CM-2018-1628 - 2/6/2018It--l— mv. a1:1_ Department: Project Name: City Project ID Number Vendor Justification Page I o(3 Contract Quantity Adjustment/Change Order Transportation Gattis School Road Widening Date: 1/24/18 Change Order/Quantity Adjustment No. i Smith Contracting Co. Company Name 15308 Ginqer st, Austin, Tx 78728 Address 512-990-7640 Phone No. rhe additional items included traffic control that was needed and not Included on the plan set. Some additional pavement markings one additional ped pole assembly due to the reconfiguring of the signal pole due to overhead power lines. One bore under Gattis School road to maintain a water service. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Araval 251 6 257 Amount % Change $1,733,500.45 $1,019.20 $1,019.20 $1,734,519.65 0% $21,343.75 1% $21,343.75 1% $1,755,863.40 $22,362.95 Prepared By: Bill Stablin, Project manager, City of Round Rock 1/24/18 Signature Printed Name, Title, Company Date MjPdJ1 WV6130 Contractor; Hardin Camp II, VP, Smith Contracting Co. Inc. 1/24/18 Signature Printed Name, Title, Company Date City Projects Manager; RL) 1-2 F--15 Mayor/Cia Manager, s G t" : Z -(op i Signature Printed Name, Title Date OM- Za(IF / lv Z9 , .. Contract Quantity Adjustment/ Change Order MON ,.,,, Project Name: Gattis School Road Widening Quan. Adj.; Change Order No.: Chance Order Data Pugs 2 of Item # Item Description Unit Qty. Unit Price Amount Contract Time us Adjustment Adjus(Das 6886003 (COP 1)PED DETECT CONTROLLER UNIT (COP 2)ADD SIDEWALK CLOSED SIGNS EA EA 2 2 $2,933.60 $173.75 $5,867.50 $347.50 1 (COP 3) TRAFFIC CONTROL FOR DIXIE LS 1 $1,222.50 $1,222.50 (COP 5) ADD WATER SERVICE WITH BORE LS 1 $12,959.95 $12,959.95 4 COP 6) INSTALL NO TURN SIGNS & POS LS 1 $946.60 $946.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 soxa $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order MOIWD MOCK IS ir:y Project Name: Gattis School Road Widening Quan. Adj.2Change Order No.: Ouantitv Adiustmant Data Bid Item # Item Description a � Unit Qty. Unit Price Amount Contract Time Adjustment 54 WK ZN PAV NON-REMOV Y 4" SLD LF 42 $1.10 $46.20 78 ELIM EXT PAV MRK & MRKS 8" LF 1 $3.00 $3.00 81 ELIM EXT PAV MRK & MRKS (ARROW) EA 1 $270.00 $270.00 137 PED POLE ASSEMBLY EA 1 $700.00 $700.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1,019,201I r{ City of Round Rock rM ROUN TEXAS OCK Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Smith Contracting Co. Inc. for the Gattis School Road Widening Project, Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/2/2018 Dept Director: Gary D. Hudder, Transportation Director Cost: $22,362.95 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Partially executed CO -QA #1.pdf Department: Transportation Department Text of Legislative File CM -2018-1628 Consider executing Quantity Adjustment/Change Order No. 1 with Smith Contracting Co. Inc. for the Gattis School Road Widening Project. This change order/quantity adjustment #1 includes additional traffic control not shown on the plans, additional pedestrian detect controllers shown on the plans but no pay item for them and a waterline bore for a service line. One pedestrian pole assembly due to the relocation of the traffic signal pole which was too close to the overhead electric lines. Total for the change order items is $21,343.75. the total for the Quantity Adjustments is $1,019.20. Total for both is $22,362.95. Cost: $22,362.95 Source of Funds: RR Transportation and Economic Development Corporation City al Round Rock Page i Printed on 7112018