Loading...
R-11-12-15-11A2 - 12/15/2011 RESOLUTION NO. R-11-12-15-11A2 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with Cash Construction for the Southwest Downtown Infrastructure Improvements (Main Street) Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 3,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 3 to the Contract with Cash Construction for the Southwest Downtown Infrastructure Improvements (Main Street) Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A"and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. RESOLVED this 15th day of December, 2011. / r ! ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: . �4� . ft&k SARA L. WHITE, City Secretary O:\wdox\SCCluts\0112\1 104MUNICIPAU00239071DOC/mc EXH IBIT IT Page 1 of Contract Quantity Adjustment/Change Order MV,06/11 Department: Transportation Project Southwest Downtown District Infrastructure Improvements(Main St.) Name: Date: 11/17/2011 City Project Change Order/Quantity Adjustment ID Number TX02AREA No. 3 Justification Quantity Adjustment/Change Order No. 3 is required to complete the Blair Street underground utilities. There were conditions found after construction began that required additoinal water and wastewater line to be replaced. This quantity adjustment/change order is also required for additonal surface street scape items. SUMMARY Amount %Change Original Contract Price: :($16,970.00) ,202.00 Previous Quantity Adjustment(s):This Quantity Adjustment: $0.00Total Quantity Adjustment(s): 970.00)Total Contract Price with Quantity Adjustment(s): 232.00 Previous Change Order(s): $543,078.10 17.11% This Change Order: $150,203.90 4.73% Total Change Order(s)To Date: $693,282.00 21.84% Adjusted Contract Price (Original Contract Price Plus „ Quantity Adjustnent(s)Plus Change Order(s)]: $3,867,514.00 Difference between Original and Adjusted Contract Prices: $676,312.00 Original Contract Time: 270 Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 74 Calendar Days Time Adjustment by this Quan.Adj./Change Order: 45 Calendar Days New Contract Time: 389 Calendar Days Prepared By: Todd Ke en PW Operations Manager,CORR Printed Name,Title Date Printed ConbCx Company Name: Cash Construction For Contractor: Q(L�� B.I Cash, Project Manager l l -z*111 Sig tore Printed Name,Title Date For City of Round Rods: Alan McGraw,Mayor,City of Round Rods Signature Printed Name,Title Date Page 2 of 4 Contract Quantity Adjustment/Change Order rev,06/11 Project Name: Southwest Downtown District Infrastructure Improvements(Main St.) Quan.Adj./Change Order No.: 3 Change Order Data contract Time Adjustment Item# Item Description Unit Unit Price Amount (Days) Harris Street treat cavation,compete in p ace 115 (plan quantity) CY 507.8125 $16.00 $8,125:00 emove P.L.Concrete Curb and Gutter and Disposal,complete in place per 116 lineal foot LF 1 168.75 $4.00 $675.00 emove P.C.Concrete SidewaWand Driveway and Disposal,complete in 117 place per square foot SF 341.076923 $1.30 $443.40 Trench ety Plan and Trench 118 (all depths) LF 0 $1.00 $0.00 econstructConcrete Sidewalk to 4 119 thickness SF 33.3333333 $6.00 $200.00 120 HMAC 2"Type D SY 442 $8.00 $3,536.00 121 10.5"HMAC Type B SY 462.875 $40.00 $18,515.00 