4 of 4 22 Perform concrete sidewalk or concrete driveway repairs. Repairs should be performed in sMct accordance with City standards SF 1355 $15.00 $20,325.00 23 Perform Type "C' hot ma asphaltic cement (HMAC) road repair using approved mechanized HMAC layout machinery TON 82 $120.00 $9,840.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1.00 TOTALS: $105,816.00 0 City Council Agenda Summary Sheet Agenda Item No. 10C1. Agenda Caption: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 2 with SKE Construction, LLC for the Greenslopes A/C Waterline Replacement Project — Phase II. Meeting Date: November 22, 2011 Department: Utilities and Environmental Services Staff Person making presentation: Michael Thane, P.E. Utilities Director Item Summary: This project continued the City's asbestos -cement A/C pipe replacement program that began November 2007 and is the second phase For the Greenslopes area. This second phase included the replacement of 8,475 feet of eight inch A/C waterlines in the Greenslopes subdivision. This program will continue annually throughout the City to replace A/C waterline pipe as necessary. On August 25, 2011, Change Order No. 1 was approved and was for replacement of an additional 1,874 feet of eight -inch A/C waterline on Greenlawn Blvd. which raised the original contract of $819,688.90 by $187.030.00 for a total of $1,006,718.90. This Quantity Adjustment No. 2 for the Greenslopes A/C Waterline Replacement Project is necessary due to unforeseen circumstances identified during construction activities. The following bid item quantities were increased: pipe length, meter boxes, gate valves, corporation and curb stops, and concrete sidewalk and driveway repairs. The following bid items were decreased: polyethylene water service tubing, fire hydrants, and wastewater clean-out assemblies. The total quantity adjustment of $105,816.00 raises the contract total from $1,006,718.90 to $1,112,534.90. Cost: $105,816.00 Source of Funds: Self -Financed Water Construction Date of Public Hearing (if required): N/A Recommended Action: Approval EXECUTED DOCUMENTS FOLLOW Contract Quantity Adjustment/Change Order rev, OWii Department: Utilities & Environmental Services Projed Name: Greenslopes A/C Waterline Replacement Project - Phase II City Project ID Number WL02ASB2009 justification Page 1 of 4 Date: 10/20/2011 Change Order/Quantity Adjustment No. QA #2 Quantity Adjustment No. 1 for the Greensiopes A/C Waterline Replacement Project is necessary due to unforseen drcumstanoes identified during construction activities. The following bld item quantities were increased: pipe length, meter boxes, gate valves, corporation and curb stops, and concrete sidewalk and driveway repairs. The following bid Items were decreased: polyethelene water service tubing, fire hydrants, and wastewater deanout a mhHPc Th P tntal niiantlty adiuctmpnt of 1105 R16 flfl raids the mntrart tntal frnm tt 006 71R qfl to t1 117 534 q0 SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Amount % Change $819,688.90 $0.00 $105,816.00 $105 816.00 $925,504.90 $187,030.00 $0.00 $187 030.00 20.21% 0.00% 20.21% $292,846.00 180 Calendar Days 30 Calendar Days 0 Calendar Days 210 Calendar Days City Staff: ( L- / ti Michael Thane P.E., Director of Utilities 10/27/2011 Sig •ture Printed Name, Title Date For Con PrI Sz factor Company Name: Shelly A. Eberhart President/CEO For City of Sig/ rn v Panted Name, Title Date Date Round Rock: Signature Printed ame, TitlJ t Date rev, 06/11 Project Name: Quan. Adj./Change Order No.: Contract Quantity Adjustment/Change Order Greenslopes A/C Waterline Replacement Project - Phase II QA #2 Chanae Order Data Page 2 of 4 Item # Item Descri • on Unit •� . Unit Price Amount $0.00 Time Adjustment Da $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 TOTALS: $0.00 0 rev, 06111 Project Name: Quan. Adj./Change Order No.: Contract Quantity Adjustment/Change Order Greenslopes A/C Waterline Replacement Project - Phase II QA #2 uantity Adlustment Data Page 3 of 4 Bid Item # 2 Item Descri • on Coordinate & perform location and marking of all buried existing utilities not owned & maintainedby the City of Round Rods prior to commendng work (example: buried cables, fiber optics, gas lines, etc) Perform pre -chlorinated pipe bursting of existing 8" asbestos cement water line, replace with 8" HDPE DR 13.5 water line, complete, including excavations, backfill, installation of new service lines for use with existing corporation stop, hydrostatic pressure testing, post -bursting closed cicuit tv inspection of all sanitary sewer service lines as described in 011100 Technical Spedfications Pipe Bursting of Potable Water Mains, Section 0405, Inspection of Sanitary Sewer Lines of the plans & specifications, construction staking, if required by Contractor, repairs & replacement of any and all damaged asphalt and base material, concrete driveways, concrete sidewalks, concrete curbing, storm water curb inlets, mailboxes, fendng, landscaping, revegation & other existing items Unit LF •y . 467 Unit Price $73.00 Amount $34,091.00 Time Adjustment Da 4 Remove & replace existing 8" in-line gate valve with Clow, or approved equal EA 20 $1,500.00 $30,000.00 7 Fumish & install 1 1/2" Ford, or approved equal, brass corporation stop, per plans & specs EA 8 $500.00 $4,000.00 9 Fumish & install 1 1/2" polyethylene water service tubing, per plans & specs EA -150 $12.00 -$1,800.00 10 Furnish & install 1" polyethylene water service tubing, per plans & specs EA -500 $5.00 -$2,500.00 11 Fumish & install 1 1/2" locking brass angle meter or curb stop and U -Branch, per plans & specs EA -5 $500.00 -$2,500.00 12 Furnish & install 1" Ford, or approved equal locking brass angle meter or curb stop, per plans & specs EA 70 $350.00 $24,500.00 13 Furnish & install 3/4" bronze non -rising stem gate valve, box & lid (property owner's cut-off valve assembly outside meter box) EA -15 $150.00 -$2,250.00 14 Install plastic double meter box EA 38 $300.00 $11,400.00 15 instaII pIastic single meter box EA -2 $200.00 -$400.00 16 Fumish & install 8' x6" ductile iron Clow fire hydrant, or approved equal, including lead & FH vlave EA -3 $4,500.00 -$13,500.00 17 Fumish & install 8"x6" ductile iron fire hydrant tee EA -1 $1,000.00 -$1,000.00 18 Fumish & install 6" ductile iron pipe fire hydrant lead piping EA -1 $1,500.00 -$1,500.00 19 Fumish & install cast iron adjustable valve box with lid & concrete collar EA -1 $500.00 -$500.00 20 Furnish & install 6" SDR 26 PVC sewer piping LF -178 $5.00 -$890.00 21 Furnish & lnstall 6" wastewater clean-out assembly (non -paved surface) EA -3 $500.00 -$1,500.00 Contract Quantity Adjustment/Change Order ---r rev, 06/11 Page 4 of 4 22 Perform concrete sidewalk or concrete driveway repairs. Repairs should be performed in strict accordance with City standards SF 1355 $15.00 $20,325.00 23 Perform Type "C" hot mix asphaltic cement (HMAC) road repair using approved mechanized HMAC layout machinery TON 82 $120.00 $9,840.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 TOTALS: ;105,816.00 0