122 Sidewalk Concrete Pavin Unit(2-3/8") SF 3066.8 $5.00 $15,334.00 123 Sidewalk Ramp Concrete Pavin Unit SF 25.7142857 $7.00 $180.00 124 P.0 Concrete Driveway SF 257.4 $5.00 $1,287.00 125 P.C.Concrete Curb&Gutter LF 1 164.75 $16.00 $2,636.00 126 P.C.Concrete Valley Gutter SF 45 $10.00 $450.00 127 P.C.Concrete Retainer Curb Type A LF 80 $13.00 $1040.00 128 Filter Inlet Protection EA 0.64285714 $70.00 $45.00 Traffic Signs 4 top u ing 129 WAY,4 WAY,TWO WAY Left Turn EA 0.17142857 $350.00 $60.00 Reflectorized Type I ThermopliEE­ 130 Pavement Markings 4"Width LF 190 $2.00 $380.00 Reflectorized Type I Thermoplastic 131 Pavement Markings 24"Width LF 3.75 $6.00 $22.50 Reflectorized I ype I Thermoplaffc- Pavement Markings Wheel Chair 132 Symbol EA 1 0.2 $200.00 $40.00 a nicap Ramp to Structure each 133 wide and 20'long LF 7.5 $80.00 $600.00 134 Soddi2oSY 36.25 $4.00 $145.00 Type A survey Markers w' Justa 135 Valve Box EA 0.16666667 $300.00 $50.00 136 E2-Duct Bank LF 112.045455 $220.00 24 650.00 Coordination of Gas InstaFation- 137 Atmos LS 0 2000.00 $0.00 138 Street Ught Including Foundation EA 0 $6,000 00 $0.00 139 1"Dia Sch 80 PVC Street Light Conduit I LF 0 $17.001 $0.00 TOTALS• 78 13.90 1 0 Page 3 of 4 Contract Quantity Adjustment/Change Order rev,06/11 Project Name: Southwest Downtown District Infrastructure Improvements(Main St.) Quan.Adj./Change Order No.: 3 Change Order Data ntral Time Adjustment Bid Item# Item Description Unit Unit Price ' Amount (Days) 140 2"Dia Sch 80 PVC Street Light Conduit LF 0 $35.00 $0.00 12OV,20A ece e with Single 141 Gand Bads Box EA 0 $400.00 $0.00 142 Electrical Pull Box EA 0 $2,500.00 $0.00 143 Street Lighting Electric Wiring LS 0 $8,250.00 $0.00 144 4"Sch 40 PVC irrigation sleeve LF 0 $20.00 $0.00 145 Sch 40 PVC Irrigation Une LS -0.09090909 $9,900.00 $900.00 146 2"Water Meter EA 0 $2,000.00 $0.00 147 2"Baddlow Preventer EA 0 $3,000.00 $0.00 148 2"Gatevalve EA 0 $500.00 $0.00 Irrigation Valves with Battery Operated 149 Solenoid EA 0 $2 000.00 $0.00 150 Tree Bubblers,including 4'of flex pipe EA 0 $200.00 $0.00 Installation of Tr-ee-We@6/ith Tree 151 Grate EA 0 $4,000.00 $0.00 152 Installation of Tree Well EA 0 $4,000.00 $0.00 153 5'Curb Inlet EA 0 $2,200.00 $0.00 Inlet EA 0 $3,200.00 $0.00 155 3 Area Inlet EA 4 $1,800.00 $7,200.00 156 PVC, 12"dia LF 5.3846 $65.00 $350.00 157 RCP 18"Dia, LF 16.666666 $90.00 $1500.00 158 10"x18'Trench Drain Type B EA 0.342857 $14,000.00 $4,800.00 159 4'Standard Drainage Manhole EA 1 $5,500.00 $5,500.00 160 12"Pipe(PVC AWWA C-900 Class 200) LF 206.25 $80.00 $16,500.00 161 1-1/2"Service Line LF 0.375 $40.00 $15.001 162 Fire Hydrant Assembly EA 0.6666666 $3,000.00 $2,000.001 163 6"Ta 'ng Sleeve and Valve I EA 5.94444444 $900.00 $5,350.001 164 iz-Gate ave EA 1 $2,000.00 $2,000.00 TOTALS: 315.00 0 Page 4 of 4 Contract Quantity Adjustment/Change Order 12v,06/11 Project Name: Southwest Downtown District Infrastructure Quan.Adj./Change Order No.: 3 Change Order Data Contract Time Adjustment Bid Item# Item Description Unit Unit Price Amount (Days) 165 12"x12"Tapping Sleeve&Valve EA 0.42857143 $7,000.00 $3,000.00 166 Ductile Iron Fittings 4"through 24" TON 0 $10,000.00 $0.00 167 Single water Service Conection EA 0.5 $2,000.00 $1,600.00 168 Barricades,Signs,Traffic Handling Day 12 $40.00 $0,00 Misc items $0,00 169 Additional Rock Walls Ton 26 $400.00 $10,400.00 10 Removed ana-Re—pra-cR-Sprinklers at 170 310 W Main LS 1 $320.00 $320.00 Removed anIle-placed A amp at 171 310 W Main LS 1 $1230.00 $1,230.00 Removed mp of the red oaRTrm— and planted a new tree at 409 W Main 172 St. LS 1 $500.00 $500.00 Removed and temporarilyreplaeced wood fience at Garcia's Restaurant and 173 removed 4'wide concrete slab LS 1 $350.00 $350.00 Moved sign and installed rock wall 174 around planter box at 308 W Main St. LS 1 $215.00 $215.00 1 Removed esiting fire hydrant at 211 W Maint St.and Replaced with 3'Bury hydrant to match grade of pavers LS 1 $4,000.00 $4,000.00 2 175 12"x8"Wet Connection EA 2 $3,250. 500.00 Oveday Items 176 1"Type D Overlay Blair Street SY 2528 $7.50 $18,960.00 7a Trench Repair Deduct Blair St. SY -475 $40.00 ($19,000.00) 0.00 Delays due to Gas 0.00 32 TOTALS.t:::: 475.00 4S4 '` ROUND 0CCK MAS City Council Agenda Summary Sheet PURPOSE.PASS(OK PROSPMn Agenda Item No. 11A2. Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order no. 3 with Cash Construction for the Southwest Downtown District Infrastructure Agenda Caption: Improvements(Main Street) Project. Meeting Date: December 15,2011 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: The City Council awarded the Southwest Downtown Infrastructure Improvements (Main Street) Project to Cash Construction on October 18, 2010 for $3,191,202 to reconstruct Main Street from San Saba Street to Blair Street. Main Street will be rebuilt to match the previous Southwest Downtown Projects. This project includes the installation of storm water, water, wastewater and a duct bank for dry utilities. Also included is the installation of pedestrian facilities, paver sidewalks and other street scape items matching our Downtown Master Plan. Quantity Adjustment/Change Order No. 1 was approved by the City Council on June 9, 2011 at a cost of$111,982 for additional linear footage in the duct bank, additional excavation to complete the duct bank, removal of wastewater line and a 15" pecan tree, and the construction of a headwall at Lake Creek. Quantity Adjustment/Change Order No. 2 was approved by the City Council June 23, 2011 at a cost of$431,096.10 to complete construction of the 200 block of Harris Street and to complete a 12"water main and connection to Liberty Street. Quantity Adjustment/Change Order No. 3 at a cost of$150,203.90 is required to complete the underground utilities on Blair Street and to fund additional surface scape street items. The revised total cost of the construction contract with Cash Construction would be$3,867,514. Cost: $150,203.90 Source of Funds: Round Rock Transportation System Development Corporation Date of Public Hearing(if required): N/A Recommended Action: Approval EXECUTED DOCUMENTS FOLLOW Page 1 of 4 Contract Quantity Adjustment/Change Order rev,06/11 Department: Transportation Project Southwest Downtown District Infrastructure Improvements(Main St.) Name: Date: 11/17/2011 City Project Change Order/Quantity Adjustment ID Number TX02AREA No. 3 Justification Quantity Adjustment/Change Order No. 3 is required to complete the Blair Street underground utilities. There were conditions found after construction began that required additoinal water and wastewater line to be replaced. This quantity adjustment/change order is also required for additonal surface street scape items. SUMMARY Amount %Change Original Contract Price: :($16,970.00) 1,202.00 Previous Quantity Adjustment(s): ,970.00) This Quantity Adjustment: $0.00 Total Quantity Adjustment(s):Total Contract Price with Quantity Adjustment(s): ,232.00 Previous Change Order(s): $543,078.10 17.11% This Change Order: $150,203.90 4.73% Total Change Order(s)To Date: $693,282.00 21.84% Adjusted Contract Price [Original Contract Price Plus - Quantity Adjustment(s)Plus Change Order(s)): $3,867,514.00 Difference between Original and Adjusted Contract Prices: $676,312.00 Original Contract Time: 270 Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 74 Calendar Days Time Adjustment by this Quan.Adj./Change Order: 45 Calendar Days New Contract Time: 389 Calendar Days Prepared By: Todd Kelt en PW Operations Manager,CORR Sigdture Printed Name,Title Date Printed Contractor Company Name: Cash Construction For Contractor. B.J.Cash Project Manager 17-1111 Si re Printed Name,Title Date For City of Round Rods: Alan McGraw Mayor,City of Round Rock gnature Printed Name,Title Date R t�- t Z-- t5- l(Al- Page 2 of 4 Contract Quantity Adjustment/Change Order rev,06/11 Project Name: Southwest Downtown District Infrastructure Improvements(Main St.) Quan.Adj./Change Order No.: 3 Change Order Data contract Time Adjustment Item# Item Description Unit QW. Unit Price Amount Days) Harris Street Street Excavation,compete in place 115 (plan quantity CY 507.8125 $16.00 $8,125.00 emove P.C.Concrete Curband Gutter and Disposal,complete in place per 116 lineal foot LF 1 168.75 $4.00 $675.00 Remove P.C.Concrete Sidewalkan Driveway and Disposal,complete in 117 place r!quare foot SF 341.076923 $1.30 $443.40 Trench an and Trench 118 (all depths) LF 0 $1.00 $0.00 Reconstruct Concrete Sidewalk to 119 thickness SF 33.3333333 $6.00 $200.00 120 HMAC 2"Type D SY 442 $8.00 $3,536.00 121 10.5"HMAC Type B SY 462.875 $40.00 $18,515.00 122 Sidewalk Concrete Pavin Unit(2-3/8") SF 3066.8 1 $5.00 $15,334.00 123 Sidewalk Ramp Concrete Pavin Unit SF 25.7142857 $7.00 $180.00 124 P.0 Concrete Driveway SF 257.4 $5.00 $1287.00 125 P.C.Concrete Curb&Gutter LF 164.75 $16.00 $2,636.00 126 P.C.Concrete Valley Gutter SF 45 $10.00 $450.00 127 P.C.Concrete Retainer Curb Type A LF 80 $13.00 $1,040.00 128 Filter Inlet Protection EA 1 0.64285714 $70.00 $45.00 ra c ignstop Including 129 WAY,4 WAY,TWO WAY Left Tum EA 0.17142857 $350.00 $60.00 Refieftrized Type I Thermoplastic 130 Pavement Markings 4"Width LF 190 $2.00 $380.00 Renectorizea Type I Thermopra-sti-c 131 Pavement Markings 24"Width LF 3.75 $6.00 $22.50 Reflectorized I ype I I hermoplastic Pavement Markings Wheel Chair 132 Symbol EA 0.2 $200.00 $40.00 Hadnicap Ramp to Structure each 133 wide and 20'long LF 7.5 $80.00 600.00 134 Soddi SY 36.25 $4.00 $145.00 Type A survey Markers with Adjustable 135 Valve Box EA 0.16666667 $300.00 $50.00 136 E2-Duct Bank LF 112.045455 $220.00 $24,650.00 Coordination of Gas Installation- 137 Atmos LS 0 2 000.00 0.00 138 Street Light Including Foundation EA 0 .001 $0.00 139 1"Dia Sch 80 PVC Street Light Conduit LF 0 17.00 $0.00 TOTALS: $78,413.90 0 Page 3 of 4 PW11* Contract Quantity Adjustment/Change Order rev,06/11 Project Name: Southwest Downtown District Infrastructure Improvements(Main St.) Quan.Adj./Change Order No.: 3 Change Order Data contract Time Adjustment Bid Item# Item Description I Unit Unit Price ' Amount (Days) 140 2"Dia Sch 80 PVC Street Light Conduit LF 0 $35.00 $0.00 120V,20A GFI Receptacle with Single 141 Gand Bads Box EA 0 $400.00 $0.00 142 Electrical Pull Box EA 0 $2,500.00 $0.00 143 Street Ughting LightingElectric Wiring LS 0 $8,250.00 $0.00 144 4"Sch 40 PVC irrigation sleeve LF 0 $20.000.00 145 Sch 40 PVC Irrigation Line LS -0.09090909 $9,900.00 900.00 146 2"Water Meter EA 0 $2,000.00 $0.00 147 2"Backflow Preventer EA 0 $3,000.00 $0.00 148 2"Gatevalve EA 0 $500.00 $0.00 Irrigation a ves 6/i ttery uperated 149 Solenoid EA 0 $2,000.00 $0.00 150 Tree Bubblers, including 4'of flex pipe EA 0 $200.00 $0.00 Installation ot free Well with Tree 151 Grate EA 0 $4,000.00 $0.00 152 Installation of Tree Well EA 0 $4,000.00 $0.00 153 5'Curb Inlet EA 0 $2,2 .00 $0.00 154 10 Curb Inlet EA 0 $3,200.00 $0.00 155 3' Area In et EA 4 $1,800.00 $7 200.00 156 PVC, 12"dia LF 5.3846 $65.00 $350.00 157 RCP 18"Dia, LF 16.666666 $90.00 $1500.00 158 10"x18'Trench Drain Type B EA 0.342857 $14,000.00 $4,800.00 159 4'Standard Drainage Manhole EA 1 $5,500.00 $5,500.00 160 12"Pipe(PVC AWWA C-900 Class 200) LF 206.25 $80.00 $16,500.00 161 1-1/2"Service Line LF 0.375 $40.00 $15.00 162 Fire Hydrant Assembly EA 0.6666666 $3,000.00 $2,000.001 163 6"Tappi22 Sleeve and Valve EA 5.94444444 $900.00 $5,350.00 164 12-Gate Valve EA i $21000.00 $2,000.00 TOTALS:1 $44,315.00 1 0 Page 4 of 4 Contract Quantity Adjustment/Change Order reg,owii Project Name: Southwest Downtown District Infrastructure Quan.Adj./Change Order No.: 3 Change Order Data contract Time Adjustment Bid Item# Item Description Unit Unit Price Amount Days 0 MAIN 1 165 12"x12"Tapping Sleeve&Valve EA 0.42857143 $7,000.00 $3,000.00 166 Ductile Iron Fittings 4"through 24" TON 0 $10,000.00 $0.00 167 Single water Service Conection EA 0.5 $2,000.00 $1000.00 168 Barricades,Signs,Traffic Handling Day 12 $40.00 $0.00 Misc Items $0.00 169 Additional Rock Walls Ton 1 26 $400.00 $10,400.00 10 We-m-o-v-&T-and Replacedprin ers at 170 310 W Main LS 1 $320.00 $320.00 Removed and Replacedmp at 171 310 W Main LS 1 $1,230.00 $1,230.00 Removed Stump of the red oa and planted a new tree at 409 W Main 172 St. LS 1 1 $500.00 $500.00 We-moved an mporan —replaecea wood fience at Garcia's Restaurant and 173 removed 4'wide concrete slab LS 1 $350.00 $350.00 Moved sign and installed rock wall 174 around planter box at 308 W Main St. LS 1 $215.00 $215.00 1 Removed esiting fire hydrant at 211 W Maint St.and Replaced with 3' Bury hydrant to match grade of pavers LS 1 $4,000.00 $4,000.00 2- 175 12"x8"Wet Connection EA 2 $3,250.010 $6,500.00 Overlay Items 176 1"Type D Oveday Blair Street ST 2528 $7.50 $18,960.00 7a Trench Repair Deduct Blair St. SY -475 $40.00 ($19,000.00) $0.00 Delays due to Gas 0.00 1 32 TOTALS:1 $27,475.00 1 45